# Scheduling

> Construction schedule templates: Gantt charts, three and six week look-aheads, pull planning boards, milestone and procurement schedules, and delay notices.

- URL: https://essential.construction/files/construction/scheduling/
- Publisher: Essential Construction (https://essential.construction/)
- Products in this category: 76

---

Construction schedule templates for planning and tracking work at every level, from the master schedule to next week’s tasks. Find Gantt charts, three and six week look-ahead schedules, lean pull planning templates, milestone and procurement schedules, and sample house schedules. Made for schedulers, project managers, superintendents and foremen who need a clear, shareable plan.

## What's in scheduling

Construction schedules work at different levels of detail. The templates cover each one:

- **Master and milestone schedules**: Gantt charts, milestone schedules and sample single and two storey house schedules.
- **Look-ahead schedules**: three week, six week and weekly look-ahead planners for the field team.
- **Lean planning**: pull planning templates for working back from a milestone with trade partners.
- **Procurement and tracking**: procurement schedules, progress tracking and delay notice letters.

Schedulers and project managers own the master schedule. Superintendents and foremen run the look-aheads and pull plans, and the delay notice letter helps document time impacts as they happen.

## Popular construction schedule templates

- [Lean Construction Pull Planning Template](https://essential.construction/files/construction/scheduling/lean-construction-pull-planning-template/): plan backward from a milestone with the trades.
- [Six Week Look Ahead Schedule Template](https://essential.construction/files/construction/scheduling/six-week-look-ahead-schedule-template/): a rolling short-term plan for the field.
- [Weekly Lookahead Planner](https://essential.construction/files/construction/scheduling/weekly-lookahead-planner/): assign this week's tasks by crew.
- [Construction Project Gantt Chart](https://essential.construction/files/construction/scheduling/project-gantt-chart/): a bar chart of activities and durations.
- [Construction Milestone Schedule Template](https://essential.construction/files/construction/scheduling/construction-milestone-schedule-template/): key dates for owners and executives.
- [Construction Procurement Schedule - Detailed](https://essential.construction/files/construction/scheduling/construction-procurement-schedule-detailed/): track submittals, orders and deliveries.
- [Construction Schedule - Two Storey House (Microsoft Project)](https://essential.construction/files/construction/scheduling/construction-schedule-two-storey-house-microsoft-project/): a sample residential schedule.
- [Construction Delay Notice Letter](https://essential.construction/files/construction/scheduling/construction-delay-notice-letter/): give written notice of a delay.

## Related categories and guides

Start the baseline in [Project Planning](https://essential.construction/files/pre-construction/project-planning/), and track progress with [Reporting](https://essential.construction/files/business-operations/reporting/) templates and [Administration](https://essential.construction/files/construction/administration/) logs.

From the Academy: [Fundamentals Of Construction Scheduling](https://essential.construction/academy/tutorials/fundamentals-of-construction-scheduling/), [Lean Construction – Pull Planning Explained](https://essential.construction/academy/tutorials/lean-construction-pull-planning-explained/) and the glossary entry for [Critical Path](https://essential.construction/academy/glossary/critical-path/).

## Frequently asked questions

### What is a pull planning template?

Pull planning is a lean technique where the team starts from a milestone and works backward, with each trade stating what it needs from the trade before it. A pull planning template gives the session a structure for tasks, handoffs, durations and commitments.

### What is the difference between a master schedule and a look-ahead?

The master schedule covers the whole project and is used to track the critical path and key dates. A look-ahead covers the next few weeks in more detail so the field team can line up crews, materials and inspections.

### Which software do I need for these schedules?

It depends on the template. Some are named for the software they use, such as the Microsoft Project house schedules, while others are spreadsheets or printable sheets. Check the format listed on each product page.

### How often should a construction schedule be updated?

Update look-ahead schedules every week. Master schedules are usually updated at a regular interval, such as monthly, or whatever the contract requires, and whenever a significant delay or change occurs.

## Templates and files in this category

- [Lean Construction Pull Planning Template](https://essential.construction/files/construction/scheduling/lean-construction-pull-planning-template.md?v=1793667261): Excel pull planning template for lean construction: schedule activities collaboratively with your trades. $6.99, or free with a 14-day membership trial.
- [Construction Delay Notice Letter](https://essential.construction/files/construction/scheduling/construction-delay-notice-letter.md?v=1793716389): Submit your construction delay with this letter template and be comfortable knowing that you have satisfied legal requirements of your contract.
- [Six Week Look Ahead Schedule Template](https://essential.construction/files/construction/scheduling/six-week-look-ahead-schedule-template.md?v=1793716368): Excel six week look ahead schedule for foreman meetings and short-term construction planning with your crews. $4.99, or free with a 14-day membership trial.
- [Construction Daily Report Template](https://essential.construction/files/construction/quality/construction-daily-report-template.md?v=1793667170): Excel construction daily report template for supervisors to log crews, work completed, equipment and site events. $4.99, or free with a 14-day trial.
- [Construction Procurement Schedule – Detailed](https://essential.construction/files/construction/scheduling/construction-procurement-schedule-detailed.md?v=1793716476): Detailed Excel procurement schedule tracking award, submittals, approvals and lead times for every package. $6.99, or free with a 14-day membership trial.
- [Project Weekly Report Template](https://essential.construction/files/construction/quality/project-weekly-report-template.md?v=1793667441): This construction weekly report template helps you record what happened on your jobsite each week and share it with the project team in a consistent format. Weekly reports sound like a hassle, but they become…
- [Construction Startup Checklist](https://essential.construction/files/construction/administration/construction-startup-checklist.md?v=1793716364): Get your construction project organized early by following a startup checklist.
- [Foreman Daily Log Template](https://essential.construction/files/construction/quality/foreman-daily-log-template.md?v=1793716791): Use this excel template on your construction site to allow foreman and supervisors to record their daily activities and record of the site.
- [Gantt Chart Report](https://essential.construction/files/construction/scheduling/gantt-chart-report.md?v=1678312006): Sometimes it’s useful to include additional information alongside a schedule or present it in a report format. This construction Gantt chart scheduling report will help you: Prepare your schedule using automated calculations in spreadsheet format…
- [Construction Permit Tracking Log](https://essential.construction/files/construction/quality/construction-permit-tracking-log.md?v=1678005631): A permit tracking log is intended to manage and track all permits on your construction project. Download our template today to make your life easier.
- [General Construction Schedule (With S-Curve)](https://essential.construction/files/construction/scheduling/general-construction-schedule-with-s-curve.md?v=1793716676): Download this editable Excel Program for General Construction Schedule
- [Construction Schedule – Single Storey House (Microsoft Project)](https://essential.construction/files/construction/scheduling/construction-schedule-single-storey-house-microsoft-project.md?v=1708571527): Save time with this ready made single storey house construction project schedule for use with Microsoft Project.
- [Construction Schedule – Two Storey House (Microsoft Project)](https://essential.construction/files/construction/scheduling/construction-schedule-two-storey-house-microsoft-project.md?v=1684186296): Save time with this ready made two storey house construction project schedule for use with Microsoft Project.
- [Construction Milestone Schedule Template](https://essential.construction/files/construction/scheduling/construction-milestone-schedule-template.md?v=1737064921): A construction milestone schedule will allow you to communicate more effectivey on a project and reinforce important dates to external stakeholders.
- [Construction Project Gantt Chart](https://essential.construction/files/construction/scheduling/project-gantt-chart.md?v=1793716784): Use this template to quickly generate simply Gantt charts for your project.
- [Weekly Lookahead Planner](https://essential.construction/files/construction/scheduling/weekly-lookahead-planner.md?v=1793667325): Look ahead planner for 2-week and 6-week construction schedules: key tasks, who is responsible and resources needed. $6.99, or free with a 14-day trial.
- [Construction Procurement Schedule](https://essential.construction/files/construction/scheduling/construction-procurement-schedule.md?v=1793667335): Excel procurement schedule to track award, submittal review and material lead times so items arrive on site on time. $4.99, or free with a 14-day trial.
- [Manpower Planner Template](https://essential.construction/files/construction/scheduling/manpower-planner-template.md?v=1793716529): Weekly manpower schedule template for construction: list tasks, supervisors and crews and map site manpower needs. $4.99, or free with a 14-day trial.
- [Simple Gantt Chart Template](https://essential.construction/files/construction/scheduling/simple-gantt-chart-template.md?v=1648576275): A gantt chart is used to establish a timeline of work and activities on a construction project.
- [Site Daily Report](https://essential.construction/files/construction/quality/site-daily-report.md?v=1618620553): This daily report can be used by superintendents or anyone in supervision roles. It’s intent is to provide a format that allows people to log the daily activities that have occurred on the construction site.…
- [Construction Schedule – Mid Rise Residential Building](https://essential.construction/files/construction/scheduling/construction-schedule-mid-rise-residential-building.md?v=1688962431): Save time with this ready made mid-rise residential tower construction project schedule for use with Microsoft Project.
- [Construction Pre-Board Checklist](https://essential.construction/files/construction/quality/construction-pre-board-checklist.md?v=1794246531): Avoid costly re-work by utilizing a pre-board checklist to ensure all of the services and work required is completed prior to installing drywall.
- [Project Schedule Excel Template](https://essential.construction/files/construction/scheduling/project-schedule-excel-template.md?v=1793667216): Excel construction schedule template to plan tasks and timelines and give trades clear windows to work on site. $4.99, or free with a 14-day trial.
- [Construction Productivity Tracker](https://essential.construction/files/construction/scheduling/construction-productivity-tracker.md?v=1608005211): Track the productivity of your workers on your construction site with this Excel Spreadsheet template.
- [Daily Asphalt Report Template](https://essential.construction/files/construction/quality/daily-asphalt-report-template.md?v=1618014057): This document is intended for use on civil projects. It will help you to track your daily asphalt production and understand the mixes that were installed each day.
- [Productivity Estimation Sheet](https://essential.construction/files/construction/scheduling/productivity-estimation-sheet.md?v=1717256210): Use this sheet to track the productivity of various activities on your project and forecast their cost to complete.
- [Construction Procurement Tracker](https://essential.construction/files/construction/scheduling/construction-procurement-tracker.md?v=1793716658): Construction procurement log in Excel: track each material from submittal to release for order and jobsite delivery. $4.99, or free with a 14-day trial.
- [Project Task Manager](https://essential.construction/files/construction/administration/project-task-manager.md?v=1647683970): Organize your project more effectively with this task manager.
- [Construction Gantt Chart](https://essential.construction/files/construction/scheduling/construction-gantt-chart.md?v=1770882915): Organize your jobsite more effectively with a Gantt chart.
- [Weekly Accomplishment Monitoring](https://essential.construction/files/construction/scheduling/weekly-accomplishment-monitoring.md?v=1622218003): This template will help you track the weekly accomplishments of your construction project in terms of quantity and percentage.
- [Weekly Status Report Template](https://essential.construction/files/construction/quality/weekly-status-report-template.md?v=1612724781): Keep your project team up to date Reinforce key deliverables each week Protect yourself by providing regular notifications of upcoming work
- [CONTRACTOR WEEKLY PLANNER Excel Template](https://essential.construction/files/pre-construction/project-planning/contractor-weekly-planner-excel-template.md?v=1793715229): Highly customizable contractor schedule planner, made in Excel, which will help you organize your jobs, projects, and your work activities in general.
- [Notice Letter for Additional Works](https://essential.construction/files/construction/administration/notice-letter-for-additional-works.md?v=1629741975): This letter template provides you with a ready made notice to communicate delays as a result of changes in the scope of work.
- [S-curve and Bar Chart](https://essential.construction/files/construction/scheduling/s-curve-and-bar-chart.md?v=1793715144): Download this editable Excel Program of S-curve and Bar Chart
- [Weather Tracking Log Template](https://essential.construction/files/construction/scheduling/weather-tracking-log-template.md?v=1793716624): Construction weather chart and daily weather log in Excel: record morning and afternoon weather, impact Y/N and why. $4.99, or free with a 14-day trial.
- [Staff Histogram and Manpower Loading Chart](https://essential.construction/files/construction/scheduling/staff-histogram-and-manpower-loading-chart.md?v=1793716643): Use this staff histogram / manpower loading chart on your project in order to better understand your planned vs actual staffing needs.
- [Manpower Monitoring](https://essential.construction/files/construction/scheduling/manpower-monitoring.md?v=1634519314): It is essential to monitor the number of your implemented workforce on your construction project every single day. As the strategic direction, workforce supply, and workaround demand change over time, strategies need to be updated accordingly, and this staffing monitoring form will be useful for that.
- [Gannt Chart Work Schedule](https://essential.construction/files/construction/scheduling/gannt-chart-work-schedule.md?v=1673292047): Plan your project and track progress with this gantt chart excel schedule.
- [Asphalt Completion Schedule](https://essential.construction/files/construction/scheduling/asphalt-completion-schedule.md?v=1617936010): When you’re working on a paving job it’s important to know when you will be finished. This schedule will help you to identify production and anticipated end dates for the work.
- [Water Pipe Installation Productivity Monitoring Form](https://essential.construction/files/construction/scheduling/water-pipe-installation-productivity-monitoring-form.md?v=1623633309): The Water Pipe Installation Productivity Monitoring Form has been designed to standardize the monitoring of productivity for water pipe installation.
- [Contractors Daily Progress Report](https://essential.construction/files/construction/quality/contractors-daily-progress-report.md?v=1712157901): This template is used to monitor and document the daily accomplishments of the contractor.
- [Residential Project Schedule Template](https://essential.construction/files/construction/scheduling/residential-project-schedule-template.md?v=1654641189): Use this schedule template to manage your residential project.
- [Traffic Interruption Report](https://essential.construction/files/construction/scheduling/traffic-interruption-report.md?v=1618637597): Construction projects come with a lot of vehicular traffic. Whether it be deliveries or daily equipment on the project site. Managing the traffic impacts can help keep the surrounding neighbourhoods in order. This traffic interruption…
- [Daily Work Log](https://essential.construction/files/business-operations/reporting/daily-work-log.md?v=1654707443): Keep track of each of the activities on your site with this Microsoft Excel Daily work log.
- [Painting Productivity Monitoring Form](https://essential.construction/files/construction/scheduling/painting-productivity-monitoring-form.md?v=1623634069): The Painting Productivity Monitoring Form has been designed to standardize the monitoring of productivity for painting work.
- [Subcontractors Manpower Tracking Log](https://essential.construction/files/construction/scheduling/subcontractors-manpower-tracking-log.md?v=1618690204): The jobsite is a busy place, with many companies operating with different people. Keeping track of all of those people can be tough. To make life easier consider using a subcontractor manpower tracking log. This…
- [Letter for Delayed or Defective Material or Equipment](https://essential.construction/files/construction/quality/letter-for-delayed-or-defective-material-or-equipment.md?v=1629741353): This letter can be used to identify delays due to material, either as a result of lateness or incorrectness. It can be customized to provide all of the relevant information for your project.
- [Schedule With Critical Path](https://essential.construction/files/construction/scheduling/schedule-with-critical-path.md?v=1618701809): Maintaining an accurate schedule is an important part of any construction project. This spreadsheet will provide you with the ability to prepare a schedule for your project. It features dates and duration fields as well…
- [Ductwork Installation Productivity Monitoring Form](https://essential.construction/files/construction/scheduling/ductwork-installation-productivity-monitoring-form.md?v=1623634717): The Ductwork Installation Productivity Monitoring Form has been designed to standardize the monitoring of productivity for air-con ducting installation.
- [Schedule Reliability Analysis](https://essential.construction/files/construction/scheduling/schedule-reliability-analysis.md?v=1621047320): Identify how much risk is involved with your current project schedule.
- [Weekly Progress Report – Bridge And Approach Slab](https://essential.construction/files/business-operations/reporting/weekly-progress-report-bridge-and-approach-slab.md?v=1631616228): Track the progress of your project by computing the percentage standing, useful for computing the percentage of accomplishment that can be used for billing purposes.
- [Floor Tiling Productivity Monitoring Form](https://essential.construction/files/construction/scheduling/floor-tiling-productivity-monitoring-form.md?v=1623634334): The Floor Tiling Productivity Monitoring Form has been designed to standardize the monitoring of productivity for floor tiling.
- [Weekly Progress Report – Commercial and Residential](https://essential.construction/files/business-operations/reporting/weekly-progress-report-commercial-and-residential.md?v=1631616150): Track the progress of your project by computing the percentage standing, useful for computing the percentage of accomplishment that can be used for billing purposes.
- [Project Milestone Schedule Template](https://essential.construction/files/construction/scheduling/project-milestone-schedule-template.md?v=1655224745): Use this document to provide a high level schedule summary to project stakeholders.
- [Three Week Look Ahead Schedule Template](https://essential.construction/files/construction/scheduling/three-week-look-ahead-schedule-template.md?v=1793667574): Free 3 week look ahead construction schedule in Excel: activity and trade columns, easy dates, conditional formatting, extends to 6 weeks. Email to get it.
- [Schedule of Works for a Building](https://essential.construction/files/construction/scheduling/schedule-of-works-for-a-building.md?v=1717668710): A complete Microsoft Project schedule for a building
- [Reinforcement Steel Placing Productivity Monitoring Form](https://essential.construction/files/construction/scheduling/reinforcement-steel-placing-productivity-monitoring-form.md?v=1623633930): The Reinforcement Placing and Fixing Productivity Monitoring Form has been designed to standardize the monitoring of productivity for reinforcement placing and fixing.
- [Suspended Ceiling Installation Productivity Monitoring Form](https://essential.construction/files/construction/scheduling/suspended-ceiling-installation-productivity-monitoring-form.md?v=1623633765): The Suspended Ceiling Installation Productivity Monitoring Form has been designed to standardize the monitoring of productivity for suspended ceiling installation.
- [Mockup Schedule](https://essential.construction/files/construction/scheduling/mockup-schedule.md?v=1618701615): Plan the mockups on your project.
- [Weekly Implementation Schedule](https://essential.construction/files/construction/scheduling/weekly-implementation-schedule.md?v=1622218285): This template will help you compare the actual accomplishment versus the target accomplishment for each week.
- [Wood Door Productivity Monitoring Form](https://essential.construction/files/construction/scheduling/wood-door-productivity-monitoring-form.md?v=1623633535): The Timber Door Productivity Monitoring Form has been designed to standardize the monitoring of productivity for timber door.
- [Construction Project Planner](https://essential.construction/files/pre-construction/project-planning/construction-project-planner.md?v=1728236399): Use this construction project planner to better and more efficiently organize your jobsite, all on one page.
- [Concrete Pouring Permit](https://essential.construction/files/construction/quality/concrete-pouring-permit.md?v=1793716667): This concrete pouring permit can be used to ensure that all concreting works are done in accordance with the approved plans and specification.
- [Wall Tiling Productivity Monitoring Form](https://essential.construction/files/construction/scheduling/wall-tiling-productivity-monitoring-form.md?v=1623633564): The Wall Tiling Productivity Monitoring Form has been designed to standardize the monitoring of productivity for wall tiling.
- [Mockup Schedule Template](https://essential.construction/files/construction/scheduling/mockup-schedule-template.md?v=1676014100): Create a mockup schedule today for your construction project using this easy to use template.
- [Concrete Placement Productivity Monitoring  Form](https://essential.construction/files/construction/scheduling/concrete-placement-productivity-monitoring-form.md?v=1623634555): The Concrete Placement Productivity Monitoring Form has been designed to standardize the monitoring of productivity for concrete placement.
- [Notice Letter for Slow Progress Construction](https://essential.construction/files/construction/scheduling/notice-letter-for-slow-progress-construction.md?v=1793716385): Give warning to the subcontractor or contractors who are not following the given schedule and has slow accomplishment progress.
- [Site Activities Tracking Log](https://essential.construction/files/construction/scheduling/site-activities-tracking-log.md?v=1639548380): Develop a jobsite daily activities tracking log with this spreadsheet to understand key details of the radios on site.
- [Road & Drainage Weekly Report and Computation of Accomplishment (In terms of Percentage)](https://essential.construction/files/construction/scheduling/weekly-report-and-computation-of-accomplishment-in-terms-of-percentage.md?v=1633240919): Track the progress of your project by computing the percentage standing, useful for computing the percentage of accomplishment that can be used for billing purposes.
- [Drywall Install Productivity Monitoring Form](https://essential.construction/files/construction/scheduling/drywall-install-productivity-monitoring-form.md?v=1623633207): The Drywall Installation Productivity Monitoring Form has been designed to standardize the monitoring of productivity for drywall installation.
- [P.E.R.T. Schedule Analysis](https://essential.construction/files/construction/scheduling/p-e-r-t-schedule-analysis.md?v=1711551087): Use this helpful spreadsheet to analyze the critical path according to the PERT method.
- [Stop Work Notice – Quality](https://essential.construction/files/construction/quality/stop-work-notice-quality.md?v=1688060312): Provide formal instruction to workers and teams on site to stop work.
- [Horizontal Formwork Productivity Monitoring Form](https://essential.construction/files/construction/scheduling/horizontal-formwork-productivity-monitoring-form.md?v=1623634187): The Formwork Installation Productivity Monitoring Form has been designed to standardize the monitoring of productivity for formwork installation.
- [Monte Carlo – schedule analysis](https://essential.construction/files/construction/scheduling/monte-carlo-schedule-analysis.md?v=1715336453): Use this Monte Carlo Schedule Analysis to determine where there are issues with your project schedule.
- [Project Schedule Work Breakdown](https://essential.construction/files/construction/scheduling/project-schedule-work-breakdown.md?v=1721308705): Use this Microsoft project schedule template with work breakdown to simplify and speed up your schedule creation.
- [Water Shutoff Request Letter](https://essential.construction/files/construction/logistics/water-shutoff-request-letter.md?v=1793716485): Water shutoff request letter template to formally ask the municipality or utility for a water shut down for pipe tie-ins. $4.99, or free with a 14-day trial.