QAQC Checklist – Demolition Work (Flooring Removals)

$4.99

Use this flooring demolition quality control checklist to check for items both before and after installation.

LOVE THIS ITEM?

Download For Free

Subscribe now and download this item for free! You'll also unlock unlimited access to thousands of other construction documents, templates and tutorials.

Start Your 14-Day Free Trial

By downloading this product you are agreeing to our terms and conditions.
Contributor - Files

You will receive your documents and files immediately after you complete the checkout process. You will receive a link on the checkout page as well as via email.

As long as the document remains on Essential Construction you will be able to download it once purchased.

Yes, in most cases (with the exception of stock photography and ebooks) the files you will receive are editable.

We accept debit, all credit cards (Visa, Amex Mastercard etc) as well as payments via Apple Pay, Google Pay and Paypal.

Our return policy varies based on the product, for more information you can find our detailed return policy here.

Our documents are for use on your projects. You may not resell these documents on other marketplaces.

Full Description

If you ask any experienced construction professional, they will tell you that quality assurance and quality control are the magic sauce to many projects. Ensuring that people are checking the correct items prior to and post installation will ensure that your team stands a better chance of delivering the quality required by the project.

The best way to check both quality before and after installation is through a checklist. A predefined checklist for your specific scope of work, can be standardized and rolled out across your project, ensuring that people maintain consistency in their quality control and corners are not cut.

This quality control checklist is for demolition work, specifically flooring removals. It features over 10 different items to check both before and after flooring removals has been completed. Use it on your construction project to improve quality.

Reviews

There are no reviews yet

Be the first to review “QAQC Checklist – Demolition Work (Flooring Removals)”

SKU: 2021214P Category: Tags: , , , ,

More like this: Quality

Lifting device checklist
Lifting Device Construction Checklist
Construction checklist - confined space
Mobile Batch Plant Construction Checklist
Construction Operations Forms – Request for Waterproofing
Mock-up Schedule
Mockup Schedule
Sieve Analysis and Fineness Modulus

More products by builderkp

Construction Signage – Watch For Pedestrians
Staff Histogram and Manpower Loading Chart
Transfer Of Prime Contractor Agreement
Site Investigation Log
Slips Trips and Falls Safety Policy
Demolition work - flooring removal qaqc
QAQC Checklist – Demolition Work (Flooring Removals)
$4.99