# Material Approval Request

> Material approval request form to submit products for owner or consultant review before use on site. Editable – $4.99, or free with a 14-day trial.

- URL: https://essential.construction/files/construction/administration/material-approval-request/
- Publisher: Essential Construction (https://essential.construction/)
- Last updated: 2026-11-02
- Price: $4.99 USD (also included with Essential Construction membership)
- Categories: Administration, Quality
- File Type: Document

---

This template is used to submit materials for site use and for the approval of the owner or consultant.

This material approval request form is used to submit materials proposed for use on site to the owner or consultant for approval. Use it before you order or install a product, so the design team can confirm it meets the specification and you have their decision in writing.

## What is a material approval request?

A material approval request (MAR) is a formal submittal from the contractor asking the consultant, engineer or owner to approve a specific material, product or supplier before it is used in the work. It identifies the material, where it will be used and which specification it relates to, and it is usually sent with supporting documents such as data sheets, samples or certificates. The reviewer returns it approved, approved with comments or rejected.

## When to use it

- Before ordering a specified material, so the exact product is approved first.
- When proposing an alternative or equal product to the one named in the specification.
- When a supplier or manufacturer changes partway through the project.
- When the contract requires approval of materials before delivery to site.
- When resubmitting a material that was rejected or approved with comments.

## What's included

This is an editable document template for submitting materials for site use to the owner or consultant for approval. It can be used for any trade or division of work, from sitework and concrete through to finishes, mechanical and electrical. You can add your project details, company information and the approval steps your contract requires.

## How to fill it out

1. Give the request a number and enter the project name, date and who it is sent to.
2. Describe the material clearly: product name, manufacturer, model or grade and supplier.
3. Reference the specification section and the drawings or locations where it will be used.
4. State whether it is the specified product or a proposed alternative, and why.
5. List the attachments, such as technical data sheets, samples, test reports or certificates.
6. Send it for review and record the date you need a decision.
7. When it comes back, file the decision and share it with the site team and supplier before ordering.

## Tips

- Submit early. Long lead items need approval well before the order date.
- Highlight any differences from the specification instead of hoping they are not noticed.
- Keep approved samples on site so delivered materials can be checked against them.

## Related templates and guides

- [Material Approval Form - Template](https://essential.construction/files/construction/quality/material-approval-form-template/) to collect sign-off from each party.
- [Material Approval Form - Register](https://essential.construction/files/construction/quality/material-approval-form-register/) to track every material submission.
- [Submittal Cover Sheet](https://essential.construction/files/construction/administration/submittal-cover-sheet/) for other submittals such as shop drawings.
- [Construction Submittals: Types, Process, Log and Examples](https://essential.construction/academy/tutorials/managing-construction-submittals/)

## Frequently asked questions

### What is MAR in construction?

MAR stands for material approval request. It is the document a contractor uses to ask the consultant or owner to approve a material before it is used on the project. On other projects the same document may be called a material submittal or product submittal.

### What are material submittals?

Material submittals are documents and samples a contractor provides to show that a proposed material meets the contract requirements. They often include product data sheets, manufacturer details, samples, test results and certificates. The design team reviews them before the material is ordered or installed.

### What documents should be attached to a material approval request?

Attach anything the reviewer needs to make a decision: technical data sheets, manufacturer catalogs, samples, test reports, certificates, compliance statements and a comparison with the specification if you are proposing an alternative. Check the specification section, as it often lists the exact documents required.

### What happens if a material is rejected?

The reviewer returns the request with reasons. The contractor then proposes a different material or provides more information and resubmits. Do not order or install the material until it is approved, as rejected materials may have to be removed at the contractor's cost.