# QAQC Checklist – Block (Masonry) Walls

> Masonry inspection checklist for block walls with 10+ checks before and after installation. Excel spreadsheet. $4.99, or free with a 14-day trial.

- URL: https://essential.construction/files/construction/quality/qaqc-checklist-block-masonry-walls/
- Publisher: Essential Construction (https://essential.construction/)
- Last updated: 2026-11-03
- Price: $4.99 USD (also included with Essential Construction membership)
- Categories: Quality
- Division: 01 - General, 04 - Masonry
- File Type: Spreadsheet
- Language: English

---

Use this block wall quality control checklist to check for items both before and after installation.

This masonry inspection checklist helps you control the quality of block wall installation from start to finish. Use it to check items both before and after block (masonry) partitions are built, so the same standard is applied across every floor and every crew on the jobsite.

## What is a masonry inspection checklist?

A masonry inspection checklist is a quality control form used to inspect blockwork or brickwork. Before work starts, it confirms that materials, layout and preparation are right. After the walls are built, it confirms the finished work matches the drawings and specifications. Each item is marked as acceptable or not, and defects are recorded for correction. A standard checklist keeps inspections consistent and makes sure corners are not cut.

## When to use it

- Before blockwork starts in a new area, to confirm setting out and materials
- During the first lifts, to catch alignment and joint problems early
- After walls are complete, before services, plaster or finishes cover them
- When a new masonry crew or subcontractor starts on site
- As part of your inspection and test plan for masonry work

## What's included

The download is an Excel spreadsheet (.xlsx) quality control checklist for block (masonry) wall installation. It includes more than 10 items to check, split between checks made before installation and checks made after the block partitions are installed. You can standardize it and roll it out across your project so every inspector checks the same items.

## How to fill it out

1. Enter the project, building, floor, area and wall references being inspected.
2. Before work starts, check the approved drawings, setting out, block type and mortar materials.
3. Confirm the base is clean and level and that any starter bars, ties or anchors are in place.
4. After installation, check line, level and plumb, joint thickness and filling, and bond pattern.
5. Check openings, lintels, movement joints and the connection to the structure above.
6. Mark each item as acceptable or not and record the corrective action and who is responsible.
7. Re-inspect corrected items and sign off before the walls are covered.

## Tips

- Inspect the first few courses closely. Errors in setting out are expensive to fix later.
- Check materials on delivery. Damaged or wrong blocks should not reach the wall.
- Take photos of walls before they are covered and attach them to the checklist.
- Coordinate with MEP trades so openings and sleeves are built in, not cut in later.

## Related templates and guides

- [Quality Assurance Checklist – Masonry Works](https://essential.construction/files/construction/quality/quality-assurance-checklist-masonry-works/)
- [Masonry Coursing Tables, Shapes and Sizes](https://essential.construction/files/information/guides/masonry-coursing-tables-shapes-and-sizes/)
- [Hot and Cold Weather Masonry Construction](https://essential.construction/files/information/white-papers/hot-and-cold-weather-masonry-construction/)
- [QAQC Checklist – Drywall Partitions](https://essential.construction/files/construction/quality/qaqc-checklist-drywall-partitions/)
- [Mortar – glossary definition](https://essential.construction/academy/glossary/mortar/)

## Frequently asked questions

### What should a masonry inspection checklist include?

Typical items include approved drawings and materials, setting out, base preparation, mortar mix, bond pattern, joint thickness and filling, line, level and plumb, wall ties and reinforcement where required, lintels and openings, movement joints, cleaning, and protection of the finished work.

### What should be checked before blockwork starts?

Confirm you are working to the latest approved drawings, the wall positions are set out correctly, the base is clean and level, the right blocks and mortar materials are on site, and any starter bars, ties or anchors are installed. Fixing these first prevents rework later.

### What are common blockwork defects?

Common defects include walls out of plumb or line, uneven or unfilled joints, broken or chipped blocks, missing ties, poorly built openings, mortar smears on faces, and walls built tight to the slab above where a movement gap was required.

### Can this checklist be used for brickwork?

It is written for block (masonry) walls, but many checks, such as line, level, plumb, joints and openings, also apply to brickwork. Review the items against your brickwork specification and add any checks for facing brick appearance and cleaning.