{"id":17226,"date":"2023-05-18T23:11:12","date_gmt":"2023-05-19T06:11:12","guid":{"rendered":"https:\/\/essential.construction\/news\/go-ahead-for-major-nottingham-bioscience-project\/"},"modified":"2023-05-18T23:11:18","modified_gmt":"2023-05-19T06:11:18","slug":"go-ahead-for-major-nottingham-bioscience-project","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/go-ahead-for-major-nottingham-bioscience-project\/","title":{"rendered":"Go-ahead for major Nottingham bioscience project"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"post-474933\">\n\t<!-- .entry-header --><\/p>\n<div class=\"entry-content\">\n<p>Two buildings connected at the upper levels by glazed link will provide 245,000 sq ft of laboratory and office space.<\/p>\n<p>Designed by CPMG Architects, the Poplar Street project is subject to the documenting of the section 106 agreement.<\/p>\n<p class=\"r\">Robert Ware, Chief Executive of Conygar, said: \u201cWe are delighted that the next phase of development has been approved.<\/p>\n<p class=\"r\">\u201cNottingham is already home to a large number of exciting businesses in the bioscience space and this scheme will be an excellent addition to the mixed-use development we are creating at The Island Quarter\u201d.<\/p>\n<div id=\"attachment_474946\" class=\"wp-caption aligncenter\"><a rel=\"nofollow\" href=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/05\/Screenshot-2023-05-18-at-11.01.39.png\"><\/a><\/p>\n<p class=\"wp-caption-text\">Two buildings to be linked by glazed walkways<\/p>\n<\/div>\n<p class=\"\"><span class=\"x_x_ContentPasted0 x_x_ContentPasted1 x_ContentPasted0\">The building envelope will consist of a mix of grey brickwork and off-white terracotta fa\u00e7ade modules with gold metal plant screens and entrance surrounds.<\/span><\/p>\n<p class=\"\"><span class=\"x_x_ContentPasted0 x_x_ContentPasted1 x_ContentPasted0\">Meanwhile, clear glazing will be used for circulation spaces and ceramic-backed spandrels for fixed desks and laboratory benching.\u00a0<\/span><\/p>\n<p><span class=\"x_x_ContentPasted0 x_x_ContentPasted1 x_ContentPasted0\">External landscaping has been designed by Studio Egret West to echo the vision for the overall site, incorporating rainwater gardens and medicinal planting along with an ecology-focused street linking this latest phase of work with the rest of The Island Quarter.\u00a0<\/span><span class=\"x_x_ContentPasted0 x_x_ContentPasted1 x_ContentPasted0\">\u00a0\u00a0<\/span><\/p>\n<div><a rel=\"nofollow\" href=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/05\/Screenshot-2023-05-18-at-11.05.41.png\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-474948\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/05\/Screenshot-2023-05-18-at-11.05.41.png\" alt=\"-\" width=\"1322\" height=\"900\"><\/a><\/div>\n<div class=\"\">\n<p>\u00a0<\/p>\n<\/div><\/div>\n<p><!-- .entry-content --><\/p>\n<footer class=\"entry-meta\">\n<div class=\"author-info\">\n<div class=\"sleeve\">\n<div class=\"author-avatar\">\n<div class=\"sleeve\">\n\t\t<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/01\/2.jpg\" alt=\"Aaron Morby\" width=\"150\" height=\"150\" class=\"photo\">\t\t<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p><!-- .author-info -->\t\t\t<\/footer>\n<\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2023\/05\/18\/go-ahead-for-major-nottingham-bioscience-project\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Two buildings connected at the upper levels by glazed link will provide 245,000 sq ft of laboratory and office &#8230; <a title=\"Go-ahead for major Nottingham bioscience project\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/go-ahead-for-major-nottingham-bioscience-project\/\" aria-label=\"Read more about Go-ahead for major Nottingham bioscience project\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-17226","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/17226","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=17226"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/17226\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=17226"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=17226"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=17226"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}