# O&M Manual (Operation and Maintenance Manual)

> An O&amp;M manual explains how to operate and maintain a building's systems after construction. What should be in it, who prepares it and when it is due.

- URL: https://essential.construction/academy/glossary/om-manual/
- Author: Kyle Parry (https://essential.construction/about-us/kyle-parry/, https://www.linkedin.com/in/kyleparry/) - Kyle Parry is the founder of Essential Construction. He has worked in construction for more than 20 years, leading projects across Canada for the country's largest contractors and developers.
- Publisher: Essential Construction (https://essential.construction/)
- Last updated: 2026-11-23

---

An **O&M manual** (operation and maintenance manual) is the set of documents a contractor hands over at the end of a construction project explaining how to operate, maintain and repair the building's systems and equipment. It collects manufacturer data, maintenance schedules, warranties, contacts and spare parts lists so the owner's facility team can run the building.

O&M manuals are a standard closeout [submittal](https://essential.construction/academy/glossary/submittal/). In CSI MasterFormat specifications they are usually covered in Division 01, section 01 78 23 Operation and Maintenance Data.

## What should be in an O&M manual?

- Project directory: contractor, subcontractors, suppliers and service contacts
- System descriptions and how the systems work together
- Operating instructions: start-up, shutdown, seasonal changeover and emergency procedures
- Preventive maintenance schedules and procedures, with lubrication and filter lists
- Approved product data and [cut sheets](https://essential.construction/academy/glossary/cut-sheet/), with model and serial numbers
- Wiring diagrams, control sequences and valve charts
- Spare parts lists and recommended attic stock
- Warranties and guarantees, with start dates
- Test, balancing and commissioning reports
- Finish schedules and cleaning instructions for architectural products
- Training records for the owner's staff

### Systems that typically need O&M data

| Discipline | Examples |
| --- | --- |
| Mechanical | [Air handling units](https://essential.construction/academy/glossary/air-handling-unit/), [heat pumps](https://essential.construction/academy/glossary/heat-pump/), [fan coil units](https://essential.construction/academy/glossary/fan-coil-unit/), boilers, pumps, controls |
| Electrical | Switchgear, [VFDs](https://essential.construction/academy/glossary/variable-frequency-drive/), generators, lighting controls, fire alarm |
| Plumbing and fire protection | Water heaters, backflow preventers, sprinkler systems, fixtures |
| Architectural | Roofing, doors and hardware, [access control](https://essential.construction/academy/glossary/mag-lock/), flooring, glazing |
| Conveying | Elevators, escalators |

## Who prepares it and when

Each subcontractor and supplier provides the O&M data for its own work, and the general contractor compiles, checks and submits the full set. The design team reviews it for completeness, and the owner's facility team receives it, often with training sessions. Many specifications require a draft well before [substantial completion](https://essential.construction/academy/glossary/substantial-completion/) so it can be used during commissioning and training, with the final version at closeout. Delivery is commonly a condition of final payment and release of [retainage](https://essential.construction/academy/glossary/retainage/).

## O&M manual vs as-builts vs closeout package

| Document | What it covers |
| --- | --- |
| O&M manual | How to operate and maintain the installed systems and products |
| [As-built drawings](https://essential.construction/academy/glossary/as-built-drawings/) | Where things actually are and how they were built |
| Closeout package | Everything handed over: O&M manuals, as-builts, warranties, certificates, keys, attic stock and final waivers |

In the UK, O&M manuals are usually handed over with the health and safety file required under the CDM Regulations 2015.

## Tips for O&M manuals owners actually use

- Collect O&M data with the original submittals instead of chasing it at the end.
- Include only the models actually installed; cross out options on generic data sheets.
- Organize by specification section or system, with a clear index and bookmarks in the PDF.
- Agree the format (searchable PDF, asset register, CMMS import) at the start of the job.
- Put warranty start dates and contacts up front; they are what the owner looks for first.

## Templates for closeout and handover

A standard handover letter and certificate lists what was delivered, when, and to whom, so there's no argument at final payment about whether the O&M manuals were received.

- [Turn Over Letters and Certificate of Completion](https://essential.construction/files/construction/turn-over-letters-and-certificate-of-completion/)
- [Construction Transmittal Template](https://essential.construction/files/construction/administration/construction-transmittal/) (free): record each O&M volume delivered

For the full handover checklist, see [Construction Project Closeout](https://essential.construction/academy/tutorials/construction-project-closeout-everyones-favourite-part-of-the-project/).

## Related terms

- [As-Built Drawings](https://essential.construction/academy/glossary/as-built-drawings/)
- [Submittal](https://essential.construction/academy/glossary/submittal/)
- [Cut Sheet](https://essential.construction/academy/glossary/cut-sheet/)
- [Substantial Completion](https://essential.construction/academy/glossary/substantial-completion/)
- [Punch List](https://essential.construction/academy/glossary/punch-list/)

## Frequently asked questions

### What does O&M manual mean?

O&M stands for operation and maintenance. An O&M manual is the handover document that tells the building owner how to operate, maintain and service the systems and equipment installed during construction, with manufacturer data, schedules, warranties and contacts.

### What should be in an O&M manual?

A contact directory, system descriptions, operating and emergency procedures, maintenance schedules, product data for the installed equipment, wiring and control diagrams, spare parts lists, warranties, and test and commissioning reports. The project specifications list the exact requirements.

### Who is responsible for providing the O&M manual?

The general contractor is responsible for compiling and submitting it, with each subcontractor and supplier providing the information for its own work. The design team reviews it, and it is usually required before final payment.