{"id":18237,"date":"2023-06-14T20:30:20","date_gmt":"2023-06-15T03:30:20","guid":{"rendered":"https:\/\/essential.construction\/news\/peel-memorial-hospital-phase-2-moving-forward-in-brampton\/"},"modified":"2023-06-14T20:30:22","modified_gmt":"2023-06-15T03:30:22","slug":"peel-memorial-hospital-phase-2-moving-forward-in-brampton","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/peel-memorial-hospital-phase-2-moving-forward-in-brampton\/","title":{"rendered":"Peel Memorial Hospital Phase 2 Moving Forward in Brampton"},"content":{"rendered":"<p> <a href=\"https:\/\/essential.construction\/files\/membership-default-internal\/\" class=\"memberhide\"><img decoding=\"async\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/01\/20220718_175041000_iOS.jpg\" alt=\"-\"><\/a><br\/><br \/>\n<\/p>\n<div id=\"article_body\">\n<p>As the cityscape of the Greater Toronto Area continues to evolve, so too does its healthcare infrastructure. A mounting healthcare crisis is evident throughout the country \u2013 and particularly in Brampton, with <a rel=\"nofollow noopener\" href=\"https:\/\/www.bramptonguardian.com\/news\/beyond-frustrating-peel-resident-doctor-says-family-physician-shortage-is-a-crisis\/article_4815491c-1e76-587c-b319-6417ad4e78b6.html\" target=\"_blank\">staffing shortages<\/a> causing significant strain. Now, the Peel Memorial Health Centre is set to undergo a transformative expansion with the unveiling of its <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/peel-memorial-hospital-phase-2.52849\" target=\"_blank\">Phase 2<\/a> development. Architect <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/hok.8114\" target=\"_blank\">HOK<\/a> has submitted a Site Plan Approval on behalf of PPP developer <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/plenary-health.7795\" target=\"_blank\">Plenary Health<\/a> for the site.<\/p>\n<p><imgx alt=\"Peel Memorial Hospital Phase 2, designed by HOK for Plenary Health\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-211f1184-633b-479b-9065-4d3c9b7f7d79\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/06\/52910\/52910-159065.jpeg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/06\/52910\/52910-159065.jpeg', true, ''); return false;\" title=\"Looking north to Peel Memorial Hospital Phase 2, designed by HOK for Plenary Health\"\/><span class=\"image-description\">Looking north to Peel Memorial Hospital Phase 2, designed by HOK for Plenary Health<\/span><\/p>\n<p>The site is located at 20 Lynch Street, about 250m south of Queen Street East, about midway between Kennedy Road South and Main Street South, with Centre Street South just to the west and Trueman Street to the east. Peel Memorial&#8217;s Phase 1 building, which was also built through a Design, Build, Finance, Maintain model\u00a0with Plenary Health,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/news\/2015\/07\/peel-memorial-health-centre-tops-brampton.16843\" target=\"_blank\">opened in 2015<\/a> and is situated immediately south of the Phase 2 site. It takes outpatients only, and is<meta charset=\"UTF-8\"\/>\u00a0part of the William Osler Health System which also includes Brampton Civic Hospital and Etobicoke General Hospital.<\/p>\n<p>The previous Peel Memorial Hospital stood on this site until 2012 when it was demolished. The earlier building was a 367-bed acute care hospital, but its functions were transferred to Brampton Civic Hospital when that 608-bed acute care facility opened in 2007. Brampton Civic Hospital quickly reached capacity once it opened and the growing city has been strained for hospital bed space aver since, an issue that the Phase 1 Peel Memorial building did not address.<\/p>\n<p><imgx alt=\"An aerial view of Peel Memorial Hospital Phase 2, designed by HOK for Plenary Health\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-31788536-20cf-4401-bb9a-3b361d599ca3\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/06\/52910\/52910-159069.jpeg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/06\/52910\/52910-159069.jpeg', true, ''); return false;\" title=\"An aerial view of Peel Memorial Hospital Phase 2, designed by HOK for Plenary Health\"\/><span class=\"image-description\">An aerial view of Peel Memorial Hospital Phase 2, designed by HOK for Plenary Health<\/span><\/p>\n<p>Phase 2 is designed to stand 12 storeys at 73.14m, with a total gross floor area of 67,735m\u00b2. The main entrance, located on the eastern side on the Lynch Street Extension, is complemented by additional entrances on the northern and southern sides, ensuring easy access for all.<\/p>\n<p><imgx alt=\"Looking north from Lynch Street to Peel Memorial Hospital Phase 2, image retrieved from Google Street View\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-3968bbc3-fef5-433d-a897-e974e8537e5c\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/06\/52910\/52910-159077.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/06\/52910\/52910-159077.jpg', true, ''); return false;\" title=\"Looking north from Lynch Street to the site, image retrieved from Google Street View\"\/><span class=\"image-description\">Looking north from Lynch Street to the site, image retrieved from Google Street View<\/span><\/p>\n<p>Phase 2 aims to help with Brampton&#8217;s healthcare space struggles with 154 inpatient beds at opening, plus two shelled floors capable of hosting 96 post-acute beds to be kitted out at a future point. Innovative technologies would include units for Complex Continuing Care and Rehabilitation, Mental Health Post-Acute <a rel=\"nofollow noopener\" href=\"https:\/\/www.camh.ca\/en\/health-info\/mental-illness-and-addiction-index\/concurrent-disorders\" target=\"_blank\">Concurrent Disorders<\/a>, and Seniors Cognitive Rehabilitation, and more.<\/p>\n<p>The building&#8217;s form and massing have been thoughtfully designed to accommodate these diverse functions. Climate change has been taken into account with a climate risk and resilience assessment (CRRA). There would be optimized daylight access for patients, outdoor spaces including therapy gardens, and a flexible building design in order to anticipate and adapt to future changes.<\/p>\n<p><imgx alt=\"Peel Memorial Hospital Phase 2, designed by HOK for Plenary Health\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-0ea970e5-d4df-4292-b0dc-7a5cb44fe911\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/06\/52910\/52910-159068.jpeg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/06\/52910\/52910-159068.jpeg', true, ''); return false;\" title=\"Outdoor space at Peel Memorial Hospital Phase 2, designed by HOK for Plenary Health\"\/><span class=\"image-description\">Outdoor space at Peel Memorial Hospital Phase 2, designed by HOK for Plenary Health<\/span><\/p>\n<p>The proposal for Phase 2 also aims to create a community hub for patients and their families. The development includes a range of amenities, such as a wellness garden and outdoor dining area. The hospital&#8217;s landscaping plan would feature a variety of outdoor spaces, including terraces tiered for sunlight and shade, providing patients and visitors with peaceful areas to relax and recuperate.<\/p>\n<p><imgx alt=\"An aerial view of Peel Memorial Hospital Phase 2 and surrounding area, image retrieved from Google Maps\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-2d3bd6b6-a00d-4d40-8495-1ce05a4e08d3\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/06\/52910\/52910-159072.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/06\/52910\/52910-159072.jpg', true, ''); return false;\" title=\"An aerial view of the site and surrounding area, image retrieved from Google Maps\"\/><span class=\"image-description\">An aerial view of the site and surrounding area, image retrieved from Google Maps<\/span><\/p>\n<p>The building would have four levels of underground parking, two of which would connect to Phase 1, providing 361 parking spaces, of which 28 would be accessible, and 120 would be part of a surface parking lot east of Lynch Street.<\/p>\n<p>Peel Memorial Hospital Phase 2 would be a significant addition to Brampton strained\u2019s healthcare landscape. Its innovative spaces and environmentally friendly approach aim to provide a model for upcoming healthcare developments. As the Greater Toronto Area continues to grapple with healthcare space shortages, this project chips away at the deficit to a degree.<\/p>\n<p>UrbanToronto will continue to follow progress on this development, but in the meantime, you can learn more about it from our Database file, linked below. If you&#8217;d like, you can join in on the conversation in the associated Project Forum thread or leave a comment in the space provided on this page.<\/p>\n<p style=\"text-align: center;\">* * *<\/p>\n<p>UrbanToronto has a research service,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/Pro\/\" target=\"_blank\">UrbanToronto Pro<\/a>, that provides comprehensive data on construction projects in the Greater Toronto Area\u2014from proposal through to completion. We also offer\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/reports\/\" target=\"_blank\">Instant\u00a0Reports<\/a>, downloadable snapshots based on location, and a daily subscription newsletter,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\">New Development Insider<\/a>, that tracks projects from initial application.<\/p>\n<table class=\"layout-article-companies\">\n<tr>\n<td class=\"article-companies\">Related Companies:\u00a0<\/td>\n<td>\n<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/pcl-construction.7938\" target=\"_blank\">PCL Construction<\/a><\/td>\n<\/tr>\n<\/table>\n<\/div>\n<p><script>\n!function(f,b,e,v,n,t,s){if(f.fbq)return;n=f.fbq=function(){n.callMethod?\nn.callMethod.apply(n,arguments):n.queue.push(arguments)};if(!f._fbq)f._fbq=n;\nn.push=n;n.loaded=!0;n.version='2.0';n.queue=[];t=b.createElement(e);t.async=!0;\nt.src=v;s=b.getElementsByTagName(e)[0];s.parentNode.insertBefore(t,s)}(window,\ndocument,'script','\/\/connect.facebook.net\/en_US\/fbevents.js');\nfbq('init', '1760257484204295');\nfbq('track', \"PageView\");<\/script><br \/>\n<br \/><script async src=\"https:\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js?client=ca-pub-5143531171910809\"\r\n     crossorigin=\"anonymous\"><\/script>\r\n<!-- News - Bottom -->\r\n<ins class=\"adsbygoogle\"\r\n     style=\"display:block\"\r\n     data-ad-client=\"ca-pub-5143531171910809\"\r\n     data-ad-slot=\"8320848692\"\r\n     data-ad-format=\"auto\"\r\n     data-full-width-responsive=\"true\"><\/ins>\r\n<script>\r\n     (adsbygoogle = window.adsbygoogle || []).push({});\r\n<\/script><br \/>\n<br \/><a href=\"https:\/\/urbantoronto.ca\/news\/2023\/06\/peel-memorial-hospital-phase-2-moving-forward-brampton.52910\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>As the cityscape of the Greater Toronto Area continues to evolve, so too does its healthcare infrastructure. A mounting healthcare &#8230; <a title=\"Peel Memorial Hospital Phase 2 Moving Forward in Brampton\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/peel-memorial-hospital-phase-2-moving-forward-in-brampton\/\" aria-label=\"Read more about Peel Memorial Hospital Phase 2 Moving Forward in Brampton\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":18238,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1088],"tags":[],"class_list":["post-18237","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-urban-toronto","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/18237","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=18237"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/18237\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media\/18238"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=18237"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=18237"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=18237"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}