{"id":58095,"date":"2021-08-05T22:58:18","date_gmt":"2021-08-06T05:58:18","guid":{"rendered":"https:\/\/essential.construction\/files\/?post_type=product&#038;p=58095"},"modified":"2026-11-02T17:54:34","modified_gmt":"2026-11-03T00:54:34","slug":"request-letter-for-variation-order","status":"publish","type":"product","link":"https:\/\/essential.construction\/files\/construction\/administration\/request-letter-for-variation-order\/","title":{"rendered":"Request Letter for Variation Order"},"content":{"rendered":"<p>This variation letter template lets a contractor or subcontractor formally request a variation order when the scope of work changes. Use it to put additions, deductions or revisions in writing so the owner, client or main contractor can evaluate the change before the work goes ahead.<\/p>\n<h2>What is a variation letter in construction?<\/h2>\n<p>A variation letter is a formal written request or notice that a change to the contracted scope of work is needed. It describes the proposed addition, omission or revision and asks the other party to review and approve it through a variation order. Variations are common on construction projects because designs develop, site conditions differ from what was expected and clients change their requirements. Putting the request in writing creates a clear record before cost and time are agreed.<\/p>\n<h2>When to use it<\/h2>\n<ul>\n<li>The client asks for extra work that is not in the contract scope<\/li>\n<li>Site conditions differ from the drawings and the planned method has to change<\/li>\n<li>A specification or design change adds or removes work<\/li>\n<li>A subcontractor needs the main contractor to approve a change before proceeding<\/li>\n<li>You need a written record to support a later claim for cost or time<\/li>\n<\/ul>\n<h2>What&#8217;s included<\/h2>\n<p>This is an editable request letter for a variation order, supplied as a document file (.docx). It is set up so you, as the contractor or subcontractor, can present a proposed change to the owner, client or general contractor for formal evaluation before inspection and before the changed work proceeds. Edit the details to suit your project and contract.<\/p>\n<h2>How to fill it out<\/h2>\n<ol>\n<li>Reference the project name, contract and any related instruction, RFI or drawing.<\/li>\n<li>Describe the change clearly: what is being added, removed or revised, and where.<\/li>\n<li>Explain why the change is needed, such as a client request or an unforeseen site condition.<\/li>\n<li>State the likely effect on cost and schedule, or say that a priced breakdown will follow.<\/li>\n<li>Ask for written approval or a variation order before the work proceeds.<\/li>\n<li>Sign, date and send the letter, and file a copy in your variation register.<\/li>\n<\/ol>\n<h2>Tips<\/h2>\n<ul>\n<li>Send the letter as soon as you know about the change. Late notice weakens your position.<\/li>\n<li>Check your contract for notice periods and the required format for variations.<\/li>\n<li>Attach photos, marked-up drawings or site instructions that support the request.<\/li>\n<li>Do not start varied work on a verbal promise. Get it in writing.<\/li>\n<\/ul>\n<h2>Related templates and guides<\/h2>\n<ul>\n<li><a href=\"https:\/\/essential.construction\/files\/construction\/administration\/validation-letter-for-variation-orders\/\">Validation Letter for Variation Orders<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/files\/construction\/administration\/variation-order-template\/\">Variation Order \u2013 Template<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/files\/business-operations\/finance\/variation-order-vao-register\/\">Variation Order (VAO) Register<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/files\/construction\/administration\/change-order-template\/\">Change Order Template<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/academy\/tutorials\/your-guide-to-submitting-a-construction-change-request\/\">Your Guide to Submitting a Construction Change Request<\/a><\/li>\n<\/ul>\n<h2>Frequently asked questions<\/h2>\n<h3>What is a variation letter?<\/h3>\n<p>In construction, a variation letter is a written notice or request that the scope of work needs to change. It describes the proposed change and asks the client or main contractor to review and approve it, usually by issuing a variation order that sets the agreed cost and time.<\/p>\n<h3>What is the difference between a variation letter and a variation order?<\/h3>\n<p>The variation letter is the request or notice, normally sent by the contractor. The variation order is the formal instruction that approves the change, typically issued by the client, contract administrator or main contractor. The order is what authorizes the work and adjusts the contract.<\/p>\n<h3>Is a variation the same as a change order?<\/h3>\n<p>They mean much the same thing. Variation is the common term in the UK, Australia, the Middle East and parts of Asia, while change order is more common in North America. Both describe a formal change to the contracted scope, cost or time.<\/p>\n<h3>Can a contractor reject a variation?<\/h3>\n<p>It depends on the contract. Many contracts allow the client to instruct reasonable variations within the general scope, while some changes, such as work outside the original scope, may need agreement. Check the variation clause in your contract and get advice if you are unsure.<\/p>\n<h3>What should I attach to a variation request letter?<\/h3>\n<p>Attach anything that shows what changed and why: marked-up drawings, photos, site instructions, RFI responses and a cost or time breakdown if you have one. Good supporting documents make the request faster to review and easier to approve.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Request Letter for a Variation: The\u00a0contractor&#8217;s lead consultant usually issued letters to inform subordinates and owners about the project&#8217;s changes.<\/p>\n","protected":false},"featured_media":58098,"comment_status":"open","ping_status":"closed","template":"","meta":[],"product_brand":[],"product_cat":[40,37,1399],"product_tag":[32,91,1411,1212,1669],"class_list":["post-58095","product","type-product","status-publish","has-post-thumbnail","product_cat-administration","product_cat-quality","product_cat-reporting","product_tag-construction","product_tag-inspection","product_tag-quality-assurance","product_tag-regulations","product_tag-vao","","woocommerce-text-align-left","woocommerce-image-align-center","member-discount","discount-restricted","first","instock","downloadable","virtual","sold-individually","purchasable","product-type-simple"],"_links":{"self":[{"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/product\/58095","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/types\/product"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/comments?post=58095"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/media\/58098"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/media?parent=58095"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/product_brand?post=58095"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/product_cat?post=58095"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/product_tag?post=58095"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}