{"id":16332,"date":"2023-04-30T03:34:40","date_gmt":"2023-04-30T10:34:40","guid":{"rendered":"https:\/\/essential.construction\/news\/fiec-says-revised-asbestos-directive-proposals-unworkable\/"},"modified":"2023-04-30T03:34:41","modified_gmt":"2023-04-30T10:34:41","slug":"fiec-says-revised-asbestos-directive-proposals-unworkable","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/fiec-says-revised-asbestos-directive-proposals-unworkable\/","title":{"rendered":"FIEC Says Revised Asbestos Directive Proposals Unworkable"},"content":{"rendered":"<p> <a href=\"https:\/\/essential.construction\/files\/membership-default-internal\/\" class=\"memberhide\"><img decoding=\"async\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/01\/20220718_175041000_iOS.jpg\" alt=\"-\"><\/a><br\/><br \/>\n<\/p>\n<div wp_automatic_readability=\"79\">\n<div class=\"td-featured-image-rec\">\n<div class=\"td-post-featured-image\"><a rel=\"nofollow\" href=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/04\/Construction_Asbestos.jpeg\" data-caption=\"\"><\/a><\/div>\n<\/p><\/div>\n<p style=\"text-align: left;\"><span style=\"color: #252525;\">The European Construction Industry Federation- FIEC has renewed its warning that proposals within European Parliament\u2019s revised asbestos directive look unrealistic and will prove costly for construction companies as well as their clients.<\/span><\/p>\n<p style=\"text-align: left;\"><span style=\"color: #252525;\">FIEC issued the statement with the European Parliament\u2019s Employment and Social Affairs Committee and is expected to embrace a report on the directive\u2019s revision.<\/span><\/p>\n<p style=\"text-align: left;\"><span style=\"color: #252525;\">When it comes to the centre of the debate, there is an expectation of lowering the occupational exposure limit value (OEL) by 100 times within 4 years of the refreshed directive coming into existence.<\/span><\/p>\n<p style=\"text-align: left;\"><span style=\"color: #252525;\">That said, FIEC is of the opinion that, according to some estimates, when it comes to the national level, lowering OEL by as much as 10 times over a period of many years has not even trebled but at times even quadrupled the cost of asbestos removal. As per the federation, these additional costs include the adoption of new as well as longer procedures, an elevated protective individual measurement process, the management of waste, as well as environmental and collective equipment.<\/span><\/p>\n<p style=\"text-align: left;\"><span style=\"color: #252525;\">By contrast, these costs do not take into consideration the additional costs implied for labs in order to buy better machines and also upskill the existing staff. Among other worrying elements, it is anticipated that the sporadic and low-intensity exposure concept will be slashed from the directive. This will, in all possibilities, lead to a market structure change, thereby pushing out most of the construction companies from the market that deal with asbestos temporarily, which will prove to be an advantage for the specialised companies.<\/span><\/p>\n<p style=\"text-align: left;\"><span style=\"color: #252525;\">\u00a0Protection when it comes to the health and safety of the workers has always been a top priority for the FIEC\u2019s agenda, and it is not going to be any different this time around. That said, FIEC is extremely anxious that the European Parliament\u2019s proposal may not be realistic at all when it comes to implementation by professionals and also with a risk that too expensive and hard rules will prove to be harmful for the companies as well as their clients so as to work within the legal gamut and for home owners as well when it comes to undertaking renovation works that are expensive.<\/span><\/p>\n<p style=\"text-align: left;\"><span style=\"color: #252525;\">A more realistic process will be sticking to the European Commission\u2019s proposal for an OEL that is lowered to 0.01 fibres\/cu cm, teamed with at least a five-year transition period. It is well to be noted that FIEC represents 32 national member federations across 27 countries and also construction companies of all sizes as well as international players carrying out all kinds of civil engineering and building activities.<\/span><\/p>\n<p><!---- Article PDF link download -----><\/p>\n<p><!---- End Article PDF link download -----><br \/>\n<!--- White Paper--><br \/>\n<!-- End Whitepaper -->\n<\/div>\n<p><script async src=\"https:\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js?client=ca-pub-5143531171910809\"\r\n     crossorigin=\"anonymous\"><\/script>\r\n<!-- News - Bottom -->\r\n<ins class=\"adsbygoogle\"\r\n     style=\"display:block\"\r\n     data-ad-client=\"ca-pub-5143531171910809\"\r\n     data-ad-slot=\"8320848692\"\r\n     data-ad-format=\"auto\"\r\n     data-full-width-responsive=\"true\"><\/ins>\r\n<script>\r\n     (adsbygoogle = window.adsbygoogle || []).push({});\r\n<\/script><br \/>\n<br \/><a href=\"https:\/\/www.worldconstructiontoday.com\/news\/fiec-says-revised-asbestos-directive-proposals-unworkable\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The European Construction Industry Federation- FIEC has renewed its warning that proposals within European Parliament\u2019s revised asbestos directive look unrealistic &#8230; <a title=\"FIEC Says Revised Asbestos Directive Proposals Unworkable\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/fiec-says-revised-asbestos-directive-proposals-unworkable\/\" aria-label=\"Read more about FIEC Says Revised Asbestos Directive Proposals Unworkable\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[461],"tags":[],"class_list":["post-16332","post","type-post","status-publish","format-standard","hentry","category-world-construction-today","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/16332","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=16332"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/16332\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=16332"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=16332"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=16332"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}