{"id":20659,"date":"2026-11-25T14:20:02","date_gmt":"2026-11-25T21:20:02","guid":{"rendered":"https:\/\/essential.construction\/academy\/?post_type=glossary&#038;p=20659"},"modified":"2026-11-25T14:20:02","modified_gmt":"2026-11-25T21:20:02","slug":"request-for-quotation","status":"publish","type":"glossary","link":"https:\/\/essential.construction\/academy\/glossary\/request-for-quotation\/","title":{"rendered":"Request for Quotation [RFQ]"},"content":{"rendered":"<p>A <strong>request for quotation (RFQ)<\/strong> is a document asking suppliers or subcontractors for a price on a clearly defined item or scope: a material, a piece of equipment, a rental or a trade package. Each response is a quotation. RFQs are used when the requirement is known and price, lead time and terms are the main things being compared.<\/p>\n<p>It is also called a request for quote or request for pricing. In some public procurement, &#8220;RFQ&#8221; can mean request for qualifications, which asks for experience rather than prices.<\/p>\n<h2>What&#8217;s on an RFQ?<\/h2>\n<ul>\n<li>Project name, location and RFQ number<\/li>\n<li>Item or scope description, with spec sections, drawing references and quantities<\/li>\n<li>Required delivery date or work window<\/li>\n<li>Delivery terms, such as delivered to site or picked up, and who unloads<\/li>\n<li>What to include in the price (freight, taxes, submittals, warranty)<\/li>\n<li>Quote due date and how long the quote must stay valid<\/li>\n<li>Contact for questions and how to submit<\/li>\n<\/ul>\n<h2>How the RFQ process works<\/h2>\n<ol>\n<li>Define the scope and quantities, usually from a <a href=\"https:\/\/essential.construction\/academy\/glossary\/quantity-takeoff\/\">quantity takeoff<\/a>.<\/li>\n<li>Send the same RFQ to at least two or three suppliers or subs so the quotes compare like for like.<\/li>\n<li>Level the quotes: line them up in a comparison sheet and adjust for exclusions, freight and lead time.<\/li>\n<li>Clarify gaps, then award with a purchase order or subcontract.<\/li>\n<\/ol>\n<h2>RFQ vs RFP vs RFI<\/h2>\n<table>\n<thead>\n<tr>\n<th>Document<\/th>\n<th>Asks for<\/th>\n<th>Typical use<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>RFQ<\/td>\n<td>A price for a defined item or scope<\/td>\n<td>Materials, equipment, rentals, small trade packages<\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/essential.construction\/academy\/glossary\/request-for-proposal\/\">RFP<\/a><\/td>\n<td>Price plus approach, team, schedule and experience<\/td>\n<td>Whole projects, design-build, consultants<\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/essential.construction\/academy\/tutorials\/ultimate-guide-to-the-construction-rfi\/\">RFI<\/a><\/td>\n<td>Information or clarification, not a price<\/td>\n<td>Questions about drawings and specs<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>Is a quotation binding?<\/h2>\n<p>It depends on the wording and your jurisdiction. In US federal purchasing, FAR 13.004 states that a quotation is not an offer, so the government&#8217;s order is the offer and the contract forms when the supplier accepts it. In private work, a quote with firm terms may be treated as an offer. Either way, put the award in writing with a purchase order or subcontract that refers to the quote.<\/p>\n<h2>Tips<\/h2>\n<ul>\n<li>Ask every supplier to price the same quantities and spec, or the comparison is meaningless.<\/li>\n<li>Always ask for exclusions in writing. Freight, fuel surcharges and taxes are common gaps.<\/li>\n<li>Set a validity period (for example 30 or 60 days) when prices are volatile.<\/li>\n<li>Record lead times. The cheapest quote can cost more if it delays the schedule.<\/li>\n<\/ul>\n<h2>RFQ templates<\/h2>\n<ul>\n<li><a href=\"https:\/\/essential.construction\/files\/pre-construction\/estimating\/request-for-quotation-rfq\/\">Request for Quotation (RFQ)<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/files\/pre-construction\/estimating\/construction-quotation-template\/\">Construction Quotation Template<\/a>: for subs and suppliers sending a quote<\/li>\n<li><a href=\"https:\/\/essential.construction\/files\/pre-construction\/estimating\/construction-pricing-comparison\/\">Construction Pricing Comparison<\/a>: level quotes side by side<\/li>\n<li><a href=\"https:\/\/essential.construction\/files\/business-operations\/finance\/purchase-order-price-comparison\/\">Purchase Order Price Comparison<\/a><\/li>\n<\/ul>\n<h2>Related terms<\/h2>\n<ul>\n<li><a href=\"https:\/\/essential.construction\/academy\/glossary\/request-for-proposal\/\">Request for Proposal (RFP)<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/academy\/glossary\/quantity-takeoff\/\">Quantity Takeoff<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/academy\/glossary\/scope-of-work\/\">Scope of Work<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/academy\/glossary\/submittal\/\">Submittal<\/a><\/li>\n<\/ul>\n<h2>Frequently asked questions<\/h2>\n<h3>What is an RFQ in construction?<\/h3>\n<p>It is a request sent to suppliers or subcontractors for a price on a defined item or scope, such as rebar, a crane rental or a small trade package. The responses are compared on price, lead time and terms.<\/p>\n<h3>What is the difference between an RFQ and an RFP?<\/h3>\n<p>An RFQ asks only for a price on something already defined. An RFP asks for a proposal that also covers method, team, schedule and experience, and is judged on overall value.<\/p>\n<h3>How many quotes should you get?<\/h3>\n<p>There is no universal number. Get enough to compare fairly; your company&#8217;s procurement policy or the owner&#8217;s contract may set a minimum, especially on public work.<\/p>\n<h3>How long is a construction quote valid?<\/h3>\n<p>As long as the quote says. If it gives no validity date, ask for one in writing before you rely on the price in your bid.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A request for quotation (RFQ) is a document asking suppliers or subcontractors for a price on a clearly defined item or scope: a material, a<\/p>\n","protected":false},"author":1,"featured_media":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"glossary-categories":[465],"glossary-tags":[],"class_list":["post-20659","glossary","type-glossary","status-publish","hentry","glossary-categories-division-01-general-requirements"],"_links":{"self":[{"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary\/20659","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary"}],"about":[{"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/types\/glossary"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/comments?post=20659"}],"version-history":[{"count":1,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary\/20659\/revisions"}],"predecessor-version":[{"id":20664,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary\/20659\/revisions\/20664"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/media?parent=20659"}],"wp:term":[{"taxonomy":"glossary-categories","embeddable":true,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary-categories?post=20659"},{"taxonomy":"glossary-tags","embeddable":true,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary-tags?post=20659"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}