{"id":11536,"date":"2020-01-26T03:42:12","date_gmt":"2020-01-26T03:42:12","guid":{"rendered":"https:\/\/essential.construction\/cnstrctr\/glossary\/mockup\/"},"modified":"2026-11-03T10:08:18","modified_gmt":"2026-11-03T17:08:18","slug":"mockup","status":"publish","type":"glossary","link":"https:\/\/essential.construction\/academy\/glossary\/mockup\/","title":{"rendered":"Mockup"},"content":{"rendered":"<p>A mockup (or mock-up) is a full-size sample of a building element or assembly, built before the main work starts so the owner, consultants and trades can check appearance, workmanship and how materials come together. Where multiple materials meet, the consultant or owner may request one. Mockups are a great way to control quality because many interface problems can be worked out in advance, before they are repeated across the building.<\/p>\n<h2>Types of mockups<\/h2>\n<table>\n<thead>\n<tr>\n<th>Type<\/th>\n<th>Purpose<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Visual mockup<\/td>\n<td>Approve colour, texture, pattern and workmanship, such as brick, mortar and joint tooling<\/td>\n<\/tr>\n<tr>\n<td>Performance mockup<\/td>\n<td>Test an assembly, usually for air and water penetration and structural performance, often by an independent testing agency<\/td>\n<\/tr>\n<tr>\n<td>Standalone mockup<\/td>\n<td>Built separately on site or at a lab and removed after approval<\/td>\n<\/tr>\n<tr>\n<td>In-place (integrated) mockup<\/td>\n<td>Built as part of the permanent work and allowed to remain if accepted<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>Common mockups<\/h2>\n<ul>\n<li>Masonry panels showing brick, mortar colour, bond pattern and flashing<\/li>\n<li><a href=\"https:\/\/essential.construction\/academy\/glossary\/curtainwall\/\">Curtain wall<\/a> and window assemblies, including field water testing<\/li>\n<li>Exterior cladding, sealant joints and transitions between systems<\/li>\n<li>Typical hotel rooms or residential suites<\/li>\n<li>Architectural concrete finishes, tile layouts and millwork<\/li>\n<\/ul>\n<h2>Planning and approval tips<\/h2>\n<ul>\n<li>Check the specifications for every mockup required; they are usually listed in Division 01 quality requirements and in the technical sections.<\/li>\n<li>Put mockups in the schedule early, allowing time for fabrication, testing, revisions and approval.<\/li>\n<li>Agree acceptance criteria and who signs off before building it.<\/li>\n<li>Record approval in writing with photos, then protect the mockup. It becomes the quality benchmark for the rest of the work.<\/li>\n<li>Confirm in writing whether an in-place mockup can stay.<\/li>\n<\/ul>\n<h2>Related terms<\/h2>\n<ul>\n<li><a href=\"https:\/\/essential.construction\/academy\/glossary\/curtainwall\/\">Curtainwall<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/academy\/glossary\/running-bond\/\">Running Bond<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/academy\/glossary\/cut-sheet\/\">Cut Sheet<\/a><\/li>\n<\/ul>\n<h2>Related templates and guides<\/h2>\n<ul>\n<li><a href=\"https:\/\/essential.construction\/files\/construction\/scheduling\/mockup-schedule-template\/\">Mockup Schedule Template<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/files\/construction\/quality\/curtainwall-quality-control-checklist\/\">Curtainwall &#8211; Quality Control Checklist<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/academy\/tutorials\/controlling-quality-on-the-jobsite\/\">Controlling Quality on the Construction Site<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/academy\/tutorials\/managing-construction-submittals\/\">Construction Submittals: Types, Process, Log and Examples<\/a><\/li>\n<\/ul>\n<h2>Frequently asked questions<\/h2>\n<h3>What is the purpose of a mockup in construction?<\/h3>\n<p>A mockup lets the team see and test the real work at full size before it is repeated. It confirms appearance, catches detailing and sequencing problems at interfaces, and sets an agreed quality standard that the rest of the installation is measured against.<\/p>\n<h3>What is the difference between a mockup and a sample?<\/h3>\n<p>A sample is a single product, such as one brick or a finish chip, submitted for approval. A mockup is an assembly of materials built together at full size, showing how they look and perform as installed, including joints, flashings and workmanship.<\/p>\n<h3>Can a mockup become part of the finished building?<\/h3>\n<p>Yes, if it is an in-place mockup and the specifications allow it. Once accepted it can remain as part of the permanent work. Standalone mockups are normally demolished after the related work is complete and accepted.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A mockup (or mock-up) is a full-size sample of a building element or assembly, built before the main work starts so the owner, consultants and<\/p>\n","protected":false},"author":1,"featured_media":2111,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"glossary-categories":[465,470],"glossary-tags":[486,487,488],"class_list":["post-11536","glossary","type-glossary","status-publish","has-post-thumbnail","hentry","glossary-categories-division-01-general-requirements","glossary-categories-division-09-finishes","glossary-tags-materials","glossary-tags-quality","glossary-tags-samples"],"_links":{"self":[{"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary\/11536","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary"}],"about":[{"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/types\/glossary"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/comments?post=11536"}],"version-history":[{"count":1,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary\/11536\/revisions"}],"predecessor-version":[{"id":20365,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary\/11536\/revisions\/20365"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/media?parent=11536"}],"wp:term":[{"taxonomy":"glossary-categories","embeddable":true,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary-categories?post=11536"},{"taxonomy":"glossary-tags","embeddable":true,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary-tags?post=11536"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}