{"id":345726,"date":"2026-11-26T11:59:01","date_gmt":"2026-11-26T18:59:01","guid":{"rendered":"https:\/\/essential.construction\/files\/?post_type=product&#038;p=345726"},"modified":"2026-11-26T11:59:39","modified_gmt":"2026-11-26T18:59:39","slug":"field-level-hazard-assessment-flha-form","status":"publish","type":"product","link":"https:\/\/essential.construction\/files\/construction\/safety\/field-level-hazard-assessment-flha-form\/","title":{"rendered":"Field Level Hazard Assessment (FLHA) Form"},"content":{"rendered":"<p>This field level hazard assessment (FLHA) form is a two-sided pre-task plan card for crews to fill in at the work location before a task starts. It covers pre-start checks, hazards present, task steps with controls and risk ratings, PPE, crew sign-on, changes during the shift, end-of-shift close-out and supervisor review.<\/p>\n<h2>What is a field level hazard assessment?<\/h2>\n<p>A field level hazard assessment, or FLHA, is a short hazard check done by the crew at the work location, at the start of a shift or task and again when conditions change. It looks at the actual conditions in front of the crew today, such as weather, ground, nearby trades, overhead lines and openings, and records the controls the crew will use. In the US the same tool is often called a pre-task plan (PTP).<\/p>\n<h2>When to use it<\/h2>\n<ul>\n<li>At the start of every shift, before the crew begins work<\/li>\n<li>Before each new task, or when the crew moves to a new work area<\/li>\n<li>When something changes: weather, crew members, equipment, or work by other trades nearby<\/li>\n<li>For high-risk work alongside your permits, such as hot work, work at heights or excavation<\/li>\n<\/ul>\n<h2>FLHA vs job hazard analysis<\/h2>\n<p>A <a href=\"https:\/\/essential.construction\/files\/construction\/safety\/job-hazard-analysis-form\/\">job hazard analysis (JHA)<\/a> is written ahead of time by a supervisor or safety staff and sets the standard steps and controls for a type of work. The FLHA is done in the field by the crew, every shift, and checks that those controls fit today&#8217;s conditions. Most sites use both, together with regular <a href=\"https:\/\/essential.construction\/academy\/glossary\/toolbox-talk\/\">toolbox talks<\/a>.<\/p>\n<h2>What&#8217;s included<\/h2>\n<p>The download is an editable Word document (.docx), 3 pages, set up to print double-sided as one card:<\/p>\n<table>\n<thead>\n<tr>\n<th>Section<\/th>\n<th>What it covers<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Header<\/td>\n<td>Project, task and location, date and time, crew lead, permit numbers, muster point, first aid and emergency details<\/td>\n<\/tr>\n<tr>\n<td>1. Before you start<\/td>\n<td>12 yes \/ no \/ N\/A checks: permits, procedures, tool inspection, SDS, PPE, access, utilities, weather, emergency plan, training<\/td>\n<\/tr>\n<tr>\n<td>2. Hazards present<\/td>\n<td>18 tick boxes from working at heights and suspended loads to silica, stored energy and working alone<\/td>\n<\/tr>\n<tr>\n<td>3. Task steps<\/td>\n<td>8 rows for step, hazard, risk before, controls and risk after<\/td>\n<\/tr>\n<tr>\n<td>4. PPE<\/td>\n<td>10 tick boxes, with space to name glove and respirator types<\/td>\n<\/tr>\n<tr>\n<td>5 to 8 (back)<\/td>\n<td>Crew sign-on for 12 workers, re-assessment log, end-of-shift checks, crew lead and supervisor sign-off<\/td>\n<\/tr>\n<tr>\n<td>How to use<\/td>\n<td>Step-by-step instructions and an FLHA vs JHA vs toolbox talk comparison<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>How to fill it out<\/h2>\n<ol>\n<li>Walk the work area first, then fill in the header at the work location, not in the trailer.<\/li>\n<li>Answer the pre-start checks. Fix any &#8220;No&#8221; before the task starts.<\/li>\n<li>Tick every hazard present today.<\/li>\n<li>Break the task into its main steps. For each one, write the hazard, rate the risk, list the controls and rate the risk again.<\/li>\n<li>Tick the PPE required.<\/li>\n<li>Review the card with the whole crew and have everyone sign on. Anyone who joins later is briefed and signs before starting.<\/li>\n<li>If conditions change, stop, re-assess in section 6 and brief the crew again.<\/li>\n<li>At the end of the shift, complete the close-out and hand the card to the supervisor.<\/li>\n<\/ol>\n<h2>Tips<\/h2>\n<ul>\n<li>Choose controls from the top of the hierarchy of controls first: eliminate, substitute, engineering, administrative, then PPE (<a href=\"https:\/\/www.ccohs.ca\/oshanswers\/hsprograms\/hazard\/hierarchy_controls.html\" target=\"_blank\" rel=\"noopener nofollow\">CCOHS<\/a>). PPE alone is the weakest option.<\/li>\n<li>Keep it specific. &#8220;Be careful&#8221; is not a control; &#8220;barricade the opening and tie off to the anchor on gridline C&#8221; is.<\/li>\n<li>Supervisors should read the cards and talk to the crew about them, not just collect signatures.<\/li>\n<li>In Canada, workers have the right to know about hazards, to participate and to refuse unsafe work (<a href=\"https:\/\/www.ccohs.ca\/oshanswers\/legisl\/legislation\/three_rights.html\" target=\"_blank\" rel=\"noopener nofollow\">CCOHS<\/a>). Use the card to make speaking up normal.<\/li>\n<li>This is a general template. Add your company&#8217;s requirements and check your local regulations and site-specific requirements.<\/li>\n<\/ul>\n<h2>Related templates and guides<\/h2>\n<ul>\n<li><a href=\"https:\/\/essential.construction\/files\/construction\/safety\/job-hazard-analysis-form\/\">Job Hazard Analysis Form<\/a> for planning a type of work in advance<\/li>\n<li><a href=\"https:\/\/essential.construction\/files\/construction\/safety\/hazard-identification-and-assessment-program\/\">Hazard Identification and Assessment Program<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/files\/construction\/safety\/safety-meeting-attendance-log\/\">Safety Meeting Attendance Log<\/a> for toolbox talks<\/li>\n<li><a href=\"https:\/\/essential.construction\/files\/construction\/safety\/construction-site-safety-plan-template\/\">Construction Site Safety Plan Template<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/academy\/glossary\/job-hazard-analysis\/\">What is a job hazard analysis?<\/a><\/li>\n<\/ul>\n<h2>Frequently asked questions<\/h2>\n<h3>What does FLHA stand for?<\/h3>\n<p>Field level hazard assessment. It is a short, written hazard check completed by the crew at the work location before and during a task.<\/p>\n<h3>Who fills out the FLHA?<\/h3>\n<p>The crew doing the work, usually led by the foreman or crew lead. Every worker on the task should review it and sign on, and a supervisor reviews it during the shift.<\/p>\n<h3>How often should an FLHA be done?<\/h3>\n<p>At the start of each shift or task, and again whenever conditions change, such as new work, weather, crew members or nearby activities. Follow your company and site rules if they are stricter.<\/p>\n<h3>Is a pre-task plan the same as an FLHA?<\/h3>\n<p>They do the same job. &#8220;FLHA&#8221; is the common term in Canada and &#8220;pre-task plan&#8221; is common on US sites. This form works for both.<\/p>\n<h3>Is this template free?<\/h3>\n<p>It is a paid template at the price shown on this page, or you can download it free with a 14-day membership trial.<\/p>\n","protected":false},"excerpt":{"rendered":"<ul>\n<li>Two-sided FLHA \/ pre-task plan card for crews at the work location<\/li>\n<li>Pre-start checks, hazards, task steps with controls and risk ratings, PPE<\/li>\n<li>Crew sign-on, re-assessment log, end-of-shift and supervisor sign-off<\/li>\n<\/ul>\n","protected":false},"featured_media":345725,"comment_status":"open","ping_status":"closed","template":"","meta":[],"product_brand":[],"product_cat":[38],"product_tag":[2310,1283,427,2311,51],"class_list":["post-345726","product","type-product","status-publish","has-post-thumbnail","product_cat-safety","product_tag-flha","product_tag-hazard","product_tag-jobsite-safety","product_tag-pre-task-plan","product_tag-safety","","woocommerce-text-align-left","woocommerce-image-align-center","member-discount","discount-restricted","first","instock","downloadable","virtual","sold-individually","purchasable","product-type-simple"],"_links":{"self":[{"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/product\/345726","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/types\/product"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/comments?post=345726"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/media\/345725"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/media?parent=345726"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/product_brand?post=345726"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/product_cat?post=345726"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/product_tag?post=345726"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}