{"id":11506,"date":"2020-01-26T03:42:08","date_gmt":"2020-01-26T03:42:08","guid":{"rendered":"https:\/\/essential.construction\/cnstrctr\/glossary\/ccn\/"},"modified":"2026-11-03T10:07:00","modified_gmt":"2026-11-03T17:07:00","slug":"ccn","status":"publish","type":"glossary","link":"https:\/\/essential.construction\/academy\/glossary\/ccn\/","title":{"rendered":"CCN"},"content":{"rendered":"<p>A <strong>CCN (Contemplated Change Notice)<\/strong> is a formal contract document issued by the consultant, architect or owner asking the contractor to price a potential change to the work. The contractor returns a quote, and if the owner accepts it the CCN becomes a change order; it does not authorize the work on its own.<\/p>\n<p>CCN is mostly Canadian usage. The same step is called a proposed change notice (PCN), change request or request for pricing elsewhere, and a proposal request in AIA contracts (AIA G709). In general project management, CCN can also mean a change control note.<\/p>\n<h2>How the CCN process works<\/h2>\n<ol>\n<li>The consultant issues a numbered CCN describing the change, with sketches or revised drawings and a date for the response.<\/li>\n<li>The contractor gets subcontractor and supplier quotes, prices labour, material and equipment, adds the markups allowed by the contract, and states any schedule impact.<\/li>\n<li>The consultant reviews and negotiates the quote.<\/li>\n<li>If the owner accepts, a <strong>change order<\/strong> is issued and signed, adjusting the contract price and time.<\/li>\n<li>If the work can&#8217;t wait for agreement, the owner can issue a <strong>change directive<\/strong> to proceed, with the price settled later.<\/li>\n<\/ol>\n<h2>CCN vs change order vs change directive<\/h2>\n<table>\n<thead>\n<tr>\n<th>Document<\/th>\n<th>Purpose<\/th>\n<th>Authorizes work?<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>CCN<\/td>\n<td>Request to price a possible change<\/td>\n<td>No<\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/essential.construction\/academy\/glossary\/change-order\/\">Change order<\/a><\/td>\n<td>Agreed change to scope, price and time<\/td>\n<td>Yes<\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/essential.construction\/academy\/glossary\/change-directive\/\">Change directive<\/a><\/td>\n<td>Instruction to proceed before price is agreed<\/td>\n<td>Yes<\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/essential.construction\/academy\/glossary\/site-instruction\/\">Site instruction<\/a><\/td>\n<td>Clarification with no change in price or time<\/td>\n<td>Yes, if no cost impact<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>Tips for contractors<\/h2>\n<ul>\n<li>Log every CCN with its number, date, value and status.<\/li>\n<li>Respond by the due date and state how long your price is valid.<\/li>\n<li>Don&#8217;t start CCN work without a signed change order or directive.<\/li>\n<\/ul>\n<h2>Related terms<\/h2>\n<ul>\n<li><a href=\"https:\/\/essential.construction\/academy\/glossary\/change-order\/\">Change Order (CO)<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/academy\/glossary\/change-directive\/\">Change Directive (CD)<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/academy\/glossary\/site-instruction\/\">Site Instruction (SI)<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/academy\/glossary\/contingency\/\">Contingency<\/a><\/li>\n<\/ul>\n<h2>Related templates and guides<\/h2>\n<ul>\n<li><a href=\"https:\/\/essential.construction\/academy\/tutorials\/your-guide-to-submitting-a-construction-change-request\/\">Your Guide to Submitting a Construction Change Request<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/files\/construction\/administration\/change-order-template\/\">Change Order Template<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/files\/construction\/administration\/change-order-log\/\">Change Order Log<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/files\/pre-construction\/estimating\/request-for-pricing-rfp\/\">Request for Pricing (RFP)<\/a><\/li>\n<\/ul>\n<h2>Frequently asked questions<\/h2>\n<h3>What does CCN stand for in construction?<\/h3>\n<p>CCN stands for Contemplated Change Notice: a request from the consultant or owner for the contractor to price a possible change. It is common on Canadian projects. Some firms use Construction Change Notice for the same document.<\/p>\n<h3>Does a CCN authorize the contractor to do the work?<\/h3>\n<p>No. A CCN only asks for a price. The work is authorized when a change order is signed, or when the owner issues a change directive telling the contractor to proceed before the price is agreed.<\/p>\n<h3>What is the difference between a CCN and a change order?<\/h3>\n<p>A CCN is the question: what would this change cost and how long would it take? A change order is the answer once it is accepted: a signed document that changes the contract scope, price and time.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A CCN (Contemplated Change Notice) is a formal contract document issued by the consultant, architect or owner asking the contractor to price a potential change<\/p>\n","protected":false},"author":1,"featured_media":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"glossary-categories":[465],"glossary-tags":[],"class_list":["post-11506","glossary","type-glossary","status-publish","hentry","glossary-categories-division-01-general-requirements"],"_links":{"self":[{"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary\/11506","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary"}],"about":[{"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/types\/glossary"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/comments?post=11506"}],"version-history":[{"count":2,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary\/11506\/revisions"}],"predecessor-version":[{"id":20339,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary\/11506\/revisions\/20339"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/media?parent=11506"}],"wp:term":[{"taxonomy":"glossary-categories","embeddable":true,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary-categories?post=11506"},{"taxonomy":"glossary-tags","embeddable":true,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary-tags?post=11506"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}