# QAQC Checklist – Door Frame Installation

> Use this door frame installation quality control checklist to check for items both before and after the work.

- URL: https://essential.construction/files/construction/quality/qaqc-checklist-door-frame-installation/
- Publisher: Essential Construction (https://essential.construction/)
- Last updated: 2026-11-03
- Price: $4.99 USD (also included with Essential Construction membership)
- Categories: Quality
- Division: 01 - General, 08 - Doors And Windows, 09 - Finishes
- File Type: Spreadsheet
- Language: English

---

Use this door frame installation quality control checklist to check for items both before and after the work.

This quality control checklist for door frame installation helps your team check the right items both before and after door frames go in. A standard checklist for this scope of work can be rolled out across your project, so every installer and inspector checks the same things and corners are not cut.

## What is a door frame installation checklist?

A door frame installation checklist is a quality assurance and quality control (QA/QC) form used to inspect door frames before and after they are installed. Before installation, it confirms the opening, wall type and delivered frames match the drawings and door schedule. After installation, it confirms the frames are set plumb, level and square, properly anchored and protected. Signing off frames before walls are finished and doors are hung prevents costly rework later.

## When to use it

- Before frames are set, to check openings, rough bucks and wall framing
- When frames are delivered, to check sizes, handing and fire labels against the door schedule
- After installation and before drywall or masonry is completed around the frame
- Before doors and hardware are hung
- During quality walks, mockup reviews and pre-handover inspections

## What's included

The checklist is a spreadsheet for quality control of door frame installation. It features over 10 different items to check, covering inspection both before and after the door frames are installed.

## How to fill it out

1. Enter the project, area or level, door numbers from the door schedule, date and inspector.
2. Before installation, work through the pre-installation items and note any opening or wall issues for correction.
3. Confirm the delivered frames match the door schedule for size, type, handing and any fire rating.
4. After installation, work through the post-installation items, checking each frame for plumb, level, square and secure anchoring.
5. Mark each item as pass or fail and record a clear note for every failed item.
6. Have the installer correct defects, then re-inspect and record the close-out.
7. Sign the checklist and file it with the project quality records.

## Common mistakes to avoid

- Inspecting only after walls are closed in, when frame problems are expensive to fix.
- Skipping the check of fire-rated frame labels against the door schedule.
- Leaving frames unprotected while other trades work nearby.
- Not checking frames against hardware locations before doors are ordered or hung.

## Related templates and guides

- [QAQC Checklist – Door Installation](https://essential.construction/files/construction/quality/qaqc-checklist-door-installation/)
- [QAQC Checklist – Wood Doors](https://essential.construction/files/construction/quality/qaqc-checklist-wood-doors/)
- [QAQC Checklist – Drywall Partitions](https://essential.construction/files/construction/quality/qaqc-checklist-drywall-partitions/)
- [Controlling Quality on the Construction Site](https://essential.construction/academy/tutorials/controlling-quality-on-the-jobsite/)
- [Quality templates](https://essential.construction/files/construction/quality/)

## Frequently asked questions

### What should be checked before installing a door frame?

Check that the rough opening or rough buck is the right size and location, the wall type and thickness match the frame, the floor is at the correct level, and the delivered frame matches the door schedule for size, type, handing and any fire rating. Fix problems before the frame is set.

### What should be checked after a door frame is installed?

Check that the frame is plumb, level and square, properly anchored to the wall, at the right height relative to the finished floor, undamaged and protected from other trades. For hollow metal frames, also check any specified grouting and that hardware preparations are in the right place.

### What are the main types of door frames?

Common types on commercial and residential projects include hollow metal (steel) frames, wood frames, and aluminum frames. Steel frames may be welded or knock-down types. The door schedule and specifications set which type is used at each opening and whether it must be fire rated.

### Why use a QA/QC checklist for door frames?

A checklist makes every inspection consistent, creates a record that the work was checked, and catches problems before finishes and doors are installed. It also gives installers a clear standard to work to, which reduces rework and disputes at handover.