# QAQC Checklist – Wood Doors

> Wood door inspection checklist with 10+ QA/QC checks before and after installation. Excel spreadsheet for site teams. $4.99, or free with a 14-day trial.

- URL: https://essential.construction/files/construction/quality/qaqc-checklist-wood-doors/
- Publisher: Essential Construction (https://essential.construction/)
- Last updated: 2026-11-03
- Price: $4.99 USD (also included with Essential Construction membership)
- Categories: Quality
- Division: 01 - General, 06 - Wood And Plastic
- File Type: Spreadsheet
- Language: English

---

Use this wood door quality control checklist to check for items both before and after installation.

This wood door inspection checklist helps you control quality on every wood door your team installs. Use it to check items before the doors go in and again once they are hung, so damage, poor fit and missing hardware are caught before handover.

## What is a door inspection checklist?

A door inspection checklist is a quality control form used to confirm that doors are supplied and installed to the drawings, door schedule and specifications. For wood doors, it covers the condition of the door leaf as delivered, storage and handling, and the finished installation. Each item is marked acceptable or not, and any defects are recorded for correction. It is different from a periodic fire door inspection, which checks doors that are already in service.

## When to use it

- When wood doors are delivered, before they are accepted on site
- Before installation starts in each area, to confirm frames and openings are ready
- After doors are hung and hardware is fitted
- During punch list walks before handover
- When a new door installer or finish carpentry crew starts

## What's included

The download is an Excel spreadsheet (.xlsx) quality control checklist for wood door installation. It includes more than 10 items to check, covering both pre-installation and post-installation checks. A predefined list like this can be standardized across your project so every supervisor checks the same items.

## How to fill it out

1. Enter the project, floor, room and door number from the door schedule.
2. On delivery, check door type, size, core, veneer or finish, and any fire label against the schedule.
3. Inspect each leaf for warping, dents, scratches, delamination and unsealed edges.
4. Before hanging, confirm the frame is plumb, square and secure and the opening is clean.
5. After hanging, check gaps and clearances, swing, latching and that the door closes without binding.
6. Check hardware is complete, fixed and working, and the finish is undamaged.
7. Record defects and the responsible party, then re-inspect and sign off.

## Common mistakes to avoid

- Storing wood doors where they can get wet or are exposed to large swings in humidity.
- Cutting or planing a door edge without resealing it as the manufacturer requires.
- Hanging doors before wet trades and painting are finished nearby.
- Signing off doors without operating them through a full swing.

## Related templates and guides

- [QAQC Checklist – Door Installation](https://essential.construction/files/construction/quality/qaqc-checklist-door-installation/) – general door hanging and hardware checks.
- [QAQC Checklist – Door Frame Installation](https://essential.construction/files/construction/quality/qaqc-checklist-door-frame-installation/) – check frames before doors are hung.
- [Wood Door Productivity Monitoring Form](https://essential.construction/files/construction/scheduling/wood-door-productivity-monitoring-form/)
- [Deficiency Log Template](https://essential.construction/files/construction/quality/deficiency-log-template/) – track door defects to close-out.
- [Controlling Quality on the Construction Site](https://essential.construction/academy/tutorials/controlling-quality-on-the-jobsite/)

## Frequently asked questions

### Is this a fire door inspection checklist?

No. This is a construction quality control checklist for installing wood doors. Fire-rated door assemblies in service usually need periodic inspection to the fire code that applies in your area, using a dedicated fire door inspection form. You can still use this checklist to confirm labeled doors are installed as specified.

### What should you check when wood doors are delivered?

Check each door against the door schedule for type, size, handing, core, finish and any label. Look for warping, dents, scratches, veneer damage and unsealed edges. Record damage on the delivery ticket and reject or tag doors that do not meet the specification.

### What are common wood door installation defects?

Typical defects include uneven gaps around the leaf, doors that bind or will not latch, warped leaves, damaged veneer or finish, missing or loose hardware, and edges that were trimmed and not resealed.

### Who should complete the door inspection checklist?

Usually the finish carpentry or door installation foreman checks the work first, then the general contractor's superintendent or QA/QC inspector verifies and signs off. On some projects the architect or owner's representative also reviews door installation during punch list walks.