{"id":18343,"date":"2023-06-18T00:32:45","date_gmt":"2023-06-18T07:32:45","guid":{"rendered":"https:\/\/essential.construction\/news\/bid-race-for-21m-tate-liverpool-revamp\/"},"modified":"2023-06-18T00:32:49","modified_gmt":"2023-06-18T07:32:49","slug":"bid-race-for-21m-tate-liverpool-revamp","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/bid-race-for-21m-tate-liverpool-revamp\/","title":{"rendered":"Bid race for \u00a321m Tate Liverpool revamp"},"content":{"rendered":"<p> <a href=\"https:\/\/essential.construction\/files\/membership-default-internal\/\" class=\"memberhide\"><img decoding=\"async\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/01\/20220718_175041000_iOS.jpg\" alt=\"-\"><\/a><br\/><br \/>\n<\/p>\n<div id=\"post-475848\">\n\t<!-- .entry-header --><\/p>\n<div class=\"entry-content\">\n<p>The Re-Imagining Tate Liverpool is a major remodelling of the building to improve the gallery\u2019s visibility and presence on the dock underlining its credentials as a leading international cultural institution.<\/p>\n<p>Already 6a architects has been appointed to redesign the iconic 1846 warehouse that was redesigned by Sir James Stirling and Michael Wilford in the late 1980s.<\/p>\n<p>Planned works will include significant alterations throughout the galleries including breakout of floors, new lifts and stairs, as well as a complete building services refit and fa\u00e7ade replacement.<\/p>\n<div id=\"attachment_475852\" class=\"wp-caption aligncenter\"><a rel=\"nofollow\" href=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/06\/Concept-art-for-reimagined-Tate-Liverpool-6a-architects-1000x600-1.png\"><\/a><\/p>\n<p class=\"wp-caption-text\">The design is hoped to reveal more of the former Victorian warehouse through its new open plan ground floor<\/p>\n<\/div>\n<p>The chosen contractor will initially work for 3 months under a pre-construction services agreement before agreeing a final price for the 17-month revamp.<\/p>\n<p>Fims have until 17 July for expressions of interest. For more information click<a rel=\"nofollow noopener\" href=\"https:\/\/www.delta-esourcing.com\/delta\/respondToList.html?accessCode=39S3ADV36A\" target=\"_blank\"> here<\/a>.<\/p>\n<p><a rel=\"nofollow\" href=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/06\/Concept-art-for-reimagined-Tate-Liverpool-6a-architects-2-1050x600-1.png\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-475853\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/06\/Concept-art-for-reimagined-Tate-Liverpool-6a-architects-2-1050x600-1.png\" alt=\"-\" width=\"1050\" height=\"600\"><\/a><\/p>\n<\/p><\/div>\n<p><!-- .entry-content --><\/p>\n<footer class=\"entry-meta\">\n<div class=\"author-info\">\n<div class=\"sleeve\">\n<div class=\"author-avatar\">\n<div class=\"sleeve\">\n\t\t<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/01\/2.jpg\" alt=\"Aaron Morby\" width=\"150\" height=\"150\" class=\"photo\">\t\t<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<p><!-- .author-info -->\t\t\t<\/footer>\n<\/div>\n<p><script async src=\"https:\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js?client=ca-pub-5143531171910809\"\r\n     crossorigin=\"anonymous\"><\/script>\r\n<!-- News - Bottom -->\r\n<ins class=\"adsbygoogle\"\r\n     style=\"display:block\"\r\n     data-ad-client=\"ca-pub-5143531171910809\"\r\n     data-ad-slot=\"8320848692\"\r\n     data-ad-format=\"auto\"\r\n     data-full-width-responsive=\"true\"><\/ins>\r\n<script>\r\n     (adsbygoogle = window.adsbygoogle || []).push({});\r\n<\/script><br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2023\/06\/16\/bid-race-for-21m-tate-liverpool-revamp\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Re-Imagining Tate Liverpool is a major remodelling of the building to improve the gallery\u2019s visibility and presence on the &#8230; <a title=\"Bid race for \u00a321m Tate Liverpool revamp\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/bid-race-for-21m-tate-liverpool-revamp\/\" aria-label=\"Read more about Bid race for \u00a321m Tate Liverpool revamp\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":18344,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-18343","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/18343","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=18343"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/18343\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media\/18344"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=18343"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=18343"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=18343"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}