# Formwork

> Formwork is the mould that holds and shapes wet concrete until it can support itself. Formwork types, materials, parts, formwork vs falsework, and QA tips.

- URL: https://essential.construction/academy/glossary/formwork/
- Author: Kyle Parry (https://essential.construction/about-us/kyle-parry/, https://www.linkedin.com/in/kyleparry/) - Kyle Parry is the founder of Essential Construction. He has worked in construction for more than 20 years, leading projects across Canada for the country's largest contractors and developers.
- Publisher: Essential Construction (https://essential.construction/)
- Last updated: 2026-11-03

---

**Formwork** is the temporary or permanent mould that wet concrete is poured into. It holds the concrete in shape and supports it until it has gained enough strength to support itself. Formwork is made from plywood and lumber or from engineered aluminium, steel or plastic systems, and it works like the walls of a pool: it keeps the concrete in place until it sets.

In the UK and some other markets formwork is also called **shuttering**. For a deeper guide to formwork types, design and stripping times, see our [concrete formwork guide](https://essential.construction/academy/tutorials/a-best-guide-to-formwork/).

## Parts of formwork

- **Sheathing (form face):** plywood, steel or plastic in contact with the concrete. It sets the finish.
- **Studs and joists:** support the sheathing.
- **Walers:** horizontal members that tie studs together and spread loads.
- **Form ties:** hold wall forms together against concrete pressure.
- **Bracing and [shoring](https://essential.construction/academy/glossary/shoring/):** keep forms plumb and carry slab and beam loads to the ground or floor below.
- **Release agent:** stops concrete bonding to the form face.

## Types of formwork

| Type | Description | Typical use |
| --- | --- | --- |
| Timber and plywood | Built on site from lumber and plywood sheets | Small jobs, one-off shapes, footings |
| Engineered panel systems | Reusable aluminium or steel framed panels | Walls, columns and repetitive work |
| Table (flying) forms | Large slab form units moved by crane floor to floor | Repetitive floor plates in towers |
| Climbing and jump forms | Wall forms that climb the core as it rises | Elevator and stair cores |
| Slipform | Continuously moving form with concrete placed as it rises | Silos, cores, some paving |
| Stay-in-place | Forms that remain part of the structure | Insulated concrete forms, composite metal deck |

## Formwork vs falsework

Formwork is the mould in contact with the concrete. **Falsework** is the temporary structure that holds formwork up, such as shores, towers and beams, especially for slabs and bridges. On many sites both are simply called "forms".

## Site tips

- Build to the formwork drawings and engineered system data, especially for wall pour rates and slab shoring.
- Check line, level, dimensions, embeds, sleeves and [rebar](https://essential.construction/academy/glossary/rebar/) cover before the pour.
- Seal joints and openings to stop grout loss, which leaves honeycombing.
- Watch forms during the pour for movement, leaks or failing ties.
- Strip only when the specified strength or time is reached, and reshore where required.

## Related terms

- [Shoring](https://essential.construction/academy/glossary/shoring/)
- [Rebar](https://essential.construction/academy/glossary/rebar/)
- [Post tension](https://essential.construction/academy/glossary/post-tension/)
- [Floor flatness (FF)](https://essential.construction/academy/glossary/floor-flatness/)

## Related templates and guides

- [Concrete formwork in construction: types, design and stripping times](https://essential.construction/academy/tutorials/a-best-guide-to-formwork/)
- [QA checklist: formwork / shuttering](https://essential.construction/files/construction/quality/quality-assurance-checklist-formwork-shuttering/)
- [Work permit: concrete formwork](https://essential.construction/files/construction/logistics/work-permit-concrete-formwork/)
- [Concrete pre-pour checklist template](https://essential.construction/files/construction/quality/concrete-pre-pour-checklist-template/)
- [Formwork health and safety guide](https://essential.construction/files/information/guides/formwork-health-and-safety/)

## Frequently asked questions

### What is the difference between formwork and falsework?

Formwork is the mould that shapes the concrete and is in contact with it. Falsework is the temporary structure that holds the formwork up, such as shores, frames and beams. The terms overlap on site, and in the UK formwork is also called shuttering.

### When can formwork be removed?

When the concrete is strong enough to support itself and any loads on it. Vertical forms on walls and columns usually come off sooner than slab and beam soffit forms. Stripping times depend on the mix, temperature and element, so follow the specification and the engineer's criteria.

### What is formwork made of?

Common materials are plywood and lumber, engineered aluminium or steel panel systems, plastic modular forms, and stay-in-place products such as insulated concrete forms or metal deck. The choice depends on the shape, number of reuses, finish required and budget.

### What is a form tie?

A form tie is a rod or strap that passes through the wall forms and holds the two faces together against the pressure of the wet concrete. After stripping, the tie ends are broken back or removed and the holes are patched or left as a pattern.