{"id":14806,"date":"2023-03-29T05:20:48","date_gmt":"2023-03-29T12:20:48","guid":{"rendered":"https:\/\/essential.construction\/news\/midtown-resubmission-triples-proposed-building-size\/"},"modified":"2023-03-29T05:20:48","modified_gmt":"2023-03-29T12:20:48","slug":"midtown-resubmission-triples-proposed-building-size","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/midtown-resubmission-triples-proposed-building-size\/","title":{"rendered":"Midtown Resubmission Triples Proposed Building Size"},"content":{"rendered":"<p> <a href=\"https:\/\/essential.construction\/files\/membership-default-internal\/\" class=\"memberhide\"><img decoding=\"async\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/01\/20220718_175041000_iOS.jpg\" alt=\"-\"><\/a><br\/><br \/>\n<\/p>\n<div id=\"article_body\">\n<p>The coming of Eglinton Line 5 \u2014 whenever it finally opens in the coming year \u2014 is helping to intensify development in Toronto\u2019s Midtown area. Walking distance to Mount Pleasant, one of the new Line 5 stations, one proposal has seen a massive transformation now that its site has been declared to be within a PMTSA. Protected Major Transit Stations Areas, or PMTSAs, are a new tool the City has adopted following Provincial legislation that sets out minimum densities in a 500m to 800m radius of a station, and which allows the City to impose affordable housing unit percentages in new developments within that area.<\/p>\n<p>In that regard, following an earlier rezoning application submitted in 2021, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/goodmans-llp.44110\" target=\"_blank\">Goodmans LLP<\/a> has resubmitted an application on behalf of the landowner for <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/136-broadway.46750\" target=\"_blank\">136 Broadway Avenue<\/a>\u00a0that reflects the new expectations of the City for developments within a 10-minute walk of a major transit station.<\/p>\n<p><imgx alt=\"136 Broadway, Toronto, designed by IBI Group for Reserve Properties\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-83dcdd0b-9fc0-46b5-a15c-8c25503856db\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/03\/51796\/51796-155758.jpeg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/03\/51796\/51796-155758.jpeg', true, ''); return false;\" title=\"Looking northeast to 136 Broadway, designed by IBI Group for Reserve Properties\"\/><span class=\"image-description\">Looking northeast to 136 Broadway, designed by IBI Group for Reserve Properties<\/span><\/p>\n<p>Located just west of the intersection of Mount Pleasant Road and Broadway Avenue, there is currently a 1962-built six-storey apartment building at the site. The application includes a Heritage Impact Statement concluding that demolishing the building would not result in lost cultural heritage value. The surrounding neighbourhood has seen plenty of such intensification and development applications, with this resubmission aiming to be in line with that growth.<\/p>\n<p>In 2021, the proposal from developer <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/news\/2023\/03\/Reserve%20Properties\" target=\"_blank\">Reserve Properties<\/a> called for a 12-storey building with 111 residential units. The revised proposal roughly triples these numbers, with a 35-storey building and 366 units, standing at 116.85m. With three elevators included in the architectural plans, that would mean one elevator for every 122 units, just one more elevator than was planned in the 111-unit version, and somewhat higher than the threshold of one elevator for every 100 units.<\/p>\n<p><imgx alt=\"The previous design for 136 Broadway, Toronto, designed by IBI Group for Reserve Properties\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-f09df661-ba4a-49a6-92c9-8e0f8651b989\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/03\/51796\/51796-155759.jpeg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/03\/51796\/51796-155759.jpeg', true, ''); return false;\" title=\"Looking northeast to the previous design for 136 Broadview, designed by IBI Group for Reserve Properties\"\/><span class=\"image-description\">Looking northeast to the previous design for 136 Broadview, designed by IBI Group for Reserve Properties<\/span><\/p>\n<p>These changes have meant a significant revision in the design by <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/ibi-group.8006\" target=\"_blank\">IBI Group<\/a>, with the proposed gross floor area jumping from 8,061m\u00b2 to 21,967m\u00b2. The revisions are primarily aimed at making more efficient use of the land as part of the PMTSA within an \u201cUrban Growth Centre.&#8221; The proposal notes reviews showing how the site can accommodate greater height and density. At the same time, the resubmission is massed to try to limit shadow impacts on nearby buildings.<\/p>\n<p>The design has revised the podium from five storeys to four, allowing for a much larger tower element of 31 storeys. At grade, there would be a larger POPS (Privately-Owned Publicly accessible Space), increasing in depth from 5.54m to 7.50m along the frontage of the site. The proposed combined amenity space in the proposal is more than doubled, from 444m\u00b2 to 1,098m\u00b2, with much of that being the 732m\u00b2 of indoor amenities.<\/p>\n<p><imgx alt=\"136 Broadview Avenue, image retrieved from Google Street View\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-916b0149-ea21-444d-a6c6-05d29e754329\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/03\/51796\/51796-155760.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/03\/51796\/51796-155760.jpg', true, ''); return false;\" title=\"Looking north to the existing building on the site, image retrieved from Google Street View\"\/><span class=\"image-description\">Looking north to the existing building on the site, image retrieved from Google Street View<\/span><\/p>\n<p>Two levels of underground parking also see more parking spaces in the resubmission, going from 19 to 42. However, the resubmission does away with short-term and car-share parking, with the proposal noting that 124 Broadway Avenue \u2014 another Reserve Properties site just to the west, significantly larger \u2014 is to provide short-term parking. Meanwhile, bicycle spots would more than triple from 111 to 367, with 330 of them long-term spots for residents.<\/p>\n<p><imgx alt=\"Aerial view of 136 Broadview Avenue and Midtown Toronto, image retrieved from Google Maps\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-52c8c74d-fa5a-44f9-b491-649ba457beb9\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/03\/51796\/51796-155761.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/03\/51796\/51796-155761.jpg', true, ''); return false;\" title=\"An aerial view of the site and surrounding area, image retrieved from Google Maps\"\/><span class=\"image-description\">An aerial view of the site and surrounding area, image retrieved from Google Maps<\/span><\/p>\n<p>As mentioned, the major factor in these changes is the present and future transportation for the area. The site is already well-served by transit options, being about 750m from Eglinton subway station and within 550m of multiple bus stops along Mount Pleasant Road and Eglinton Avenue. Cyclists have limited access to trails and bike lanes, but Bike Share Toronto offers short-term rentals for the area, and the site is 1.5km away from the Kay Gardiner Beltline Trail.<\/p>\n<p>The neighbourhood\u2019s evolving transportation is highlighted by the imminent (but undated) opening of Eglinton Line 5. The light rail transit service in its initial phase is to have 25 stations and surface stops along its 19km stretch across Toronto from Weston Road to Kennedy Station. The station at Mount Pleasant Road is just 400m from this site.<\/p>\n<p><imgx alt=\"An aerial view of 136 Broadview Avenue and surrounding TTC routes, image from submission to City of Toronto\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-f4cfe8d2-f41e-4660-9af7-f54b25c05638\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/03\/51796\/51796-155769.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/03\/51796\/51796-155769.jpg', true, ''); return false;\" title=\"An aerial view of the site and surrounding transit options, image from submission to City of Toronto\"\/><span class=\"image-description\">An aerial view of the site and surrounding transit options, image from submission to City of Toronto<\/span><\/p>\n<p>Looking further ahead, while the crowded Yonge Line 1 subway is to be extended north into York Region and attract yet more riders, the coming Ontario Line 3 is meant to open first and take some of the pressure off of Line 1, diverting those headed downtown from east of Don Mills Road to the new Line 3. Cyclists can look forward to better routes too, with the City\u2019s Cycling Network 10 Year Plan in place to improve cycling infrastructure for the neighbourhood and throughout Toronto.<\/p>\n<p>With a massive increase in size and density, this resubmission looks to capitalize on a heavily developing neighbourhood and increasingly connected city, while reflecting the City&#8217;s desire to bring more density close to higher order transit.<\/p>\n<p>UrbanToronto will continue to follow progress on this development, but in the meantime, you can learn more about it from our Database file, linked below. If you&#8217;d like, you can join in on the conversation in the associated Project Forum thread or leave a comment in the space provided on this page.<\/p>\n<p style=\"text-align: center;\">* * *<\/p>\n<p>UrbanToronto has a research service,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/Pro\/\" target=\"_blank\">UrbanToronto Pro<\/a>, that provides comprehensive data on construction projects in the Greater Toronto Area\u2014from proposal through to completion. We also offer\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/reports\/\" target=\"_blank\">Instant\u00a0Reports<\/a>, downloadable snapshots based on location, and a daily subscription newsletter,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\">New Development Insider<\/a>, that tracks projects from initial application.<\/p>\n<\/div>\n<p><script>\n!function(f,b,e,v,n,t,s){if(f.fbq)return;n=f.fbq=function(){n.callMethod?\nn.callMethod.apply(n,arguments):n.queue.push(arguments)};if(!f._fbq)f._fbq=n;\nn.push=n;n.loaded=!0;n.version='2.0';n.queue=[];t=b.createElement(e);t.async=!0;\nt.src=v;s=b.getElementsByTagName(e)[0];s.parentNode.insertBefore(t,s)}(window,\ndocument,'script','\/\/connect.facebook.net\/en_US\/fbevents.js');\nfbq('init', '1760257484204295');\nfbq('track', \"PageView\");<\/script><br \/>\n<br \/><script async src=\"https:\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js?client=ca-pub-5143531171910809\"\r\n     crossorigin=\"anonymous\"><\/script>\r\n<!-- News - Bottom -->\r\n<ins class=\"adsbygoogle\"\r\n     style=\"display:block\"\r\n     data-ad-client=\"ca-pub-5143531171910809\"\r\n     data-ad-slot=\"8320848692\"\r\n     data-ad-format=\"auto\"\r\n     data-full-width-responsive=\"true\"><\/ins>\r\n<script>\r\n     (adsbygoogle = window.adsbygoogle || []).push({});\r\n<\/script><br \/>\n<br \/><a href=\"https:\/\/urbantoronto.ca\/news\/2023\/03\/midtown-resubmission-triples-proposed-building-size.51796\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The coming of Eglinton Line 5 \u2014 whenever it finally opens in the coming year \u2014 is helping to intensify &#8230; <a title=\"Midtown Resubmission Triples Proposed Building Size\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/midtown-resubmission-triples-proposed-building-size\/\" aria-label=\"Read more about Midtown Resubmission Triples Proposed Building Size\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1088],"tags":[],"class_list":["post-14806","post","type-post","status-publish","format-standard","hentry","category-urban-toronto","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/14806","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=14806"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/14806\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=14806"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=14806"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=14806"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}