{"id":102596,"date":"2021-12-14T21:21:37","date_gmt":"2021-12-15T05:21:37","guid":{"rendered":"https:\/\/essential.construction\/files\/?post_type=product&#038;p=102596"},"modified":"2026-11-03T07:32:56","modified_gmt":"2026-11-03T14:32:56","slug":"qaqc-checklist-site-works-underground-plumbing","status":"publish","type":"product","link":"https:\/\/essential.construction\/files\/construction\/quality\/qaqc-checklist-site-works-underground-plumbing\/","title":{"rendered":"QAQC Checklist &#8211; Site Works (Underground Plumbing)"},"content":{"rendered":"<p>This QA\/QC checklist for underground plumbing helps your team carry out an underground plumbing inspection before and after installation. It is built for site works on new construction, so you can confirm buried drainage and water lines are installed to the drawings and tested before they are covered by backfill or a slab.<\/p>\n<h2>What is an underground plumbing inspection checklist?<\/h2>\n<p>An underground plumbing inspection checklist is a quality control form used to check plumbing that will be buried below grade or under a slab. Before work, it confirms things like approvals, setting out and materials. After work, it confirms the installation, such as pipe sizes, routes, grades, supports, cleanouts and testing, before the pipework is covered. Once underground plumbing is buried, defects are costly to find and fix, so this check is one of the most important on a new building.<\/p>\n<h2>When to use it<\/h2>\n<ul>\n<li>Before trenching and installing underground drainage or water lines<\/li>\n<li>After installation and testing, before backfill<\/li>\n<li>Before a slab-on-grade is poured over plumbing<\/li>\n<li>Before the authority&#8217;s underground plumbing inspection<\/li>\n<li>As an inspection and test plan hold point and for the quality file<\/li>\n<\/ul>\n<h2>What&#8217;s included<\/h2>\n<p>This is a spreadsheet (.xlsx) quality control checklist for site works, specifically underground plumbing. It features over 10 items to check both before and after underground plumbing work is completed. It is designed to be standardized across your project so everyone checks the same things.<\/p>\n<h2>How to fill it out<\/h2>\n<ol>\n<li>Fill in the project, the area or grid lines, and the systems being installed.<\/li>\n<li>Check that the latest approved drawings and material submittals are on site.<\/li>\n<li>Go through the before-work items and confirm each one.<\/li>\n<li>After installation, check pipe sizes, routes, grades, bedding, joints and cleanouts against the drawings.<\/li>\n<li>Witness the pressure or water test and record the result.<\/li>\n<li>Record any defects, the corrective action and who will close them out.<\/li>\n<li>Sign the checklist, attach test records and photos, and release the area for backfill only when it is accepted.<\/li>\n<\/ol>\n<h2>Tips<\/h2>\n<ul>\n<li>Photograph and measure pipe locations before backfill to support your as-built drawings.<\/li>\n<li>Keep pipes capped and protected from debris until connections are made.<\/li>\n<li>Check penetrations and sleeves through footings and slabs before concrete is placed.<\/li>\n<li>Coordinate the backfill with the plumber so the test is kept in place where required.<\/li>\n<\/ul>\n<h2>Related templates and guides<\/h2>\n<ul>\n<li><a href=\"https:\/\/essential.construction\/files\/construction\/quality\/qaqc-checklist-site-works-excavation\/\">QAQC Checklist \u2013 Site Works (Excavation)<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/files\/construction\/quality\/quality-checklist-plumbing-and-sanitary-works\/\">Quality Checklist \u2013 Plumbing and Sanitary Works<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/files\/construction\/quality\/plumbing-design-quality-checklist\/\">Plumbing Design Quality Checklist<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/files\/construction\/quality\/construction-project-quality-checklist-250-items\/\">Construction Project Quality Checklist (250+ items)<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/academy\/tutorials\/controlling-quality-on-the-jobsite\/\">Controlling Quality on the Construction Site<\/a><\/li>\n<\/ul>\n<h2>Frequently asked questions<\/h2>\n<h3>What is an underground plumbing inspection?<\/h3>\n<p>It is the first plumbing inspection on many new buildings. The building inspector checks drainage and water piping installed below grade or under the slab, usually while the system is under test, before it is backfilled or covered with concrete.<\/p>\n<h3>How do you inspect underground piping?<\/h3>\n<p>Check the pipe material and size against the drawings, the slope of drain lines, bedding and support, joints and fittings, cleanout locations and protection at penetrations. Then confirm the system holds a water or air test for the time required by the local plumbing code.<\/p>\n<h3>What test is used for underground drainage?<\/h3>\n<p>Drainage piping is usually tested with water or air. The required head, pressure and duration are set by the plumbing code adopted in your area, so check local requirements and record the result on the checklist.<\/p>\n<h3>What is the difference between underground and rough-in plumbing inspections?<\/h3>\n<p>The underground inspection covers piping below the slab or in the ground. The rough-in inspection comes later and covers piping inside walls and ceilings before they are closed in. A final inspection follows when fixtures are installed.<\/p>\n<h3>What is a QC checklist?<\/h3>\n<p>A quality control checklist is a list of items to inspect for a specific scope of work. It makes sure everyone checks the same things, records the results and fixes defects before the work is covered or the next trade starts.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Use this site works underground plumbing quality control checklist to check for items both before and after installation.<\/p>\n","protected":false},"featured_media":102604,"comment_status":"open","ping_status":"closed","template":"","meta":[],"product_brand":[],"product_cat":[37],"product_tag":[82,1425,1410,1412,1940,2061,1401,2062],"class_list":["post-102596","product","type-product","status-publish","has-post-thumbnail","product_cat-quality","product_tag-checklist","product_tag-plumbing","product_tag-qaqc","product_tag-quality-control","product_tag-services","product_tag-site-works","product_tag-sitework","product_tag-underground-plumbing","","woocommerce-text-align-left","woocommerce-image-align-center","member-discount","discount-restricted","first","instock","downloadable","virtual","sold-individually","purchasable","product-type-simple"],"_links":{"self":[{"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/product\/102596","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/types\/product"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/comments?post=102596"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/media\/102604"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/media?parent=102596"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/product_brand?post=102596"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/product_cat?post=102596"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/product_tag?post=102596"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}