{"id":20494,"date":"2026-11-23T11:01:36","date_gmt":"2026-11-23T18:01:36","guid":{"rendered":"https:\/\/essential.construction\/academy\/glossary\/transmittal\/"},"modified":"2026-11-23T11:01:36","modified_gmt":"2026-11-23T18:01:36","slug":"transmittal","status":"publish","type":"glossary","link":"https:\/\/essential.construction\/academy\/glossary\/transmittal\/","title":{"rendered":"Transmittal"},"content":{"rendered":"<p>A <strong>transmittal<\/strong> in construction is a cover document that records what was sent, to whom, when, why and in what form: drawings, specifications, <a href=\"https:\/\/essential.construction\/academy\/glossary\/submittal\/\">submittals<\/a>, samples or reports. It travels with the documents and gives both sides a dated record of the exchange, which matters when deadlines or revisions are disputed later.<\/p>\n<p>It is also called a transmittal form, letter of transmittal or document transmittal.<\/p>\n<h2>What&#8217;s on a transmittal?<\/h2>\n<ul>\n<li>Transmittal number, date and project<\/li>\n<li>From and to (company, name, contact details) and copies to<\/li>\n<li>List of items sent: document or drawing numbers, titles, revision, date and number of copies<\/li>\n<li>Format: hard copy, electronic, physical sample<\/li>\n<li>Purpose: for approval, for review and comment, for information, for construction, for record, as requested<\/li>\n<li>Required action and response date<\/li>\n<li>Remarks and sender&#8217;s signature, with space for the recipient to acknowledge receipt<\/li>\n<\/ul>\n<h2>When transmittals are used<\/h2>\n<table>\n<thead>\n<tr>\n<th>Situation<\/th>\n<th>Typical purpose box<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Architect issues a new drawing revision to the contractor<\/td>\n<td>For construction<\/td>\n<\/tr>\n<tr>\n<td>Contractor sends <a href=\"https:\/\/essential.construction\/academy\/glossary\/shop-drawings\/\">shop drawings<\/a> or product data to the architect<\/td>\n<td>For approval<\/td>\n<\/tr>\n<tr>\n<td>Contractor delivers samples to the design team<\/td>\n<td>For review<\/td>\n<\/tr>\n<tr>\n<td>Bid documents or addenda sent to bidders<\/td>\n<td>For tender<\/td>\n<\/tr>\n<tr>\n<td>Closeout: <a href=\"https:\/\/essential.construction\/academy\/glossary\/as-built-drawings\/\">as-builts<\/a>, warranties and <a href=\"https:\/\/essential.construction\/academy\/glossary\/om-manual\/\">O&amp;M manuals<\/a> to the owner<\/td>\n<td>For record<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>Transmittal vs submittal<\/h2>\n<p>A submittal is the content: the shop drawing, data sheet or sample the contractor wants reviewed. A transmittal is the cover record of sending something, submittal or not. Submittals are usually sent under a transmittal or a submittal cover sheet that does the same job.<\/p>\n<table>\n<thead>\n<tr>\n<th><\/th>\n<th>Transmittal<\/th>\n<th>Submittal<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>What it is<\/td>\n<td>A cover record of documents sent<\/td>\n<td>The documents or samples being reviewed<\/td>\n<\/tr>\n<tr>\n<td>Who sends it<\/td>\n<td>Anyone on the project<\/td>\n<td>The contractor (prepared by subs and suppliers)<\/td>\n<\/tr>\n<tr>\n<td>Needs review?<\/td>\n<td>Only a receipt<\/td>\n<td>Yes, by the design team<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>Who prepares it<\/h2>\n<p>Document controllers, project coordinators and project engineers issue most transmittals, on both the design and contractor sides. Many teams now send transmittals through a project management platform, which logs them automatically, but the information is the same. Keep a transmittal log so you can show exactly which revision someone had on any date.<\/p>\n<h2>Tips<\/h2>\n<ul>\n<li>List every document with its revision. &#8220;Drawings attached&#8221; proves nothing later.<\/li>\n<li>Tick one clear purpose so the recipient knows what to do.<\/li>\n<li>Number transmittals in sequence and log them.<\/li>\n<li>Get acknowledgement of receipt for important issues, such as drawings for construction.<\/li>\n<li>When a new revision goes out, state which revision it supersedes.<\/li>\n<\/ul>\n<h2>Free and premium transmittal templates<\/h2>\n<p>A standard form takes a minute to fill in and gives you a clean paper trail for every document you send.<\/p>\n<ul>\n<li><a href=\"https:\/\/essential.construction\/files\/construction\/administration\/construction-transmittal\/\">Construction Transmittal Template<\/a> (free)<\/li>\n<li><a href=\"https:\/\/essential.construction\/files\/pre-construction\/estimating\/construction-tender-transmittal\/\">Construction Tender Transmittal<\/a> (free): for sending bid documents<\/li>\n<li><a href=\"https:\/\/essential.construction\/files\/construction\/document-transmital-form\/\">Document Transmittal Form<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/files\/design\/drawing-issue-register\/\">Drawing Issue Register<\/a>: log every drawing issue and revision<\/li>\n<\/ul>\n<h2>Related terms<\/h2>\n<ul>\n<li><a href=\"https:\/\/essential.construction\/academy\/glossary\/submittal\/\">Submittal<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/academy\/glossary\/shop-drawings\/\">Shop Drawings<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/academy\/tutorials\/ultimate-guide-to-the-construction-rfi\/\">Request for Information (RFI)<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/academy\/glossary\/cut-sheet\/\">Cut Sheet<\/a><\/li>\n<\/ul>\n<h2>Frequently asked questions<\/h2>\n<h3>What is a transmittal in construction?<\/h3>\n<p>It is a cover form or letter that goes with documents, drawings or samples sent between project parties. It lists exactly what was sent, the revision, the date, the recipient and the purpose, creating a record that the information was delivered.<\/p>\n<h3>What is a transmittal vs a submittal?<\/h3>\n<p>A submittal is something the contractor sends for the design team&#8217;s review, such as shop drawings or product data. A transmittal is the cover record of any document sent between parties. Submittals are usually sent under a transmittal, but many transmittals have nothing to do with submittals.<\/p>\n<h3>Is a transmittal letter a cover letter?<\/h3>\n<p>Yes, broadly. A transmittal letter is a type of cover letter that introduces and lists the documents being sent. In construction it is usually a standard form with tick boxes for the purpose and required action, rather than a written letter.<\/p>\n<h3>What is document transmittal?<\/h3>\n<p>Document transmittal is the controlled process of sending project documents and recording each issue, usually in a transmittal log or document management system, so the project team can prove who received which revision and when.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A transmittal in construction is a cover document that records what was sent, to whom, when, why and in what form: drawings, specifications, submittals, samples<\/p>\n","protected":false},"author":1,"featured_media":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"glossary-categories":[465],"glossary-tags":[],"class_list":["post-20494","glossary","type-glossary","status-publish","hentry","glossary-categories-division-01-general-requirements"],"_links":{"self":[{"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary\/20494","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary"}],"about":[{"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/types\/glossary"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/comments?post=20494"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary\/20494\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/media?parent=20494"}],"wp:term":[{"taxonomy":"glossary-categories","embeddable":true,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary-categories?post=20494"},{"taxonomy":"glossary-tags","embeddable":true,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary-tags?post=20494"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}