{"id":11541,"date":"2020-01-26T03:42:12","date_gmt":"2020-01-26T03:42:12","guid":{"rendered":"https:\/\/essential.construction\/cnstrctr\/glossary\/joist\/"},"modified":"2026-11-03T10:08:32","modified_gmt":"2026-11-03T17:08:32","slug":"joist","status":"publish","type":"glossary","link":"https:\/\/essential.construction\/academy\/glossary\/joist\/","title":{"rendered":"Joist"},"content":{"rendered":"<p>A <strong>joist<\/strong> is a length of timber or steel supporting part of the structure of a building, typically arranged in parallel series to support a floor or ceiling and perpendicular to a beam.<\/p>\n<p>Joists span between beams, walls or girders and carry the floor deck, ceiling or flat roof above them. They are spaced at regular intervals so the subfloor or deck can span from one joist to the next.<\/p>\n<h2>Types of joists<\/h2>\n<table>\n<thead>\n<tr>\n<th>Type<\/th>\n<th>Description<\/th>\n<th>Typical use<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Sawn lumber<\/td>\n<td>Solid wood, e.g. 2&#215;8, 2&#215;10, 2&#215;12<\/td>\n<td>Houses and small buildings<\/td>\n<\/tr>\n<tr>\n<td>Engineered wood I-joist<\/td>\n<td>Wood flanges with an OSB or plywood web<\/td>\n<td>Longer spans, straighter and lighter floors<\/td>\n<\/tr>\n<tr>\n<td>Open-web floor truss<\/td>\n<td>Factory-built truss of small members<\/td>\n<td>Long spans with room for ducts and pipes<\/td>\n<\/tr>\n<tr>\n<td>Steel bar joist (open-web steel joist)<\/td>\n<td>Steel angles with a web of bars or angles<\/td>\n<td>Commercial roofs and floors on steel framing<\/td>\n<\/tr>\n<tr>\n<td>Cold-formed steel joist<\/td>\n<td>Light-gauge C-shaped steel sections<\/td>\n<td>Mid-rise and non-combustible framing<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>Joist spacing<\/h2>\n<p>In North American wood framing, floor joists are most often spaced <strong>16 inches on centre<\/strong>, with 12 or 24 inches used depending on span, load and subfloor. In metric markets such as the UK and Australia, 400 mm, 450 mm and 600 mm centres are common. Size and spacing come from the structural drawings or the span tables in the building code, such as the IRC in the US or Part 9 of the National Building Code in Canada.<\/p>\n<h2>Joist vs beam vs rafter<\/h2>\n<ul>\n<li><strong>Joist:<\/strong> closely spaced member carrying the floor, ceiling or flat roof directly.<\/li>\n<li><strong>Beam (or girder):<\/strong> larger member that carries the joists and transfers the load to posts, columns or walls.<\/li>\n<li><strong>Rafter:<\/strong> sloped member supporting a pitched roof. A ceiling joist often ties the rafters together at the bottom.<\/li>\n<li><strong>Truss:<\/strong> a triangulated assembly that can act as a joist or rafter over longer spans.<\/li>\n<\/ul>\n<h2>Parts of a joist floor<\/h2>\n<ul>\n<li><strong>Rim (band) joist:<\/strong> caps the joist ends around the perimeter.<\/li>\n<li><strong>Blocking or bridging:<\/strong> short pieces between joists that keep them upright and spread loads.<\/li>\n<li><strong>Joist hangers:<\/strong> metal connectors that hang joists from a beam or ledger.<\/li>\n<li><strong>Trimmer and header joists:<\/strong> frame openings for stairs and shafts.<\/li>\n<\/ul>\n<h2>Site tips<\/h2>\n<ul>\n<li>Use the hanger and fastener type the manufacturer or engineer specifies, and fill every nail hole required.<\/li>\n<li>Do not notch or drill joists outside the code limits or the I-joist manufacturer&#8217;s hole chart.<\/li>\n<li>Crown sawn joists the same way (bow up) so floors stay flat.<\/li>\n<li>Glue and screw subfloor where specified to reduce squeaks.<\/li>\n<li>Coordinate service routes early, especially through I-joists and trusses.<\/li>\n<\/ul>\n<h2>Related terms<\/h2>\n<ul>\n<li><a href=\"https:\/\/essential.construction\/academy\/glossary\/c-channel\/\">C-channel<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/academy\/glossary\/camber\/\">Camber<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/academy\/glossary\/foundation\/\">Foundation<\/a><\/li>\n<\/ul>\n<h2>Related templates and guides<\/h2>\n<ul>\n<li><a href=\"https:\/\/essential.construction\/academy\/tutorials\/types-sawn-lumber\/\">Types of sawn lumber<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/files\/information\/white-papers\/code-conforming-wood-design-2018\/\">Code conforming wood design 2018<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/academy\/tutorials\/the-ultimate-guide-to-the-design-and-construction-of-structural-steel\/\">Guide to the design and construction of structural steel<\/a><\/li>\n<\/ul>\n<h2>Frequently asked questions<\/h2>\n<h3>What is the difference between a joist and a beam?<\/h3>\n<p>Joists are smaller, closely spaced members that carry the floor, ceiling or roof deck directly. Beams are larger members that carry the joists and transfer their load to columns, posts or walls. A floor typically has many joists sitting on or hung from a few beams.<\/p>\n<h3>How far apart are floor joists?<\/h3>\n<p>In North American wood framing, floor joists are commonly spaced 16 inches on centre, with 12 and 24 inches also used depending on span, load and subfloor. In metric markets 400 mm, 450 mm and 600 mm centres are common. The drawings or span tables set the spacing for each floor.<\/p>\n<h3>Can you drill or notch a floor joist?<\/h3>\n<p>Only within the limits the code or manufacturer allows. Building codes limit the size and location of notches and holes in sawn lumber joists, and engineered I-joists have their own hole charts. Cutting outside those limits can weaken the floor, so check before drilling for services.<\/p>\n<h3>What is a rim joist?<\/h3>\n<p>A rim joist (also called a band or header joist) runs around the perimeter of a floor frame, capping the ends of the joists. It closes off the floor, helps hold joists upright, and transfers loads from walls above down to the foundation or wall below.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A joist is a length of timber or steel supporting part of the structure of a building, typically arranged in parallel series to support a<\/p>\n","protected":false},"author":1,"featured_media":2443,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"glossary-categories":[468,469],"glossary-tags":[510,511,512,513,514,515,516,517,518],"class_list":["post-11541","glossary","type-glossary","status-publish","has-post-thumbnail","hentry","glossary-categories-division-05-metals","glossary-categories-division-06-millwork","glossary-tags-beam","glossary-tags-beam-support","glossary-tags-construction-joist","glossary-tags-framing","glossary-tags-framing-a-floor-system","glossary-tags-how-to-frame-a-house","glossary-tags-joist","glossary-tags-joist-framing","glossary-tags-wood-joist"],"_links":{"self":[{"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary\/11541","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary"}],"about":[{"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/types\/glossary"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/comments?post=11541"}],"version-history":[{"count":1,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary\/11541\/revisions"}],"predecessor-version":[{"id":20370,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary\/11541\/revisions\/20370"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/media?parent=11541"}],"wp:term":[{"taxonomy":"glossary-categories","embeddable":true,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary-categories?post=11541"},{"taxonomy":"glossary-tags","embeddable":true,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary-tags?post=11541"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}