{"id":17921,"date":"2023-06-05T23:58:36","date_gmt":"2023-06-06T06:58:36","guid":{"rendered":"https:\/\/essential.construction\/news\/demolition-deal-awarded-on-chancery-lane-refurb\/"},"modified":"2023-06-05T23:58:38","modified_gmt":"2023-06-06T06:58:38","slug":"demolition-deal-awarded-on-chancery-lane-refurb","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/demolition-deal-awarded-on-chancery-lane-refurb\/","title":{"rendered":"Demolition deal awarded on Chancery Lane refurb"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div id=\"post-475441\">\n\t<!-- .entry-header --><\/p>\n<div class=\"entry-content\">\n<p>Development Manager LS Estates is overseeing the \u00a3200m project for client LKTMJ Limited.<\/p>\n<p>Retrofitting of 5 Chancery Lane will create approximately 100,000 sq ft of modern office space between Holborn and Fleet Street.<\/p>\n<p>The retrofit scheme has been designed by Foggo Associates and includes the demolition of the existing top floor and the incorporation of two new floors using a CLT (Cross-Laminated Timber) structure.<\/p>\n<p>The demolition phase of work begins this month with completion in November 2023.<\/p>\n<\/p><\/div>\n<p><!-- .entry-content --><\/p>\n<footer class=\"entry-meta\">\n<div class=\"author-info\">\n<div class=\"sleeve\">\n<div class=\"author-avatar\">\n<div class=\"sleeve\">\n\t\t\t\t<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p><!-- .author-info -->\t\t\t<\/footer>\n<\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2023\/06\/06\/demolition-deal-awarded-on-chancery-lane-refurb\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Development Manager LS Estates is overseeing the \u00a3200m project for client LKTMJ Limited. Retrofitting of 5 Chancery Lane will &#8230; <a title=\"Demolition deal awarded on Chancery Lane refurb\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/demolition-deal-awarded-on-chancery-lane-refurb\/\" aria-label=\"Read more about Demolition deal awarded on Chancery Lane refurb\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":17922,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-17921","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/17921","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=17921"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/17921\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media\/17922"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=17921"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=17921"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=17921"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}