{"id":659,"date":"2020-10-24T21:26:09","date_gmt":"2020-10-25T04:26:09","guid":{"rendered":"https:\/\/essential.construction\/files\/?post_type=product&#038;p=659"},"modified":"2026-11-03T07:32:48","modified_gmt":"2026-11-03T14:32:48","slug":"six-week-look-ahead-schedule-template","status":"publish","type":"product","link":"https:\/\/essential.construction\/files\/construction\/scheduling\/six-week-look-ahead-schedule-template\/","title":{"rendered":"Six Week Look Ahead Schedule Template"},"content":{"rendered":"<p>This 6 week look ahead schedule template helps you share a short-term, detailed schedule with your trades, general contractor and owner. Regular six week look ahead updates break the master schedule down into the activities that matter now, so everyone knows what is coming and what is expected of them.<\/p>\n<h2>What is a six week look ahead schedule?<\/h2>\n<p>A six week look ahead schedule is a short-term schedule that shows the activities planned for the next six weeks in more detail than the master schedule. It is usually updated weekly and reviewed with the trades at the foremen&#8217;s or coordination meeting. Looking six weeks out gives enough time to spot problems with submittals, deliveries, inspections and labor, and fix them before they delay the work.<\/p>\n<h2>When to use it<\/h2>\n<ul>\n<li>At weekly foremen&#8217;s or subcontractor coordination meetings<\/li>\n<li>When breaking down the master schedule into tasks the trades can act on<\/li>\n<li>When planning deliveries, crane time, inspections and access<\/li>\n<li>When a recovery plan is needed after a delay<\/li>\n<li>When reporting short-term plans to the owner or general contractor<\/li>\n<\/ul>\n<h2>What&#8217;s included<\/h2>\n<p>This is an Excel spreadsheet template with:<\/p>\n<ul>\n<li>Activity name and trade name columns<\/li>\n<li>The ability to change the date and day of the week in a column<\/li>\n<li>Conditional formatting to make changing colors and picking dates on your schedule easier<\/li>\n<li>Formatting that extends further, so you can also use it as a two or three week look ahead<\/li>\n<li>Repeating print styles, with page numbers and a repeating date row<\/li>\n<\/ul>\n<h2>How to fill it out<\/h2>\n<ol>\n<li>Set the start date for the six week window.<\/li>\n<li>Pull the activities for those six weeks from the master schedule.<\/li>\n<li>Break each activity down into tasks by area or floor, with the responsible trade.<\/li>\n<li>Mark the days each task is planned using the color formatting.<\/li>\n<li>Check each task for constraints, such as approved submittals, materials, permits or access.<\/li>\n<li>Review the draft with the trades and adjust it based on their input.<\/li>\n<li>Print or share the updated schedule and roll it forward one week every week.<\/li>\n<\/ol>\n<h2>Tips<\/h2>\n<ul>\n<li>Keep the look ahead tied to the master schedule. It should add detail, not change the plan.<\/li>\n<li>Ask each trade to commit to their tasks for the coming week.<\/li>\n<li>Track what was planned against what was done to improve future plans.<\/li>\n<li>Use a color key that everyone understands and keep it the same across updates.<\/li>\n<\/ul>\n<h2>Related templates and guides<\/h2>\n<ul>\n<li><a href=\"https:\/\/essential.construction\/files\/construction\/scheduling\/three-week-look-ahead-schedule-template\/\">Three Week Look Ahead Schedule Template<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/files\/construction\/scheduling\/weekly-lookahead-planner\/\">Weekly Lookahead Planner<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/academy\/tutorials\/lean-construction-pull-planning-explained\/\">Lean Construction \u2013 Pull Planning Explained<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/academy\/tutorials\/fundamentals-of-construction-scheduling\/\">Fundamentals Of Construction Scheduling<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/academy\/glossary\/critical-path\/\">Critical Path (glossary)<\/a><\/li>\n<\/ul>\n<h2>Frequently asked questions<\/h2>\n<h3>What is a look ahead schedule in construction?<\/h3>\n<p>A look ahead schedule is a short-term plan, usually two to six weeks long, that shows upcoming work in more detail than the master schedule. It helps superintendents and trades coordinate tasks, find constraints early and keep the project on track.<\/p>\n<h3>Why use a six week look ahead instead of three weeks?<\/h3>\n<p>Six weeks gives more time to deal with longer constraints, such as material deliveries, submittal approvals, inspections and equipment bookings. Many teams use a six week view for planning and a two or three week view for detailed day-to-day coordination.<\/p>\n<h3>How often should a look ahead schedule be updated?<\/h3>\n<p>Most teams update it weekly, before or during the weekly coordination meeting. Each week the window rolls forward, completed work is marked off and new activities are added from the master schedule.<\/p>\n<h3>Who prepares the look ahead schedule?<\/h3>\n<p>It is usually prepared by the superintendent or project scheduler, with input from each trade foreman. Getting the trades involved makes the schedule more realistic and builds commitment to the dates.<\/p>\n<h3>Can this template be used for a two or three week look ahead?<\/h3>\n<p>Yes. The formatting has been extended so that, if you are comfortable in Excel, you can adapt the template to a two or three week look ahead. Many teams keep the six week view for planning and print a shorter window for daily coordination.<\/p>\n","protected":false},"excerpt":{"rendered":"<ul>\n<li>Provide look ahead schedules for your trades<\/li>\n<li>Clearly communicate expectations<\/li>\n<li>Break down your project schedule further<\/li>\n<\/ul>\n","protected":false},"featured_media":661,"comment_status":"open","ping_status":"closed","template":"","meta":[],"product_brand":[],"product_cat":[28,40,37],"product_tag":[310,130,311,34,312,313,314,315],"class_list":["post-659","product","type-product","status-publish","has-post-thumbnail","product_cat-scheduling","product_cat-administration","product_cat-quality","product_tag-construction-schedule","product_tag-foremans-meeting","product_tag-microsoft-excel","product_tag-schedule","product_tag-schedule-template","product_tag-short-term-schedule","product_tag-six-week","product_tag-six-week-schedule-template","","woocommerce-text-align-left","woocommerce-image-align-center","member-discount","discount-restricted","first","instock","downloadable","virtual","sold-individually","purchasable","product-type-simple"],"_links":{"self":[{"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/product\/659","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/types\/product"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/comments?post=659"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/media\/661"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/media?parent=659"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/product_brand?post=659"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/product_cat?post=659"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/product_tag?post=659"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}