{"id":11519,"date":"2020-01-26T03:42:10","date_gmt":"2020-01-26T03:42:10","guid":{"rendered":"https:\/\/essential.construction\/cnstrctr\/glossary\/change-directive\/"},"modified":"2026-11-03T10:07:36","modified_gmt":"2026-11-03T17:07:36","slug":"change-directive","status":"publish","type":"glossary","link":"https:\/\/essential.construction\/academy\/glossary\/change-directive\/","title":{"rendered":"Change Directive [CD]"},"content":{"rendered":"<p>A change directive is a written instruction, issued by the owner or by the consultant on the owner&#8217;s behalf, that directs the contractor to carry out a change in the work before price or time has been agreed. In the US it is usually called a construction change directive (CCD). It puts the contractor in a position where they must carry out the work, with pricing provided during or after the work.<\/p>\n<h2>When a change directive is used<\/h2>\n<ul>\n<li>The change is urgent and waiting for agreed pricing would delay the job.<\/li>\n<li>The owner and contractor cannot agree on the cost or time of a proposed change.<\/li>\n<li>A safety or code issue has to be fixed right away.<\/li>\n<\/ul>\n<h2>How it works<\/h2>\n<ol>\n<li>The directive describes the change and states how it will be valued (for example lump sum, unit prices or cost plus a fee).<\/li>\n<li>The contractor proceeds with the work.<\/li>\n<li>The contractor tracks costs, normally on daily time-and-material sheets signed by the consultant or owner&#8217;s representative.<\/li>\n<li>Pricing and any time impact are submitted and reviewed.<\/li>\n<li>Once agreed, the directive is converted into a <a href=\"https:\/\/essential.construction\/academy\/glossary\/change-order\/\">change order<\/a>.<\/li>\n<\/ol>\n<p>The AIA form in the US is G714, Construction Change Directive. Canadian CCDC 2 contracts call it a change directive.<\/p>\n<h2>Change directive vs change order<\/h2>\n<table>\n<thead>\n<tr>\n<th><\/th>\n<th>Change directive<\/th>\n<th>Change order<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Price and time agreed?<\/td>\n<td>No, settled later<\/td>\n<td>Yes, before signing<\/td>\n<\/tr>\n<tr>\n<td>Contractor must proceed?<\/td>\n<td>Yes, on receipt<\/td>\n<td>Once signed<\/td>\n<\/tr>\n<tr>\n<td>Signed by<\/td>\n<td>Owner and consultant<\/td>\n<td>Owner and contractor (and architect on AIA)<\/td>\n<\/tr>\n<tr>\n<td>End result<\/td>\n<td>Becomes a change order once agreed<\/td>\n<td>Final contract adjustment<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>Tips for contractors<\/h2>\n<ul>\n<li>Check the valuation method stated in the directive before starting.<\/li>\n<li>Keep detailed daily records of labour, equipment and materials, and get them signed.<\/li>\n<li>Flag schedule impact in writing straight away.<\/li>\n<li>Log the directive in your change order log so it is not missed at billing.<\/li>\n<\/ul>\n<h2>Related terms<\/h2>\n<ul>\n<li><a href=\"https:\/\/essential.construction\/academy\/glossary\/change-order\/\">Change Order<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/academy\/glossary\/site-instruction\/\">Site Instruction<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/academy\/glossary\/ccn\/\">CCN<\/a><\/li>\n<\/ul>\n<h2>Related templates and guides<\/h2>\n<ul>\n<li><a href=\"https:\/\/essential.construction\/files\/construction\/administration\/change-order-log\/\">Change Order Log<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/files\/construction\/administration\/confirmation-of-verbal-instruction\/\">Confirmation of Verbal Instruction<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/academy\/tutorials\/common-types-of-construction-contracts-and-their-use\/\">Common Types of Construction Contracts and Their Use<\/a><\/li>\n<\/ul>\n<h2>Frequently asked questions<\/h2>\n<h3>Does a contractor have to follow a change directive?<\/h3>\n<p>Yes. Under standard contracts such as AIA A201 and CCDC 2, the contractor must proceed with the work described in a change directive even though price and time are not yet agreed. Disagreements over the final valuation are handled afterward through the contract&#8217;s change and dispute provisions.<\/p>\n<h3>Is a change directive the same as a change order?<\/h3>\n<p>No. A change order records an agreed change to scope, price and time. A change directive orders the work before that agreement. Once the parties agree on the adjustment, the change directive is converted into a change order.<\/p>\n<h3>How is the cost of a change directive determined?<\/h3>\n<p>The directive should state the method, typically a lump sum, agreed unit prices, or actual cost plus an agreed fee. Where cost-plus is used, the contractor&#8217;s daily records of labour, materials and equipment become the basis of the final change order.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A change directive is a written instruction, issued by the owner or by the consultant on the owner&#8217;s behalf, that directs the contractor to carry<\/p>\n","protected":false},"author":1,"featured_media":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"glossary-categories":[465],"glossary-tags":[],"class_list":["post-11519","glossary","type-glossary","status-publish","hentry","glossary-categories-division-01-general-requirements"],"_links":{"self":[{"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary\/11519","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary"}],"about":[{"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/types\/glossary"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/comments?post=11519"}],"version-history":[{"count":1,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary\/11519\/revisions"}],"predecessor-version":[{"id":20352,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary\/11519\/revisions\/20352"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/media?parent=11519"}],"wp:term":[{"taxonomy":"glossary-categories","embeddable":true,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary-categories?post=11519"},{"taxonomy":"glossary-tags","embeddable":true,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary-tags?post=11519"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}