{"id":13679,"date":"2023-03-01T11:47:38","date_gmt":"2023-03-01T19:47:38","guid":{"rendered":"https:\/\/essential.construction\/news\/smartpm-launches-automated-narrative-reporting-for-construction-analytics-platform\/"},"modified":"2023-03-01T11:47:39","modified_gmt":"2023-03-01T19:47:39","slug":"smartpm-launches-automated-narrative-reporting-for-construction-analytics-platform","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/smartpm-launches-automated-narrative-reporting-for-construction-analytics-platform\/","title":{"rendered":"SmartPM Launches Automated Narrative Reporting for Construction Analytics Platform"},"content":{"rendered":"<p> <a href=\"https:\/\/essential.construction\/files\/membership-default-internal\/\" class=\"memberhide\"><img decoding=\"async\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/01\/20220718_175041000_iOS.jpg\" alt=\"-\"><\/a><br\/><br \/>\n<\/p>\n<div wp_automatic_readability=\"98\">\n<div class=\"td-featured-image-rec\">\n<div class=\"td-post-featured-image\"><a rel=\"nofollow\" href=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/03\/Construction-Bidding-Software.jpg\" data-caption=\"\"><\/a><\/div>\n<\/p><\/div>\n<p>SmartPM scans through all the schedule data, analyzes it, then automatically produces the results in text format by automatically filling in the fields of an internal template with standardized text, customized with the project\u2019s unique numbers.<\/p>\n<p>SmartPM Technologies, a construction project analytics provider, has added an automated narrative report feature to its platform. The program automatically generates a narrative based on the schedule data set.<\/p>\n<p>The report is a text-based summary of multiple aspects of a construction job. It is designed for stakeholders involved in a project, as well as construction executives who want information about a project\u2019s status but don\u2019t have the time or expertise to decipher charts and graphs.<\/p>\n<p>Construction companies and contractors traditionally provide their clients \u2013 generally the building developer or owner \u2013 with a text-based, monthly (or other frequency) update on how the project is progressing, any issues or concerns, potential bottlenecks, etc. While the report will incorporate information about safety issues, outstanding RFI\u2019s and other subjective material, it is the schedule data that provides the majority of insights for various audiences.<\/p>\n<p>SmartPM scans through all the schedule data, analyzes it, then automatically produces the results in text format by automatically filling in the fields of an internal template with standardized text, customized with the project\u2019s unique numbers. The report pulls from a wide spectrum of schedule data, including schedule quality, performance (plan vs. actual), critical path analysis, milestones, compression and more.<\/p>\n<p>As project updates are added into SmartPM, the program pulls in those new parameters and incorporates them into the narrative. Regardless of the frequency with which these reports are produced, as long as the program is being updated with the most current information, the report will present an up-to-date snapshot of the project.<\/p>\n<p>\u201cThis more or less goes back to the original goal for the SmartPM platform: to take the most complicated data set in the construction field \u2013 the schedule \u2013and present it at a level that anyone can understand,\u201d said Michael Pink, CEO of SmartPM. \u201cThe platform can still provide the \u2018deep dive\u2019 statistics, charts, and graphs, that some people require. But the report is an incredibly useful tool for the executive who wants that same information in an easier-to-digest, narrative format.\u201d<\/p>\n<p>\u201cIn the future, as we pull in new data sets and overlay them with the schedule data, we\u2019ll be able to push that information back out to the narrative to make it even more comprehensive \u2013 and far more insightful,\u201d said Pink.<\/p>\n<p><!---- Article PDF link download -----><\/p>\n<p><!---- End Article PDF link download -----><br \/>\n<!--- White Paper--><br \/>\n<!-- End Whitepaper -->\n<\/div>\n<p><script async src=\"https:\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js?client=ca-pub-5143531171910809\"\r\n     crossorigin=\"anonymous\"><\/script>\r\n<!-- News - Bottom -->\r\n<ins class=\"adsbygoogle\"\r\n     style=\"display:block\"\r\n     data-ad-client=\"ca-pub-5143531171910809\"\r\n     data-ad-slot=\"8320848692\"\r\n     data-ad-format=\"auto\"\r\n     data-full-width-responsive=\"true\"><\/ins>\r\n<script>\r\n     (adsbygoogle = window.adsbygoogle || []).push({});\r\n<\/script><br \/>\n<br \/><a href=\"https:\/\/www.worldconstructiontoday.com\/pressreleases\/smartpm-launches-automated-narrative-reporting-for-construction-analytics-platform\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>SmartPM scans through all the schedule data, analyzes it, then automatically produces the results in text format by automatically filling &#8230; <a title=\"SmartPM Launches Automated Narrative Reporting for Construction Analytics Platform\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/smartpm-launches-automated-narrative-reporting-for-construction-analytics-platform\/\" aria-label=\"Read more about SmartPM Launches Automated Narrative Reporting for Construction Analytics Platform\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[461],"tags":[],"class_list":["post-13679","post","type-post","status-publish","format-standard","hentry","category-world-construction-today","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/13679","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=13679"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/13679\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=13679"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=13679"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=13679"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}