{"id":13597,"date":"2023-02-27T06:12:28","date_gmt":"2023-02-27T14:12:28","guid":{"rendered":"https:\/\/essential.construction\/news\/green-light-for-140m-leeds-build-to-rent-project\/"},"modified":"2023-02-27T06:12:32","modified_gmt":"2023-02-27T14:12:32","slug":"green-light-for-140m-leeds-build-to-rent-project","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/green-light-for-140m-leeds-build-to-rent-project\/","title":{"rendered":"Green light for \u00a3140m Leeds build to rent project"},"content":{"rendered":"<p> <a href=\"https:\/\/essential.construction\/files\/membership-default-internal\/\" class=\"memberhide\"><img decoding=\"async\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/01\/20220718_175041000_iOS.jpg\" alt=\"-\"><\/a><br\/><br \/>\n<\/p>\n<div>\n<p>Located on the bank of River Aire, over half of the 5.1-acre site will be allocated for public open space including a new riverside park.<\/p>\n<p>The homes will be set across five brick-clad buildings which complement the existing riverside.<\/p>\n<div id=\"attachment_472289\" class=\"wp-caption alignnone\"><a rel=\"nofollow\" href=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/02\/Screenshot-2023-02-27-at-08.34.10.png\"><\/a><\/p>\n<p class=\"wp-caption-text\">Mid-rise buildings are designed with colonnaded walkways along defined groundfloor levels<\/p>\n<\/div>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a rel=\"nofollow noopener\" data-ad-id=\"163817\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=http%3A%2F%2Fwww.constructionenquirer.com%2Fdirectory%2F%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/01\/enquirer_directory_mpu.gif\" alt=\"-\"><\/a><\/div>\n<\/div>\n<p>Designed by Carey Jones Chapman Tolcher, the development will include more than 10,000 sq ft of amenity space including a residents\u2019 lounge, a co-working hub and gym, 3,800 sq ft of commercial space and 6,000 sq ft of private external terraces.<\/p>\n<div id=\"attachment_472283\" class=\"wp-caption alignnone\"><a rel=\"nofollow\" href=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/02\/FINAL_East_Along_Riverside-Walk-003-copy-002.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-472283 size-full\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/02\/FINAL_East_Along_Riverside-Walk-003-copy-002.jpg\" alt=\"-\" width=\"1773\" height=\"998\"><\/a><\/p>\n<p class=\"wp-caption-text\">Scheme will be built on the site of the former Arla food depot<\/p>\n<\/div>\n<p>Daniel Roberts, Senior Development Manager at Glenbrook, said: \u201cWe identified this prominent former brownfield site as having huge potential and achieving planning will enable us to deliver a highly sustainable scheme which will act as a catalyst for the wider regeneration of Kirkstall Road.<\/p>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a rel=\"nofollow noopener\" data-ad-id=\"124710\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fwww.coffeygroup.com%2Fcareers%2F\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/02\/HR Coffey MPU.jpg\" alt=\"-\"><\/a><\/div>\n<\/div>\n<p>\u201cWith planning now secured, we will be looking to commence work on site later this year.\u201d<\/p>\n<p>The project team includes Avison Young (planning), Curtins (structural), Abacus (costs), Crookes Walker Consulting (MEP).<\/p>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a rel=\"nofollow noopener\" data-ad-id=\"95499\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fcisrs.org.uk%2F%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/02\/CE_CISRS-MPU_23.gif\" alt=\"-\"><\/a><\/div>\n<\/div>\n<div class=\"ad-mpu ad-mpu-inline\">\n<div class=\"sleeve\"><a rel=\"nofollow noopener\" data-ad-id=\"461815\" href=\"http:\/\/www.constructionenquirer.com\/wp-content\/themes\/constructionenquirer\/adclick.php?url=https%3A%2F%2Fawards.ciob.org%2F%3Futm_source%3Dconstruction-enquirer%26utm_medium%3Dbanner%26utm_campaign%3Dconstructionenq-ads\" target=\"_blank\" onclick=\"track_ad_click(this);\"><img decoding=\"async\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/02\/2508COB_Awards2023_MPU_v1.gif\" alt=\"-\"><\/a><\/div>\n<\/div>\n<p>\u00a0<\/p>\n<\/p><\/div>\n<p><script async src=\"https:\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js?client=ca-pub-5143531171910809\"\r\n     crossorigin=\"anonymous\"><\/script>\r\n<!-- News - Bottom -->\r\n<ins class=\"adsbygoogle\"\r\n     style=\"display:block\"\r\n     data-ad-client=\"ca-pub-5143531171910809\"\r\n     data-ad-slot=\"8320848692\"\r\n     data-ad-format=\"auto\"\r\n     data-full-width-responsive=\"true\"><\/ins>\r\n<script>\r\n     (adsbygoogle = window.adsbygoogle || []).push({});\r\n<\/script><br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2023\/02\/27\/green-light-for-140m-leeds-build-to-rent-project\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Located on the bank of River Aire, over half of the 5.1-acre site will be allocated for public open space &#8230; <a title=\"Green light for \u00a3140m Leeds build to rent project\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/green-light-for-140m-leeds-build-to-rent-project\/\" aria-label=\"Read more about Green light for \u00a3140m Leeds build to rent project\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-13597","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/13597","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=13597"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/13597\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=13597"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=13597"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=13597"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}