# How to safely remove  asbestos

> This Code of Practice on how to safely remove asbestos is an approved code of practice under section 274 of the Work Health and Safety Act (the WHS Act).

- URL: https://essential.construction/files/information/guides/safe-work-method-statement-information-sheet-copy/
- Publisher: Essential Construction (https://essential.construction/)
- Last updated: 2021-07-31
- Price: Free download
- Categories: Safety, Guides
- Division: 01 - General, 02 - Siteworks, 03 - Concrete, 04 - Masonry
- File Type: Document
- Region: Oceanic

---

This Code of Practice on how to safely remove asbestos is an approved code of practice under section 274 of the Work Health and Safety Act (the WHS Act).

There are a number of duty holders who have a role in managing risks associated with removal of asbestos and ACM at the workplace. These include:
 − persons conducting a business or undertaking (PCBU)
 − designers, manufacturers, importers, suppliers and installers of plant, substances or
 structures, and
 − officers.

Workers and other persons at the workplace also have duties under the WHS Act, such as the duty to take reasonable care for their own health and safety at the workplace. A person can have more than one duty and more than one person can have the same duty at the same time.

Early consultation and identification of risks can allow for more options to eliminate or minimise risks and reduce the associated costs.