{"id":11546,"date":"2020-01-26T03:42:12","date_gmt":"2020-01-26T03:42:12","guid":{"rendered":"https:\/\/essential.construction\/cnstrctr\/glossary\/scarifying\/"},"modified":"2020-01-26T03:42:12","modified_gmt":"2020-01-26T03:42:12","slug":"scarifying","status":"publish","type":"glossary","link":"https:\/\/essential.construction\/academy\/glossary\/scarifying\/","title":{"rendered":"Scarifying"},"content":{"rendered":"<p>Scarifying in construction is the act of removing part of (typically the top) of concrete slabs or structure. If a slab is too high for the floor finish you may opt to scarify. It can be done with a scarifying machine and can bring the surface of something down a few inches. This is typically a very expensive option and should be avoided wherever possible.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Scarifying in construction is the act of removing part of (typically the top) of concrete slabs or structure. If a slab is too high for<\/p>\n","protected":false},"author":1,"featured_media":3009,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"glossary-categories":[471,466],"glossary-tags":[547,548,549,550,551,478,552,553],"class_list":["post-11546","glossary","type-glossary","status-publish","has-post-thumbnail","hentry","glossary-categories-division-02-site-works","glossary-categories-division-03-concrete","glossary-tags-commercial-scarifying","glossary-tags-concrete-coring","glossary-tags-concrete-cutting","glossary-tags-concrete-slab-removal","glossary-tags-concrete-slabs","glossary-tags-construction","glossary-tags-scarifying","glossary-tags-scarifying-construction"],"_links":{"self":[{"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary\/11546","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary"}],"about":[{"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/types\/glossary"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/comments?post=11546"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary\/11546\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/essential.construction\/academy\/wp-json\/"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/media?parent=11546"}],"wp:term":[{"taxonomy":"glossary-categories","embeddable":true,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary-categories?post=11546"},{"taxonomy":"glossary-tags","embeddable":true,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary-tags?post=11546"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}