# Construction Submittal Schedule Template

> Construction submittal schedule template in Excel to track every submittal due for review and approval. $4.99, or free with a 14-day membership trial.

- URL: https://essential.construction/files/construction/administration/construction-submittal-schedule-template/
- Publisher: Essential Construction (https://essential.construction/)
- Last updated: 2026-11-02
- Price: $4.99 USD (also included with Essential Construction membership)
- Categories: Administration
- Division: 01 - General
- File Type: Spreadsheet

---

This template can be used to monitor and manage all the submittals that requires certain action such as approval.

This submittal schedule template is a spreadsheet for planning, monitoring and managing every construction submittal that needs action, such as review and approval. Use it to see what is due, what is with the designer and what is holding up procurement, all in one place.

## What is a submittal schedule?

A submittal schedule is a list of every submittal required by the contract documents, such as shop drawings, product data, samples and mockups, with the dates each one must be submitted, reviewed and returned. It is built from the specifications and tied to the construction schedule, so long-lead items are approved in time to be ordered, fabricated and delivered before the work needs them. The general contractor usually prepares it and shares it with the design team and trades.

## When to use it

- At project startup, when the contract requires a submittal schedule from the contractor
- When buying out subcontracts, to set each trade's submittal dates
- To track long-lead items such as steel, curtainwall, elevators and switchgear
- At weekly coordination and owner-architect-contractor meetings
- When reviewers are slow, to show which approvals are on the critical path

## What's included

The download is an editable spreadsheet (.xlsx) for monitoring and managing all submittals that require action, such as approval. Set it up with the specification sections and items for your project, then use it to track each submittal from first issue to final approval.

## How to fill it out

1. Go through the specifications section by section and list every required submittal.
2. Give each submittal a number and note the spec section, description and responsible subcontractor or supplier.
3. Work back from the construction schedule: when must the material be on site, and how long is fabrication and delivery?
4. Set the required submission date, allowing for the review period in the contract and at least one resubmission.
5. Record the dates each submittal is sent, returned and its review status, such as approved, approved as noted, or revise and resubmit.
6. Review the schedule weekly and chase anything overdue.

## Tips

- Agree the schedule with the design team early, so reviewers can plan their workload.
- Flag long-lead and critical-path submittals so they stand out.
- Do not release material for fabrication until the submittal is approved.
- Keep the schedule and the submittal log in step. Many teams use one spreadsheet for both.

## Related templates and guides

- [Submittal Form Template](https://essential.construction/files/construction/administration/submittal-form-template/)
- [Submittal Cover Sheet](https://essential.construction/files/construction/administration/submittal-cover-sheet/)
- [Construction Submittal Workflow Template](https://essential.construction/files/construction/administration/construction-submittal-workflow-template/)
- [Construction Transmittal Template](https://essential.construction/files/construction/administration/construction-transmittal/)
- [Construction Submittals: Types, Process, Log and Examples](https://essential.construction/academy/tutorials/managing-construction-submittals/)

## Frequently asked questions

### What is a submittal schedule in construction?

It is the contractor's plan for when each required submittal will be sent for review and when approval is needed. It lists every shop drawing, product data sheet, sample and mockup from the specifications, with dates tied to the construction schedule so materials are approved and ordered in time.

### What is the difference between a submittal schedule and a submittal log?

The schedule is forward-looking: it plans when submittals are due. The log records what actually happened: dates sent and returned, reviewer and status. On many projects, one spreadsheet does both, with planned dates next to actual dates.

### What types of submittals are tracked?

Common types are shop drawings, product data, samples, mockups, test reports, certificates, warranties and closeout documents such as operation and maintenance manuals. The specifications list what is required for each section.

### Who prepares the submittal schedule?

Usually the general contractor's project manager or project coordinator prepares it, using dates from subcontractors and suppliers. It is then shared with the architect and engineers so they can plan their reviews.

### How long does submittal review take?

It depends on the contract and the item. Contracts often set a review period, commonly a couple of weeks, but complex submittals and resubmissions take longer. Build the contract period and at least one resubmission into your dates.