{"id":20660,"date":"2026-11-25T14:20:04","date_gmt":"2026-11-25T21:20:04","guid":{"rendered":"https:\/\/essential.construction\/academy\/?post_type=glossary&#038;p=20660"},"modified":"2026-11-26T07:17:38","modified_gmt":"2026-11-26T14:17:38","slug":"quantity-takeoff","status":"publish","type":"glossary","link":"https:\/\/essential.construction\/academy\/glossary\/quantity-takeoff\/","title":{"rendered":"Quantity Takeoff"},"content":{"rendered":"<p>A <strong>quantity takeoff<\/strong> (also called a material takeoff or QTO) is the process of measuring and counting every item of work from the drawings and specifications, such as cubic yards of concrete, tons of rebar, square feet of drywall and the number of doors. The quantities become the base of the cost estimate, purchase orders and supplier quotes.<\/p>\n<p>The takeoff answers &#8220;how much?&#8221; The estimate then answers &#8220;how much will it cost?&#8221; by applying material prices, labor rates, equipment and markups to those quantities.<\/p>\n<h2>How to do a quantity takeoff<\/h2>\n<ol>\n<li><strong>Collect the current documents.<\/strong> Drawings, specifications and all addenda. Note the revision of every sheet you measure.<\/li>\n<li><strong>Set up your breakdown.<\/strong> Organize items by trade or by CSI MasterFormat division so they line up with sub quotes and the cost report.<\/li>\n<li><strong>Measure and count.<\/strong> Work sheet by sheet and mark up what you&#8217;ve taken off so nothing is counted twice or missed.<\/li>\n<li><strong>Convert to buying units.<\/strong> For example, cubic feet of concrete to cubic yards (27 cubic feet = 1 cubic yard), or square feet of wall to sheets of drywall.<\/li>\n<li><strong>Add waste and laps.<\/strong> Allow for cutting, overlaps and breakage. The right allowance depends on the material, layout and crew, so use your own job history where you have it.<\/li>\n<li><strong>Check it.<\/strong> Have someone else review the biggest-value items and compare totals against similar past jobs.<\/li>\n<\/ol>\n<h2>Common takeoff units<\/h2>\n<table>\n<thead>\n<tr>\n<th>Item<\/th>\n<th>Measured in<\/th>\n<th>Usually bought in<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Concrete<\/td>\n<td>Length \u00d7 width \u00d7 depth (cu ft)<\/td>\n<td>Cubic yards (US) or cubic metres<\/td>\n<\/tr>\n<tr>\n<td><a href=\"https:\/\/essential.construction\/academy\/glossary\/rebar\/\">Rebar<\/a><\/td>\n<td>Linear feet by bar size<\/td>\n<td>Pounds or tons, from a bar bending schedule<\/td>\n<\/tr>\n<tr>\n<td>Drywall<\/td>\n<td>Square feet of wall and ceiling<\/td>\n<td>Sheets (e.g. 4 \u00d7 8 or 4 \u00d7 12 ft)<\/td>\n<\/tr>\n<tr>\n<td>Framing, trim, pipe<\/td>\n<td>Linear feet<\/td>\n<td>Pieces or lengths<\/td>\n<\/tr>\n<tr>\n<td>Doors, fixtures, outlets<\/td>\n<td>Count (each)<\/td>\n<td>Each<\/td>\n<\/tr>\n<tr>\n<td>Excavation and fill<\/td>\n<td>Cubic yards in place<\/td>\n<td>Truckloads or cubic yards, adjusted for swell and compaction<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>Manual vs digital takeoff<\/h2>\n<p>Manual takeoff uses paper drawings, a scale ruler and a spreadsheet. Digital takeoff software measures directly on PDF drawings or a BIM model, which is faster and leaves a visual record of what was measured. Either way, the accuracy depends on reading the drawings and specs correctly. Software can&#8217;t tell you that a spec section calls for a thicker slab than the drawing shows.<\/p>\n<h2>Takeoff vs estimate<\/h2>\n<table>\n<thead>\n<tr>\n<th><\/th>\n<th>Quantity takeoff<\/th>\n<th>Cost estimate<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Output<\/td>\n<td>Quantities and units<\/td>\n<td>Dollars<\/td>\n<\/tr>\n<tr>\n<td>Inputs<\/td>\n<td>Drawings and specs<\/td>\n<td>Takeoff, prices, labor rates, overhead, profit, <a href=\"https:\/\/essential.construction\/academy\/glossary\/contingency\/\">contingency<\/a><\/td>\n<\/tr>\n<tr>\n<td>Used for<\/td>\n<td>Pricing, RFQs, purchasing, progress tracking<\/td>\n<td>Bids, budgets, cost control<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>Tips<\/h2>\n<ul>\n<li>Keep the takeoff and the pricing in separate columns so quantities can be checked on their own.<\/li>\n<li>Write down assumptions (thickness, spacing, heights) next to each line.<\/li>\n<li>Re-check quantities when an addendum or revision comes in, and log what changed.<\/li>\n<li>Send suppliers your quantities with the <a href=\"https:\/\/essential.construction\/academy\/glossary\/request-for-quotation\/\">RFQ<\/a> so every quote prices the same thing.<\/li>\n<\/ul>\n<h2>Takeoff and estimating templates<\/h2>\n<ul>\n<li><a href=\"https:\/\/essential.construction\/files\/pre-construction\/estimating\/quantity-takeoff-template\/\">Quantity Takeoff Template<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/files\/design\/bar-bending-schedules\/\">Bar Bending Schedules<\/a>: rebar takeoff by bar mark<\/li>\n<li><a href=\"https:\/\/essential.construction\/files\/pre-construction\/estimating\/estimate-with-cost-and-sort-codes\/\">Estimate with Cost and Sort Codes<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/files\/information\/guides\/masterformat-specifications\/\">MasterFormat Specifications<\/a>: organize your takeoff by division<\/li>\n<\/ul>\n<h2>Related terms<\/h2>\n<ul>\n<li><a href=\"https:\/\/essential.construction\/academy\/glossary\/request-for-quotation\/\">Request for Quotation (RFQ)<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/academy\/glossary\/scope-of-work\/\">Scope of Work<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/academy\/glossary\/schedule-of-values\/\">Schedule of Values<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/academy\/glossary\/value-engineering\/\">Value Engineering<\/a><\/li>\n<\/ul>\n<h2>Frequently asked questions<\/h2>\n<h3>What is a quantity takeoff in construction?<\/h3>\n<p>It is measuring and counting all the materials and work items shown in the drawings and specs, in units such as cubic yards, square feet, linear feet and each. Estimators price those quantities to build the bid.<\/p>\n<h3>Is a takeoff the same as an estimate?<\/h3>\n<p>No. The takeoff lists quantities only. The estimate applies costs for materials, labor, equipment, overhead and profit to those quantities.<\/p>\n<h3>What is a material takeoff?<\/h3>\n<p>Another name for a quantity takeoff, often used when the focus is the list of materials to buy rather than labor items.<\/p>\n<h3>Who does the quantity takeoff?<\/h3>\n<p>Estimators, quantity surveyors or project engineers at the general contractor, and each subcontractor&#8217;s estimator for their own trade. Owners sometimes hire independent cost consultants to check them.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A quantity takeoff (also called a material takeoff or QTO) is the process of measuring and counting every item of work from the drawings and<\/p>\n","protected":false},"author":1,"featured_media":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"glossary-categories":[465],"glossary-tags":[],"class_list":["post-20660","glossary","type-glossary","status-publish","hentry","glossary-categories-division-01-general-requirements"],"_links":{"self":[{"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary\/20660","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary"}],"about":[{"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/types\/glossary"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/comments?post=20660"}],"version-history":[{"count":1,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary\/20660\/revisions"}],"predecessor-version":[{"id":20665,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary\/20660\/revisions\/20665"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/media?parent=20660"}],"wp:term":[{"taxonomy":"glossary-categories","embeddable":true,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary-categories?post=20660"},{"taxonomy":"glossary-tags","embeddable":true,"href":"https:\/\/essential.construction\/academy\/wp-json\/wp\/v2\/glossary-tags?post=20660"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}