# Lifting Permit

> Crane lifting permit template that gathers all lift details for approval before lifting operations start. Editable - $4.99, or free with a 14-day trial.

- URL: https://essential.construction/files/construction/safety/lifting-permit/
- Publisher: Essential Construction (https://essential.construction/)
- Last updated: 2026-11-03
- Price: $4.99 USD (also included with Essential Construction membership)
- Categories: Safety
- File Type: Document

---

The lifting permit template is used to gather all information necessary prior to the start of lifting operations.

This lifting permit template is a permit to work for crane lifts on your jobsite. Before any lift, the people organizing it fill it in and submit it for approval, so the right checks are in place and only qualified people carry out the work.

## What is a lifting permit?

A lifting permit is a permit to work that must be completed and approved before a crane lift starts. It gathers the key information about the lift in one place: what is being lifted, where, with which equipment and by whom. It also confirms that the lift has been planned, the crane and rigging are suitable and the area is controlled. The permit gives the site supervisor a clear point to stop and check before a high-risk activity goes ahead.

## When to use it

- Before any crane lift on site, if your safety plan requires a permit
- Lifting heavy or unusual loads such as steel, precast or plant
- Lifts close to people, live roads, power lines or occupied buildings
- Tandem lifts or lifts involving more than one crane
- When a new crane, operator or rigging crew starts on the project

## What's included

The permit is a Word document (.docx) that you can edit to match your site rules. It is set up to gather all of the information needed before lifting operations with a crane start, and to record that the lift has been submitted and approved before work begins.

## How to fill it out

1. Describe the lift: the load, its weight, the pick-up and set-down locations and the date and time.
2. Record the crane and lifting gear to be used, and check they are suitable and inspected.
3. Name the crane operator, signaler or banksman and riggers, and confirm they are qualified.
4. Attach or reference the lift plan, including radius, capacity and ground conditions.
5. List the controls, such as exclusion zones, barriers, weather limits and communication method.
6. Submit the permit to the approving supervisor and do not start the lift until it is signed.
7. Close the permit when the lift is complete and file it with your site safety records.

## Tips

- Hold a short pre-lift briefing with everyone involved, using the permit as the checklist.
- Set clear wind speed limits and stop work if they are exceeded.
- Never let a permit be signed by the same person who will carry out the lift without review.
- Keep completed permits. They are useful evidence in audits and investigations.

## Related templates and guides

- [Critical Lift Permit](https://essential.construction/files/construction/safety/work-permits/critical-lift-permit/)
- [Work Permit – Permit To Lift](https://essential.construction/files/construction/quality/work-permit-permit-to-lift/)
- [Lifting Gear Construction Checklist](https://essential.construction/files/construction/safety/inspections/lifting-gear-construction-checklist/)
- [Daily Safety Inspection – Crane](https://essential.construction/files/construction/safety/inspections/daily-safety-inspection-crane/)
- [How To Plan Your Next Construction Crane Lift](https://essential.construction/academy/tutorials/how-to-plan-your-next-construction-crane-lift/)

## Frequently asked questions

### What is the difference between a lift plan and a lifting permit?

A lift plan is the technical plan for the lift: crane position, radius, load weight, rigging and capacity. A lifting permit is the approval step that confirms the plan exists, the people and equipment are ready and the area is controlled before the lift starts.

### Who approves a lifting permit?

Usually a site supervisor, lifting supervisor or appointed person who is competent in crane operations. The approver should not simply sign. They should check the lift plan, the equipment and the controls before authorizing the work.

### What is a critical lift?

A critical lift is a lift with higher risk, for example a load close to the crane's rated capacity, a tandem lift, a lift over occupied areas or a lift of personnel. Each company or site sets its own criteria, and critical lifts usually need a more detailed plan and permit.

### How long is a lifting permit valid?

A lifting permit is usually issued for a specific lift or a single shift. If the load, crane, location or conditions change, a new permit should be raised. Follow the validity period in your site safety plan.

### When must lifting equipment be inspected?

Cranes and lifting gear should be checked by a competent person before use, and also have periodic thorough inspections at the intervals set by local regulations and the manufacturer. Record the inspections and do not use equipment that has failed a check.