{"id":20473,"date":"2026-11-23T10:59:54","date_gmt":"2026-11-23T17:59:54","guid":{"rendered":"https:\/\/essential.construction\/academy\/glossary\/draw-request\/"},"modified":"2026-11-23T10:59:54","modified_gmt":"2026-11-23T17:59:54","slug":"draw-request","status":"publish","type":"glossary","link":"https:\/\/essential.construction\/academy\/glossary\/draw-request\/","title":{"rendered":"Draw Request"},"content":{"rendered":"<p>A <strong>draw request<\/strong> is a request to a construction lender to release (&#8220;draw&#8221;) part of a construction loan to pay for work completed to date. The borrower, usually the owner or developer, submits it with the contractor&#8217;s <a href=\"https:\/\/essential.construction\/academy\/glossary\/pay-application\/\">pay application<\/a>, invoices and lien waivers, and the lender typically inspects progress before funding.<\/p>\n<p>Construction loans are not paid out in one lump sum. They are released in draws as the work progresses, so the loan balance tracks the value actually built.<\/p>\n<h2>What&#8217;s in a draw request package?<\/h2>\n<ul>\n<li>The lender&#8217;s draw request form or cover letter, signed by the borrower<\/li>\n<li>The contractor&#8217;s pay application and continuation sheet against the <a href=\"https:\/\/essential.construction\/academy\/glossary\/schedule-of-values\/\">schedule of values<\/a><\/li>\n<li>A budget reconciliation showing hard and soft costs, funds used and remaining<\/li>\n<li>Invoices for soft costs (design fees, permits, insurance)<\/li>\n<li>Conditional or unconditional <a href=\"https:\/\/essential.construction\/academy\/glossary\/lien-waiver\/\">lien waivers<\/a> from the contractor and major subcontractors and suppliers<\/li>\n<li>Approved <a href=\"https:\/\/essential.construction\/academy\/glossary\/change-order\/\">change orders<\/a><\/li>\n<li>Photos and backup for stored materials<\/li>\n<\/ul>\n<h2>How the draw process works<\/h2>\n<ol>\n<li>The contractor submits its monthly pay application to the owner.<\/li>\n<li>The owner assembles the draw request with soft costs and backup and sends it to the lender.<\/li>\n<li>The lender&#8217;s inspector (or a third-party construction consultant) visits the site to confirm percent complete.<\/li>\n<li>The lender or title company checks for new liens, often through a title update.<\/li>\n<li>The lender funds the approved amount, less any <a href=\"https:\/\/essential.construction\/academy\/glossary\/retainage\/\">retainage<\/a> the loan requires, to the borrower, directly to the contractor, or through a title or escrow company.<\/li>\n<\/ol>\n<h2>Draw request vs pay application<\/h2>\n<table>\n<thead>\n<tr>\n<th><\/th>\n<th>Draw request<\/th>\n<th>Pay application<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>From \/ to<\/td>\n<td>Borrower to lender<\/td>\n<td>Contractor to owner<\/td>\n<\/tr>\n<tr>\n<td>Covers<\/td>\n<td>All project costs funded by the loan, hard and soft<\/td>\n<td>The contractor&#8217;s work under its contract<\/td>\n<\/tr>\n<tr>\n<td>Checked by<\/td>\n<td>Lender&#8217;s inspector and title company<\/td>\n<td>Architect or owner&#8217;s rep<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>On small residential and renovation jobs, a homeowner&#8217;s lender may deal with the builder directly, and &#8220;draw&#8221; is often used loosely for any progress payment.<\/p>\n<h2>Tips for faster draws<\/h2>\n<ul>\n<li>Learn the lender&#8217;s draw schedule, cut-off dates and required forms at loan closing.<\/li>\n<li>Collect lien waivers before submitting; missing waivers are the most common hold-up.<\/li>\n<li>Keep the pay app percentages realistic. The inspector will check them in the field.<\/li>\n<li>Track contingency use and change orders against the loan budget every month.<\/li>\n<\/ul>\n<h2>Draw request templates<\/h2>\n<p>A consistent cover letter and billing package makes each draw easy for the lender to check, which is the quickest way to get funds released.<\/p>\n<ul>\n<li><a href=\"https:\/\/essential.construction\/files\/business-operations\/finance\/draw-request-cover-letter\/\">Draw Request Cover Letter<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/files\/business-operations\/finance\/contractor-application-for-progress-payment\/\">Contractor Application for Progress Payment<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/files\/business-operations\/finance\/construction-payment-schedule\/\">Construction Payment Schedule<\/a><\/li>\n<\/ul>\n<h2>Related terms<\/h2>\n<ul>\n<li><a href=\"https:\/\/essential.construction\/academy\/glossary\/pay-application\/\">Pay Application<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/academy\/glossary\/schedule-of-values\/\">Schedule of Values<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/academy\/glossary\/lien-waiver\/\">Lien Waiver<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/academy\/glossary\/progress-billing\/\">Progress Billing<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/academy\/glossary\/proforma\/\">Proforma<\/a><\/li>\n<\/ul>\n<h2>Frequently asked questions<\/h2>\n<h3>What is a draw request on a loan?<\/h3>\n<p>It is a borrower&#8217;s request for the lender to release part of a construction loan to pay for work completed. The lender checks the request against the budget, inspects the work and confirms no new liens before releasing the money.<\/p>\n<h3>How often can you submit a draw request?<\/h3>\n<p>Most commercial construction loans allow one draw per month, timed with the contractor&#8217;s monthly pay application. Some residential loans use a fixed draw schedule tied to milestones such as foundation, framing and drywall. The loan agreement sets the rules.<\/p>\n<h3>What is a draw inspection?<\/h3>\n<p>A draw inspection is a site visit by the lender&#8217;s inspector to confirm the work billed in a draw request is actually in place. The inspector&#8217;s report supports the lender&#8217;s decision to fund the draw in full or in part.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A draw request is a request to a construction lender to release (&#8220;draw&#8221;) part of a construction loan to pay for work completed to date.<\/p>\n","protected":false},"author":1,"featured_media":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"glossary-categories":[465],"glossary-tags":[],"class_list":["post-20473","glossary","type-glossary","status-publish","hentry","glossary-categories-division-01-general-requirements"],"_links":{"self":[{"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary\/20473","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary"}],"about":[{"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/types\/glossary"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/comments?post=20473"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary\/20473\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/media?parent=20473"}],"wp:term":[{"taxonomy":"glossary-categories","embeddable":true,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary-categories?post=20473"},{"taxonomy":"glossary-tags","embeddable":true,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary-tags?post=20473"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}