# Scope of Work [SOW]

> A scope of work defines exactly what work a construction contract or subcontract includes and excludes. What to include, example wording and common mistakes.

- URL: https://essential.construction/academy/glossary/scope-of-work/
- Author: Kyle Parry (https://essential.construction/about-us/kyle-parry/, https://www.linkedin.com/in/kyleparry/) - Kyle Parry is the founder of Essential Construction. He has worked in construction for more than 20 years, leading projects across Canada for the country's largest contractors and developers.
- Publisher: Essential Construction (https://essential.construction/)
- Last updated: 2026-11-23

---

A **scope of work** (SOW) in construction is the part of a contract or subcontract that describes exactly what work is included: the tasks, materials, deliverables, standards, location and limits of the work, plus what is excluded. It sets what the price covers, so anything outside it becomes a change.

On a prime contract the scope is mostly defined by the drawings and specifications. On subcontracts and small jobs, a written scope of work is often the main document that says who does what.

## What to include in a construction scope of work

1. **Project information:** name, address, owner, general contractor, and the drawings and specifications (with revision dates) the scope is based on.
2. **Work included:** a clear description of the tasks by trade, area or phase, referencing spec sections.
3. **Materials and equipment:** who supplies what, including owner-furnished items.
4. **Exclusions:** work that is specifically not included. This is the section that prevents most disputes.
5. **Interfaces:** where this scope stops and the next trade starts (for example "blocking by framer, accessories by others").
6. **General requirements:** cleanup, hoisting, layout, permits, testing, temporary protection, safety, working hours.
7. **Schedule and milestones:** start, durations, key dates and sequencing.
8. **Submittals and closeout:** [submittals](https://essential.construction/academy/glossary/submittal/), warranties, [as-built drawings](https://essential.construction/academy/glossary/as-built-drawings/) and [O&M manuals](https://essential.construction/academy/glossary/om-manual/) required.
9. **Acceptance criteria:** inspections, tests and how completion is confirmed.
10. **Assumptions and allowances:** anything priced on an assumption, such as soil conditions or quantities.

## Example scope of work wording

A short subcontract example for interior painting:

- *Included:* Supply and apply primer and two finish coats to all new gypsum board walls and ceilings in Areas A and B per Section 09 91 23 and the finish schedule. Includes surface prep, masking, daily cleanup and touch-ups at the [punch list](https://essential.construction/academy/glossary/punch-list/).
- *Excluded:* Exterior painting, painting of mechanical equipment, wall covering, drywall repair beyond minor patching, after-hours work.
- *By others:* Drywall finishing to Level 4, door frame priming by the frame supplier.

## Scope of work vs statement of work vs specifications

| Document | What it does | Typical use |
| --- | --- | --- |
| Scope of work | Describes the work included and excluded for a contract or trade | Subcontracts, bid packages, small jobs |
| Statement of work | A broader document that includes the scope plus schedule, deliverables, payment and acceptance terms | Government and service contracts |
| Specifications | Technical requirements for materials, workmanship and testing | Prime contracts, organized by CSI MasterFormat division |
| Project scope statement | A project management summary of objectives, deliverables and boundaries | Owner and PM planning, often with a [WBS](https://essential.construction/academy/glossary/work-break-down-structure/) |

## Who writes it and when

The owner's design team defines the overall scope in the contract documents. The general contractor's estimators and project managers write trade scopes when they build bid packages during preconstruction, and refine them during bid leveling before subcontracts are signed. Subcontractors review the scope against their quote and flag anything they did not price. After award, any work beyond the scope goes through a [change order](https://essential.construction/academy/glossary/change-order/).

## Common scope of work mistakes

- "Complete as per drawings and specs" with no trade breakdown, which leaves gaps between trades.
- No exclusions list, or exclusions that contradict the inclusions.
- Missing general requirements such as hoisting, cleanup or temporary protection.
- Scopes based on an old drawing revision.
- Vague language: "as required," "industry standard," "etc."

## Scope of work templates

A structured template makes you answer the included, excluded and by-others questions for every trade, so gaps show up before the subcontract is signed, not on site.

- [Scope of Work Template](https://essential.construction/files/pre-construction/estimating/scope-of-work-template/)
- [Subcontractor Scope & Agreement](https://essential.construction/files/business-operations/legal/subcontractor-scope-agreement/): scope and subcontract terms in one document
- [Estimate Assumptions, Inclusions and Exclusions](https://essential.construction/files/pre-construction/estimating/estimate-assumptions-inclusions-and-exclusions/)

Planning a new job? See [The Ultimate Guide to Preconstruction Planning](https://essential.construction/academy/tutorials/the-ultimate-guide-to-preconstruction-planning/).

## Related terms

- [Change Order](https://essential.construction/academy/glossary/change-order/)
- [Work Breakdown Structure (WBS)](https://essential.construction/academy/glossary/work-break-down-structure/)
- [Schedule of Values](https://essential.construction/academy/glossary/schedule-of-values/)
- [Value Engineering](https://essential.construction/academy/glossary/value-engineering/)
- [Back Charge](https://essential.construction/academy/glossary/back-charge/)

## Frequently asked questions

### What should be in a scope of work?

At minimum: the project and documents it is based on, a description of the work included, materials and who supplies them, exclusions, interfaces with other trades, schedule, submittal and closeout requirements, and how the work will be inspected and accepted. Exclusions and interfaces prevent the most disputes.

### What is the difference between scope of work and statement of work?

A scope of work describes what work is included and excluded. A statement of work is a wider document, common in government and service contracts, that includes the scope plus deliverables, schedule, payment terms and acceptance criteria. In construction subcontracts the two terms are often used loosely.

### Who writes the scope of work in construction?

The design team defines the overall project scope in the drawings and specifications. General contractors' estimators and project managers write the individual trade scopes for bid packages and subcontracts, and subcontractors review and confirm them before signing.

### What happens if work is not in the scope of work?

Work outside the agreed scope is normally extra work. The contractor or subcontractor should request a change order or written direction before doing it, so price and time can be agreed. Doing it without authorization risks not being paid.