# Site Instruction Form

> Site instruction form to issue and record jobsite directions: serial number, date, task, work area, drawings and attachments. $5, or free with a 14-day trial.

- URL: https://essential.construction/files/construction/administration/site-instruction-form/
- Publisher: Essential Construction (https://essential.construction/)
- Last updated: 2026-11-02
- Price: $5 USD (also included with Essential Construction membership)
- Categories: Administration
- Division: 01 - General
- File Type: Spreadsheet
- Language: English

---

Streamline your project with this site instruction form.

This site instruction form gives you a formal way to issue and record instructions on a construction project. Directions on site change quickly, and a written site instruction makes sure each task is clear, traceable and tied to the right drawings and specifications.

## What is a site instruction?

A site instruction, or SI, is a written direction issued on a construction project, usually by the architect, engineer, contract administrator or contractor's site manager, telling the receiving party to carry out, change or stop a piece of work. It records what must be done, where, and with reference to which drawings or specifications. Each SI is numbered and dated so it can be tracked. If the instruction changes the scope, cost or time, it normally leads to a variation or change order.

## When to use it

- Clarifying how work should be done when drawings or specifications are unclear
- Directing a subcontractor to fix defective or non-conforming work
- Confirming a verbal instruction given on site in writing
- Instructing minor changes to location, sequence or method
- Stopping or holding work in a specific area

## What's included

This site instruction form is a spreadsheet (.xlsx). It includes:

- A formal instruction format that clarifies tasks and supports accountability
- Fields for the specifics of the task, the related work areas and the applicable drawings or specifications
- Options for attachments, so you can add supporting information
- Serial numbers and dates for tracking and referencing each instruction

## How to fill it out

1. Give the instruction the next serial number and enter the date.
2. Name the issuer and the party receiving the instruction.
3. Describe the task clearly: what to do, where and by when.
4. Reference the related work area and the drawings or specifications that apply.
5. Attach sketches, photos or marked-up drawings if they help.
6. State whether the instruction is expected to affect cost or time.
7. Have it signed by the issuer and acknowledged by the recipient, then log and file it.

## Common mistakes to avoid

- Giving instructions only verbally. Confirm them in writing the same day.
- Using vague wording such as 'fix as required'. Say exactly what needs to be done.
- Skipping the drawing or specification reference.
- Letting instructions that change scope proceed without a variation or change order.

## Related templates and guides

- [Site Instruction Template](https://essential.construction/files/construction/administration/site-instruction-template/)
- [Confirmation of Verbal Instruction (CVI)](https://essential.construction/files/construction/administration/confirmation-of-verbal-instruction-cvi/)
- [Site Instruction Cover Template](https://essential.construction/files/design/site-instruction-cover-template/)
- [Site Instruction [SI] (glossary)](https://essential.construction/academy/glossary/site-instruction/)
- [Change Order [CO] (glossary)](https://essential.construction/academy/glossary/change-order/)

## Frequently asked questions

### What is the difference between a site instruction and a change order?

A site instruction directs work to be done or changed on site. A change order, or variation, formally changes the contract scope, price or time. An SI with no cost or time impact may stand alone, but if it changes the contract it usually needs a change order to follow.

### Who can issue a site instruction?

It depends on the contract. Typically the architect, engineer or contract administrator issues instructions to the contractor, and the contractor's site manager issues them to subcontractors. Check your contract to see who has authority to instruct changes.

### What is a site instruction book?

A site instruction book is a bound pad of numbered, often carbon-copy forms kept on site, so instructions can be written and copied on the spot. This form does the same job as a spreadsheet you can fill in, number and file electronically.

### Should verbal instructions be confirmed in writing?

Yes. Verbal instructions are easy to forget or dispute. Confirm them with a written site instruction or a confirmation of verbal instruction as soon as possible, ideally the same day, so there is a clear record of what was asked.

### How should site instructions be tracked?

Give every instruction a unique serial number and date, and keep a log of all instructions with their status. Record which instructions led to variations or change orders, so nothing is missed when the final account is agreed.