{"id":91108,"date":"2021-11-14T20:28:21","date_gmt":"2021-11-15T04:28:21","guid":{"rendered":"https:\/\/essential.construction\/files\/?post_type=product&#038;p=91108"},"modified":"2026-11-03T07:36:43","modified_gmt":"2026-11-03T14:36:43","slug":"qaqc-checklist-door-installation","status":"publish","type":"product","link":"https:\/\/essential.construction\/files\/construction\/quality\/qaqc-checklist-door-installation\/","title":{"rendered":"QAQC Checklist &#8211; Door Installation"},"content":{"rendered":"<p>This door installation checklist helps supervisors and QA\/QC staff check doors both before and after they are installed. Use it on every opening so frames, hanging and hardware meet the drawings and specifications, and problems are fixed before the finishes and handover.<\/p>\n<h2>What is a door installation checklist?<\/h2>\n<p>A door installation checklist is a quality control form for the hanging and fitting of doors. Pre-installation checks confirm the door, frame, opening and hardware are correct and ready. Post-installation checks confirm the door is plumb, operates smoothly, latches, has even clearances and has all its hardware fitted. Each item is marked acceptable or not, and defects are recorded for correction and sign-off.<\/p>\n<h2>When to use it<\/h2>\n<ul>\n<li>Before doors are hung in a new area or floor<\/li>\n<li>After installation of doors and door hardware<\/li>\n<li>When checking a sample or mockup door before full production<\/li>\n<li>During punch list and pre-handover inspections<\/li>\n<li>When door hardware is changed or adjusted after installation<\/li>\n<\/ul>\n<h2>What&#8217;s included<\/h2>\n<p>The download is an Excel spreadsheet (.xlsx) quality control checklist for installing doors. It features more than 10 items, split between checks before the work and checks after the doors are installed. Use it as a standard checklist across your project so every inspection covers the same points.<\/p>\n<h2>How to fill it out<\/h2>\n<ol>\n<li>Enter the project, area and door numbers being inspected, using the door schedule.<\/li>\n<li>Before installation, confirm the door type, size and handing match the schedule.<\/li>\n<li>Check the frame is plumb, square, level and securely anchored, and the opening is clean.<\/li>\n<li>Confirm the correct hardware is on site and any preparation for it is done.<\/li>\n<li>After installation, check clearances at the head, jambs and threshold, and that the door swings freely.<\/li>\n<li>Check latching, closers, stops and locks work, and that the finish is undamaged.<\/li>\n<li>Record defects and the responsible trade, then re-inspect and sign off.<\/li>\n<\/ol>\n<h2>Tips<\/h2>\n<ul>\n<li>Inspect frames before doors arrive. Most door problems start with a frame out of plumb.<\/li>\n<li>Check a first-installed door with the installer to agree the standard.<\/li>\n<li>Protect installed doors and hardware until finishes are complete.<\/li>\n<li>Keep the door schedule at hand so handing and hardware sets can be checked on the spot.<\/li>\n<\/ul>\n<h2>Related templates and guides<\/h2>\n<ul>\n<li><a href=\"https:\/\/essential.construction\/files\/construction\/quality\/qaqc-checklist-door-frame-installation\/\">QAQC Checklist \u2013 Door Frame Installation<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/files\/construction\/quality\/qaqc-checklist-wood-doors\/\">QAQC Checklist \u2013 Wood Doors<\/a> \u2013 extra checks for wood door leaves.<\/li>\n<li><a href=\"https:\/\/essential.construction\/files\/construction\/quality\/deficiency-log-template\/\">Deficiency Log Template<\/a> \u2013 track open door defects to close-out.<\/li>\n<li><a href=\"https:\/\/essential.construction\/files\/construction\/quality\/\">Browse all quality control checklists<\/a><\/li>\n<li><a href=\"https:\/\/essential.construction\/academy\/tutorials\/controlling-quality-on-the-jobsite\/\">Controlling Quality on the Construction Site<\/a><\/li>\n<\/ul>\n<h2>Frequently asked questions<\/h2>\n<h3>What should be checked before installing a door?<\/h3>\n<p>Confirm the door type, size and handing against the door schedule, check the frame is plumb, square and securely fixed, make sure the opening is clean and the floor finish level is known, and check that the right hardware has arrived and the door is prepared for it.<\/p>\n<h3>What should be checked after a door is installed?<\/h3>\n<p>Check that the door is plumb, swings freely without binding, latches every time, and has even clearances around the leaf. Confirm hardware such as hinges, locks, closers and stops is complete, tight and working, and that the door and frame finishes are undamaged.<\/p>\n<h3>What is the difference between a pre-installation and post-installation checklist?<\/h3>\n<p>A pre-installation checklist confirms everything is ready before work starts: materials, openings and preparation. A post-installation checklist confirms the finished work meets the specification. This checklist covers both stages in one form.<\/p>\n<h3>Does this checklist cover windows?<\/h3>\n<p>No. It is written for doors and door hardware. Windows need different checks, such as anchoring, flashing, sealing and water testing, so use a dedicated window installation checklist or add window items to your inspection and test plan.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Use this door installation quality control checklist to check for items both before and after the work.<\/p>\n","protected":false},"featured_media":91111,"comment_status":"open","ping_status":"closed","template":"","meta":[],"product_brand":[],"product_cat":[37],"product_tag":[2007,2009,2012,2010,1625,2008,2011,1410,94,1411,1412],"class_list":["post-91108","product","type-product","status-publish","has-post-thumbnail","product_cat-quality","product_tag-door","product_tag-door-hanging","product_tag-door-hardware","product_tag-door-installation","product_tag-doors","product_tag-hanging","product_tag-hardware","product_tag-qaqc","product_tag-quality","product_tag-quality-assurance","product_tag-quality-control","","woocommerce-text-align-left","woocommerce-image-align-center","member-discount","discount-restricted","first","instock","downloadable","virtual","sold-individually","purchasable","product-type-simple"],"_links":{"self":[{"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/product\/91108","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/types\/product"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/comments?post=91108"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/media\/91111"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/media?parent=91108"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/product_brand?post=91108"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/product_cat?post=91108"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/product_tag?post=91108"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}