{"id":13263,"date":"2023-02-17T17:31:12","date_gmt":"2023-02-18T01:31:12","guid":{"rendered":"https:\/\/essential.construction\/news\/ottawa-insists-lrt-is-safe-despite-safety-board-saying-wheel-hub-issues-not-fixed\/"},"modified":"2023-02-17T17:31:13","modified_gmt":"2023-02-18T01:31:13","slug":"ottawa-insists-lrt-is-safe-despite-safety-board-saying-wheel-hub-issues-not-fixed","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/ottawa-insists-lrt-is-safe-despite-safety-board-saying-wheel-hub-issues-not-fixed\/","title":{"rendered":"Ottawa insists LRT is safe despite safety board saying wheel hub issues not fixed"},"content":{"rendered":"<p> <a href=\"https:\/\/essential.construction\/files\/membership-default-internal\/\" class=\"memberhide\"><img decoding=\"async\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/01\/20220718_175041000_iOS.jpg\" alt=\"-\"><\/a><br\/><br \/>\n<\/p>\n<div>\n<p>OTTAWA \u2014 Ottawa transit officials say the city\u2019s beleaguered light-rail system is safe even though concerns were raised earlier this month by the Transportation Safety Board.<\/p>\n<p>The safety board said on Feb. 3 that the problems that caused a train derailment in 2021 and an axle wheel hub failure last summer haven\u2019t been resolved and still pose a safety risk.<\/p>\n<p>Vincenzo De Angelis, the board\u2019s director of investigations, said the cause of the derailment was the failure of the cartridge assemblies which contain the bearings and where the wheels attach. He said that it was likely due to the design of the Alstom Citadis Spirit vehicle, the type of train developed specifically for Ottawa\u2019s light rail system.<\/p>\n<p>\u201cThese cartridge assembly failures continue to pose a risk to safety until the issues are resolved,\u201d wrote De Angelis.<\/p>\n<p>At Thursday\u2019s inaugural LRT subcommittee meeting, Ottawa transit services manager Renee Amilcar told reporters that there are mitigation strategies in place to manage the risk.<\/p>\n<p>\u201cIt\u2019s safe to take the train,\u201d said Amilcar.<\/p>\n<p>In a memo sent this week Amilcar said OC Transpo and the Rideau Transit Group have met with the safety board since the Feb. 3 letter to discuss the safety of the train and next steps.<\/p>\n<p>She said Rideau Transit Maintenance does a daily inspection before the launch of every vehicle, and the axles are inspected every 7,500 kilometres. They are replaced every 175,000 kilometres. The parts are supposed to last 1.2 million km.<\/p>\n<p>City Coun. Shawn Menard said at Thursday\u2019s meeting that what\u2019s needed is a permanent fix to the system\u2019s long-term issues.<\/p>\n<p>\u201cAt the end of the day, it\u2019s beyond just maintenance,\u201d he said. \u201cIt\u2019s infrastructure issues. And we heard today that there\u2019s going to be changes to track and trains it seems like in the future.\u201d<\/p>\n<p>\u201cIt\u2019s time to get to the bottom of why that\u2019s occurring, fix those issues and exercise our rights in the project agreements around maintenance and around infrastructure that\u2019s been built for this city.\u201d<\/p>\n<p>Ottawa\u2019s light-rail system, which began operating along a single 12.5 km line with 13 stations in 2019, has been riddled with problems from day one, including doors that wouldn\u2019t close properly, wheels that became flat after use, and a frustrating inconsistency operating in winter weather.<\/p>\n<p>A public inquiry called to look into how the $2.1-billion project has gone so off the rails uncovered a litany of issues, including that the city chose an unproven technology that strained the limits of what light-rail systems can usually do.<\/p>\n<p>The inquiry produced more than 100 recommendations last fall. All but eight are on the city to implement.<\/p>\n<p>But the city has yet to show how it plans to do that and is already well into the\u00a0construction\u00a0of the second stage of the system, adding 44 km and 24 more stations, including a new north-south line that will go to Ottawa\u2019s main airport.<\/p>\n<p>Amilcar said an update on the city\u2019s plan to respond to the recommendations will be ready before the next LRT committee meeting.<\/p>\n<p>One recommendation was to rip up the tracks if needed, to provide a better system. As stage 2\u00a0construction\u00a0continues city staff say they see no reason to do that just yet. But they also say they have not completely ruled it out or the idea of getting new trains, even though they\u2019ve already received 72 vehicles for stage 2.<\/p>\n<p>Richard Holder, the city\u2019s director of engineering services, said Thursday that before making concrete plans to strengthen stage 2, an analysis is being done by Rideau Transit Group, the consortium contracted to design, build and maintain the system.<\/p>\n<p>He said as soon as that analysis identifies problems, corrections will be made both to the tracks and vehicles as needed.<\/p>\n<p style=\"text-align: center;\"><strong>\u00a9 2023 The Canadian Press<\/strong><\/p>\n<\/p><\/div>\n<p><script async src=\"https:\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js?client=ca-pub-5143531171910809\"\r\n     crossorigin=\"anonymous\"><\/script>\r\n<!-- News - Bottom -->\r\n<ins class=\"adsbygoogle\"\r\n     style=\"display:block\"\r\n     data-ad-client=\"ca-pub-5143531171910809\"\r\n     data-ad-slot=\"8320848692\"\r\n     data-ad-format=\"auto\"\r\n     data-full-width-responsive=\"true\"><\/ins>\r\n<script>\r\n     (adsbygoogle = window.adsbygoogle || []).push({});\r\n<\/script><br \/>\n<br \/><a href=\"https:\/\/canada.constructconnect.com\/dcn\/news\/ohs\/2023\/02\/ottawa-insists-lrt-is-safe-despite-safety-board-saying-wheel-hub-issues-not-fixed\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>OTTAWA \u2014 Ottawa transit officials say the city\u2019s beleaguered light-rail system is safe even though concerns were raised earlier this &#8230; <a title=\"Ottawa insists LRT is safe despite safety board saying wheel hub issues not fixed\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/ottawa-insists-lrt-is-safe-despite-safety-board-saying-wheel-hub-issues-not-fixed\/\" aria-label=\"Read more about Ottawa insists LRT is safe despite safety board saying wheel hub issues not fixed\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1037],"tags":[357,295],"class_list":["post-13263","post","type-post","status-publish","format-standard","hentry","category-daily-commercial-news","tag-blog","tag-technology","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/13263","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=13263"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/13263\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=13263"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=13263"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=13263"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}