{"id":707,"date":"2020-10-25T10:56:56","date_gmt":"2020-10-25T17:56:56","guid":{"rendered":"https:\/\/essential.construction\/files\/?post_type=product&#038;p=707"},"modified":"2026-11-02T17:52:29","modified_gmt":"2026-11-03T00:52:29","slug":"submittal-form-template","status":"publish","type":"product","link":"https:\/\/essential.construction\/files\/construction\/administration\/submittal-form-template\/","title":{"rendered":"Submittal Form Template"},"content":{"rendered":"<p>This construction submittal template is a standard cover page you attach to the front of each submittal before sending it to the architect or engineer for review. It helps you organize your project submittals, make sure each one is clearly identified and set deadlines for reviews.<\/p>\n<h2>What is a construction submittal?<\/h2>\n<p>A construction submittal is a package of information the contractor provides to show how the work will meet the contract documents. Typical submittals include shop drawings, product data, samples, mockups, test reports and warranties. Submittals are required at the start of almost every construction project. The contractor reviews each one first, attaches a cover form and sends it to the architect or engineer, who reviews it and returns it with an action before materials are ordered or installed.<\/p>\n<h2>When to use it<\/h2>\n<ul>\n<li>At project start-up, when the first round of submittals is due.<\/li>\n<li>Each time you send shop drawings, product data or samples for review.<\/li>\n<li>When you need a consistent format across all trades and subcontractors.<\/li>\n<li>When you want a clear review deadline recorded on every submittal.<\/li>\n<li>When resubmitting an item that came back with comments.<\/li>\n<\/ul>\n<h2>What&#8217;s included<\/h2>\n<p>The template is an editable .xlsx spreadsheet with a standard submittal cover page. It includes fields for:<\/p>\n<ul>\n<li>Submittal due date<\/li>\n<li>Submittal return period<\/li>\n<li>Submittal submitted on<\/li>\n<li>Description<\/li>\n<li>Discipline<\/li>\n<\/ul>\n<h2>How to fill it out<\/h2>\n<ol>\n<li>Number the submittal so it can be tracked. Many teams use the specification section plus a sequence number.<\/li>\n<li>Enter the description of what is being submitted, such as the product, system or drawing.<\/li>\n<li>Select the discipline, for example architectural, structural, mechanical or electrical.<\/li>\n<li>Enter the date the submittal is due under your submittal schedule.<\/li>\n<li>Record the date you actually submitted it.<\/li>\n<li>Set the return period so the reviewer knows when you need the response.<\/li>\n<li>Attach it to the front of the package, send it and log it in your submittal schedule.<\/li>\n<\/ol>\n<h2>Tips<\/h2>\n<ul>\n<li>Review every subcontractor submittal before it goes out. Incomplete packages get returned.<\/li>\n<li>Use the return period from your contract, and allow extra time for resubmittals.<\/li>\n<li>Submit long lead items first so approvals do not hold up procurement.<\/li>\n<\/ul>\n<h2>Related templates and guides<\/h2>\n<ul>\n<li><a href=\"https:\/\/essential.construction\/files\/construction\/administration\/construction-submittal-schedule-template\/\">Construction Submittal Schedule Template<\/a> to plan and track all project submittals.<\/li>\n<li><a href=\"https:\/\/essential.construction\/files\/construction\/administration\/construction-submittal-workflow-template\/\">Construction Submittal Workflow Template<\/a> to map the review steps.<\/li>\n<li><a href=\"https:\/\/essential.construction\/files\/construction\/administration\/material-approval-request\/\">Material Approval Request<\/a> for material approvals.<\/li>\n<li><a href=\"https:\/\/essential.construction\/academy\/tutorials\/managing-construction-submittals\/\">Construction Submittals: Types, Process, Log and Examples<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/academy\/glossary\/mockup\/\">Mockup (glossary)<\/a><\/li>\n<\/ul>\n<h2>Frequently asked questions<\/h2>\n<h3>What are examples of construction submittals?<\/h3>\n<p>Common examples are shop drawings for steel, millwork or ductwork, product data sheets for doors, hardware and fixtures, physical samples of finishes, mockups of wall or window assemblies, concrete mix designs, test reports, and closeout items such as warranties and maintenance manuals.<\/p>\n<h3>What is a submittal return period?<\/h3>\n<p>The return period is the time the reviewer has to review a submittal and send it back. It is usually set in the contract or specifications. Recording it on the cover page makes the deadline clear and helps you plan orders and installation around it.<\/p>\n<h3>What is a submittal log?<\/h3>\n<p>A submittal log, or submittal schedule, is a list of every submittal required on the project with its due date, date submitted, reviewer, status and return date. The cover page goes on each individual submittal, while the log tracks them all together.<\/p>\n<h3>What happens after a submittal is reviewed?<\/h3>\n<p>The reviewer returns it with an action, typically approved, approved as noted, revise and resubmit, or rejected. Approved items can be ordered and installed. Items marked revise and resubmit must be corrected and sent again. The exact review actions depend on your contract.<\/p>\n","protected":false},"excerpt":{"rendered":"<ul>\n<li>Organize your project submittals<\/li>\n<li>Ensure each submittal is clearly identified<\/li>\n<li>Set deadlines for reviews<\/li>\n<\/ul>\n","protected":false},"featured_media":708,"comment_status":"open","ping_status":"closed","template":"","meta":[],"product_brand":[],"product_cat":[40,219],"product_tag":[57,381,382,262,354,59,383,384,277],"class_list":["post-707","product","type-product","status-publish","has-post-thumbnail","product_cat-administration","product_cat-free","product_tag-construction-management","product_tag-construction-submittal-form","product_tag-construction-submittal-template","product_tag-construction-template","product_tag-division-01-general-requirements","product_tag-excel","product_tag-submittal-form","product_tag-submittal-template","product_tag-word-template","","woocommerce-text-align-left","woocommerce-image-align-center","member-discount","discount-restricted","first","instock","downloadable","virtual","sold-individually","purchasable","product-type-simple"],"_links":{"self":[{"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/product\/707","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/types\/product"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/comments?post=707"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/media\/708"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/media?parent=707"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/product_brand?post=707"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/product_cat?post=707"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/product_tag?post=707"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}