{"id":20658,"date":"2026-11-25T14:20:00","date_gmt":"2026-11-25T21:20:00","guid":{"rendered":"https:\/\/essential.construction\/academy\/?post_type=glossary&#038;p=20658"},"modified":"2026-11-25T14:20:00","modified_gmt":"2026-11-25T21:20:00","slug":"request-for-proposal","status":"publish","type":"glossary","link":"https:\/\/essential.construction\/academy\/glossary\/request-for-proposal\/","title":{"rendered":"Request for Proposal [RFP]"},"content":{"rendered":"<p>A <strong>request for proposal (RFP)<\/strong> in construction is a formal invitation from an owner asking contractors or consultants to submit a proposal for a project. Unlike a simple price request, an RFP asks for price plus approach, schedule, team, experience and other factors, and the owner picks the best overall value rather than just the lowest number.<\/p>\n<p>On site, &#8220;RFP&#8221; is sometimes also used for a <em>request for pricing<\/em>: a contractor&#8217;s request to a sub for the price of a change. This page covers the procurement meaning.<\/p>\n<h2>What goes in a construction RFP?<\/h2>\n<ul>\n<li>Project description, location and scope of work<\/li>\n<li>Drawings, specifications or a performance brief, depending on how far design has gone<\/li>\n<li>Contract type and key terms (for example lump sum, cost-plus or GMP)<\/li>\n<li>What the proposal must contain: price or fee, schedule, staffing, method, safety record, references<\/li>\n<li>Evaluation criteria and how they are weighted<\/li>\n<li>Submission deadline, format, question period and site visit details<\/li>\n<li>Bonding and insurance requirements<\/li>\n<\/ul>\n<p>For US federal work, FAR 15.203 says an RFP must at minimum describe the requirement, the expected terms and conditions, what the proposal must include, and the evaluation factors and their relative importance. Many private and municipal owners follow a similar structure.<\/p>\n<h2>RFP vs RFQ vs invitation to bid<\/h2>\n<table>\n<thead>\n<tr>\n<th><\/th>\n<th>Request for proposal (RFP)<\/th>\n<th><a href=\"https:\/\/essential.construction\/academy\/glossary\/request-for-quotation\/\">Request for quotation (RFQ)<\/a><\/th>\n<th>Invitation to bid (IFB\/ITB)<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Main question<\/td>\n<td>How would you do it, who, when and for how much?<\/td>\n<td>What is your price for this defined item?<\/td>\n<td>What is your price for these complete documents?<\/td>\n<\/tr>\n<tr>\n<td>Scope<\/td>\n<td>Can still be developing<\/td>\n<td>Clearly defined<\/td>\n<td>Fully designed<\/td>\n<\/tr>\n<tr>\n<td>Award basis<\/td>\n<td>Best value (price and non-price factors)<\/td>\n<td>Usually lowest acceptable price<\/td>\n<td>Lowest responsive, responsible bid<\/td>\n<\/tr>\n<tr>\n<td>Negotiation<\/td>\n<td>Usually allowed<\/td>\n<td>Sometimes<\/td>\n<td>Usually none<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>FAR 14.101 describes sealed bidding as evaluating bids without discussions and awarding on price and price-related factors only, which is the main contrast with a negotiated RFP.<\/p>\n<h2>How to respond to an RFP<\/h2>\n<ol>\n<li>Read the whole package and list every required item. Missing one can disqualify you.<\/li>\n<li>Send questions in writing before the question deadline and watch for addenda (see <a href=\"https:\/\/essential.construction\/academy\/tutorials\/construction-tendering-the-basics\/\">construction tendering basics<\/a>).<\/li>\n<li>Attend the site visit and confirm existing conditions.<\/li>\n<li>Build your price from a takeoff and sub quotes, and state assumptions, inclusions and exclusions clearly.<\/li>\n<li>Answer the evaluation criteria in the same order and headings the owner used.<\/li>\n<li>Check bonding, insurance and signatures, then submit on time in the required format.<\/li>\n<\/ol>\n<h2>RFP templates<\/h2>\n<ul>\n<li><a href=\"https:\/\/essential.construction\/files\/information\/e-books\/managing-the-request-for-proposal-process\/\">Managing the Request for Proposal Process<\/a> (e-book)<\/li>\n<li><a href=\"https:\/\/essential.construction\/files\/pre-construction\/estimating\/construction-bid-template\/\">Construction Bid Template<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/files\/pre-construction\/estimating\/estimate-assumptions-inclusions-and-exclusions\/\">Estimate Assumptions, Inclusions and Exclusions<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/files\/pre-construction\/estimating\/request-for-pricing-rfp\/\">Request for Pricing (RFP)<\/a>: for pricing changes with subs<\/li>\n<\/ul>\n<h2>Related terms<\/h2>\n<ul>\n<li><a href=\"https:\/\/essential.construction\/academy\/glossary\/request-for-quotation\/\">Request for Quotation (RFQ)<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/academy\/glossary\/scope-of-work\/\">Scope of Work<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/academy\/glossary\/bid-bond\/\">Bid Bond<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/academy\/glossary\/notice-to-proceed\/\">Notice to Proceed<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/academy\/glossary\/cost-plus-contract\/\">Cost-Plus Contract<\/a><\/li>\n<\/ul>\n<h2>Frequently asked questions<\/h2>\n<h3>What does RFP mean in construction?<\/h3>\n<p>Usually request for proposal: an owner&#8217;s invitation for contractors to propose price, approach, schedule and team for a project. On some jobs it also means request for pricing, a request to price a change.<\/p>\n<h3>What is the difference between an RFP and a bid?<\/h3>\n<p>A bid answers an invitation to bid with a price for fully defined work, and award usually goes to the lowest responsive bidder. A proposal answers an RFP and is judged on price and other factors such as experience, schedule and method.<\/p>\n<h3>Who issues an RFP?<\/h3>\n<p>Owners and developers, public agencies, and sometimes construction managers or general contractors procuring design-build partners, consultants or major trade packages.<\/p>\n<h3>How long should an RFP response period be?<\/h3>\n<p>Long enough to get sub quotes and a site visit done. The owner sets it in the RFP; complex projects need more time than small, well-defined scopes.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A request for proposal (RFP) in construction is a formal invitation from an owner asking contractors or consultants to submit a proposal for a project.<\/p>\n","protected":false},"author":1,"featured_media":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"glossary-categories":[465],"glossary-tags":[],"class_list":["post-20658","glossary","type-glossary","status-publish","hentry","glossary-categories-division-01-general-requirements"],"_links":{"self":[{"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary\/20658","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary"}],"about":[{"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/types\/glossary"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/comments?post=20658"}],"version-history":[{"count":1,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary\/20658\/revisions"}],"predecessor-version":[{"id":20663,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary\/20658\/revisions\/20663"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/media?parent=20658"}],"wp:term":[{"taxonomy":"glossary-categories","embeddable":true,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary-categories?post=20658"},{"taxonomy":"glossary-tags","embeddable":true,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary-tags?post=20658"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}