{"id":16964,"date":"2021-04-08T19:33:21","date_gmt":"2021-04-09T02:33:21","guid":{"rendered":"https:\/\/essential.construction\/files\/?post_type=product&#038;p=16964"},"modified":"2026-11-02T17:57:00","modified_gmt":"2026-11-03T00:57:00","slug":"confirmation-of-verbal-instruction","status":"publish","type":"product","link":"https:\/\/essential.construction\/files\/construction\/administration\/confirmation-of-verbal-instruction\/","title":{"rendered":"Confirmation of Verbal Instruction"},"content":{"rendered":"<p>A confirmation of verbal instruction (CVI) puts an instruction given verbally on site into writing. Use this template to record directions given to trades and other people on your jobsite, so you can act quickly on the day and still have a clear record later.<\/p>\n<h2>What is a confirmation of verbal instruction?<\/h2>\n<p>A confirmation of verbal instruction is a short written record of an instruction that was given verbally, usually on site or by phone. It notes who gave the instruction, who received it, when, and exactly what was instructed. The CVI is sent to the person who gave the instruction so they can confirm or correct it. It protects both sides if there is a later question about cost, time or responsibility.<\/p>\n<h2>When to use it<\/h2>\n<ul>\n<li>The architect, engineer or client&#8217;s representative gives a direction during a site walk.<\/li>\n<li>A superintendent gives a trade an urgent instruction that cannot wait for paperwork.<\/li>\n<li>Instructions are given by phone and need a written record.<\/li>\n<li>A verbal direction may affect cost, schedule or the work of other trades.<\/li>\n<li>Your contract requires instructions to be confirmed in writing.<\/li>\n<\/ul>\n<h2>What&#8217;s included<\/h2>\n<p>The template is a spreadsheet file (.xlsx) for documenting verbal instructions given to trades and people on site. You can add your project details, fill it out on a computer or print it for use on the jobsite.<\/p>\n<h2>How to fill it out<\/h2>\n<ol>\n<li>Give the CVI a number and enter the project name and date.<\/li>\n<li>Record who gave the instruction, their company and role, and who received it.<\/li>\n<li>Note the date, time and place the instruction was given.<\/li>\n<li>Describe the instruction exactly, with locations, drawing references and any sketches or photos.<\/li>\n<li>Note whether you expect the instruction to affect cost or time.<\/li>\n<li>Send the CVI to the person who gave the instruction and ask them to confirm it in writing.<\/li>\n<li>Log it and follow up through the contract&#8217;s change process if there is a cost or time impact.<\/li>\n<\/ol>\n<h2>Tips<\/h2>\n<ul>\n<li>Send the CVI the same day, while details are fresh.<\/li>\n<li>Keep wording factual. Record what was said, not opinions.<\/li>\n<li>Check your contract for any time limit on confirming instructions in writing.<\/li>\n<\/ul>\n<h2>Related templates and guides<\/h2>\n<ul>\n<li><a href=\"https:\/\/essential.construction\/files\/construction\/administration\/site-instruction-template\/\">Site Instruction Template<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/files\/construction\/administration\/change-order-template\/\">Change Order Template<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/files\/construction\/administration\/change-order-log\/\">Change Order Log<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/academy\/glossary\/site-instruction\/\">Glossary: Site Instruction (SI)<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/academy\/glossary\/change-directive\/\">Glossary: Change Directive (CD)<\/a><\/li>\n<\/ul>\n<h2>Frequently asked questions<\/h2>\n<h3>What does CVI stand for in construction?<\/h3>\n<p>CVI stands for confirmation of verbal instruction. It is a written record of an instruction that was given verbally, usually on site or by phone, sent back to the person who gave it so they can confirm it. It is common on projects in the UK, Australia, Asia and the Middle East.<\/p>\n<h3>What is a verbal instruction?<\/h3>\n<p>A verbal instruction is a direction given by speaking rather than in writing, for example by the architect during a site walk or by a superintendent to a trade foreman. Verbal instructions are quick, but they are easy to forget or dispute later, which is why they should be confirmed in writing.<\/p>\n<h3>Is a verbal instruction binding on a construction project?<\/h3>\n<p>It depends on the contract. Many contracts say instructions must be in writing, or must be confirmed in writing within a set time, to be valid. A CVI turns a verbal direction into a written record so it can be accepted or corrected, and so it can be valued if it changes the work.<\/p>\n<h3>Who should send a confirmation of verbal instruction?<\/h3>\n<p>Usually the person who received the instruction sends it, most often the contractor&#8217;s project manager or superintendent, to the person who gave it, such as the architect, engineer or client&#8217;s representative. Subcontractors can also use a CVI to confirm instructions from the general contractor.<\/p>\n<h3>Does a CVI approve extra cost?<\/h3>\n<p>No. A CVI records the instruction; it does not agree a price. If the instruction changes the scope, cost or schedule, follow the contract&#8217;s change process, such as a variation or change order, and get the change approved in writing before or as soon as the work proceeds.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A confirmation of verbal instruction (CVI) puts an instruction given verbally on site into writing. Use this template to record &#8230; <a title=\"Confirmation of Verbal Instruction\" class=\"read-more\" href=\"https:\/\/essential.construction\/files\/construction\/administration\/confirmation-of-verbal-instruction\/\" aria-label=\"Read more about Confirmation of Verbal Instruction\">Read more<\/a><\/p>\n","protected":false},"featured_media":16966,"comment_status":"open","ping_status":"closed","template":"","meta":[],"product_brand":[],"product_cat":[40],"product_tag":[1352,1350,32,1351],"class_list":["post-16964","product","type-product","status-publish","has-post-thumbnail","product_cat-administration","product_tag-administration","product_tag-confirmation","product_tag-construction","product_tag-verbal-instruction","","woocommerce-text-align-left","woocommerce-image-align-center","member-discount","discount-restricted","first","instock","downloadable","virtual","sold-individually","purchasable","product-type-simple"],"_links":{"self":[{"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/product\/16964","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/types\/product"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/comments?post=16964"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/media\/16966"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/media?parent=16964"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/product_brand?post=16964"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/product_cat?post=16964"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/product_tag?post=16964"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}