# Turn Over Letters And Certificate of Completion

> Two ready-to-use project turnover letter samples plus a certificate of completion for client handover. Editable – $4.99, or free with a 14-day trial.

- URL: https://essential.construction/files/construction/turn-over-letters-and-certificate-of-completion/
- Publisher: Essential Construction (https://essential.construction/)
- Last updated: 2026-11-02
- Price: $4.99 USD (also included with Essential Construction membership)
- Categories: Construction, Administration
- Division: 01 - General
- File Type: Document
- Language: English

---

Make sure you close out your projects effectively with your client using this template turn over letters and certificate.

This turn over letter template pack helps you formally hand a finished construction project over to your client. It includes two versions of a turnover letter and a certificate of completion, ready to edit for your next project closeout.

## What is a turnover letter in construction?

A turnover letter is a formal letter from the contractor to the client that records the handover of a completed project, or part of it, from construction to occupancy and use. It confirms what is being handed over and when, and it serves as an agreement between the client and the contractor that the transfer has taken place. It is usually issued with the turnover documents, such as keys, manuals and warranties, and a certificate of completion.

## When to use it

- At the end of a project, when the building or space is handed to the owner.
- When an area or phase is turned over early so the client can move in.
- When handing over turnover documents such as manuals, warranties, as-builts and keys.
- When you need a dated record of when responsibility for the site passed to the client.

## What's included

- Two versions of a turnover letter, so you can choose the wording that suits your project.
- One certificate of completion to confirm the work is complete.
- An editable .docx document in English.

## How to fill it out

1. Choose the letter version that best fits your handover.
2. Add your company details, the client's name and address, and the project name and location.
3. State exactly what is being turned over: the whole project, a floor, a building or a system.
4. List the turnover documents and items included with the letter, such as keys, manuals and warranties.
5. Note the handover date and any outstanding items, with the agreed date to complete them.
6. Complete the certificate of completion with the project details and completion date.
7. Have both parties sign and date the letter and certificate, then keep copies in your closeout files.

## Tips

- Walk the site with the client before you send the letter, so there are no surprises.
- Attach a list of the turnover documents rather than describing them in the body of the letter.
- Record meter readings and key counts on the day of handover.

## Related templates and guides

- [Simple Certificate of Completion Template](https://essential.construction/files/construction/quality/simple-certificate-of-completion-template/) if you only need the certificate.
- [Deficiency Log Template](https://essential.construction/files/construction/quality/deficiency-log-template/) to track items still open at handover.
- [Final Payment Certificate](https://essential.construction/files/business-operations/finance/final-payment-certificate/) for the last payment after turnover.
- [Construction Project Closeout guide](https://essential.construction/academy/tutorials/construction-project-closeout-everyones-favourite-part-of-the-project/)

## Frequently asked questions

### What is a turnover document in construction?

Turnover documents are the records a contractor hands to the owner at the end of a project. They commonly include operation and maintenance manuals, warranties, as-built drawings, test and inspection reports, keys and spare materials. A turnover letter lists what is being handed over and confirms the date of transfer.

### What should a turnover letter include?

Include the project name and location, the parties, the area or scope being turned over, the handover date, a list of documents and items provided, any outstanding work with completion dates, and signatures from the contractor and client. Keep the wording clear and match it to your contract.

### Is it turnover or turn over?

Both are used. "Turnover" as one word is the usual form for the noun, as in a turnover letter or turnover documents. "Turn over" as two words is the verb, as in "we will turn over the building on Friday." Many people search for both, and either is understood on site.

### What is a certificate of turnover and acceptance?

A certificate of turnover and acceptance is a signed document confirming the contractor has handed over the work and the owner accepts it. It works alongside a turnover letter and certificate of completion, and it gives both parties a dated record of when the client took responsibility for the completed work.