{"id":1900,"count":17,"description":"<strong>Work permit formats<\/strong> and permit to work templates for controlling high-risk tasks on construction sites. Use them to authorize, brief and close out work such as hot work, excavation, scaffolding, crane setup and lifting, elevated platforms and after-hours work, with clear sign-offs for supervisors, safety officers and the crews doing the work.","link":"https:\/\/essential.construction\/files\/construction\/safety\/work-permits\/","name":"Work Permits","slug":"work-permits","taxonomy":"product_cat","parent":38,"meta":{"ec_bottom_content":"<h2>What's in the work permits collection<\/h2><p>A permit to work is a written system that confirms a specific job, in a specific place and time, has been assessed and that the controls are in place before work starts. A general permit covers routine but hazardous tasks; task-specific permits add checks for one hazard, such as fire watch and combustible clearance for hot work, or ground conditions, lift plans and exclusion zones for cranes.<\/p><h2>How a permit to work is used<\/h2><ol><li><strong>Request<\/strong>: the supervisor describes the task, location, duration and crew.<\/li><li><strong>Assess<\/strong>: hazards and controls are listed, referring to the job hazard analysis.<\/li><li><strong>Authorize<\/strong>: an authorized person checks the controls on site and signs.<\/li><li><strong>Brief and display<\/strong>: the crew is briefed and the permit is kept at the work location.<\/li><li><strong>Close out<\/strong>: the area is made safe, the permit is signed off and filed.<\/li><\/ol><h2>Popular work permit templates<\/h2><ul><li><a href=\"https:\/\/essential.construction\/files\/construction\/safety\/work-permits\/permit-to-work-form\/\">Permit to Work Form<\/a>: a general permit for hazardous tasks.<\/li><li><a href=\"https:\/\/essential.construction\/files\/construction\/safety\/work-permit-hot-work\/\">Work Permit - Hot Work<\/a>: welding, cutting and grinding.<\/li><li><a href=\"https:\/\/essential.construction\/files\/construction\/safety\/work-permit-excavation\/\">Work Permit - Excavation<\/a>: digging near services and trench work.<\/li><li><a href=\"https:\/\/essential.construction\/files\/construction\/safety\/work-permit-confined-space\/\">Work Permit - Confined Space<\/a>: entry into tanks, pits and vaults.<\/li><li><a href=\"https:\/\/essential.construction\/files\/construction\/safety\/work-permit-scaffolding-critical-work\/\">Work Permit - Scaffolding (Critical Work)<\/a>: erecting and altering scaffolds.<\/li><li><a href=\"https:\/\/essential.construction\/files\/construction\/safety\/work-permit-mobile-crane-setup\/\">Work Permit - Mobile Crane Setup<\/a>: outriggers, ground bearing and setup checks.<\/li><li><a href=\"https:\/\/essential.construction\/files\/construction\/safety\/work-permits\/critical-lift-permit\/\">Critical Lift Permit<\/a>: authorize lifts that need extra planning.<\/li><li><a href=\"https:\/\/essential.construction\/files\/construction\/safety\/work-permits\/after-hours-work-permit\/\">After Hours Work Permit<\/a>: approve work outside normal site hours.<\/li><\/ul><h2>Related categories and guides<\/h2><p>Permits work alongside the hazard assessments in <a href=\"https:\/\/essential.construction\/files\/construction\/safety\/\">Safety<\/a>, the equipment checks in <a href=\"https:\/\/essential.construction\/files\/construction\/safety\/inspections\/\">Inspections<\/a> and crew briefings from <a href=\"https:\/\/essential.construction\/files\/construction\/safety\/toolbox-talks\/\">Toolbox Talks<\/a>. Read <a href=\"https:\/\/essential.construction\/academy\/tutorials\/how-to-plan-your-next-construction-crane-lift\/\">How To Plan Your Next Construction Crane Lift<\/a>.<\/p><h2>Frequently asked questions<\/h2><h3>Is a work permit the same as a permit to work?<\/h3><p>On construction sites the terms are used interchangeably for a written authorization to carry out hazardous work. Note that 'work permit' can also mean government employment authorization; the templates here are jobsite safety permits.<\/p><h3>Who can issue a permit to work?<\/h3><p>Only a person authorized under your site or company permit system, usually a supervisor or safety officer who understands the hazards and has checked the controls in the field. The permit holder and the issuer both sign before work starts.<\/p><h3>How long is a permit to work valid?<\/h3><p>Usually for a set period such as one shift, as written on the permit. If conditions change, the scope changes or the work stops and restarts, the permit should be reviewed and reissued.<\/p><h3>When do I need a hot work permit?<\/h3><p>Hot work such as welding, cutting and grinding is one of the most common permit-controlled activities. Your site rules, client, insurer or local fire code may require one, so check those requirements before work begins.<\/p>"},"menu_order":15,"_links":{"self":[{"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/product_cat\/1900","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/product_cat"}],"about":[{"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/taxonomies\/product_cat"}],"up":[{"embeddable":true,"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/product_cat\/38"}],"wp:post_type":[{"href":"https:\/\/essential.construction\/files\/wp-json\/wp\/v2\/product?product_cat=1900"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}