{"id":18637,"date":"2023-06-26T00:48:35","date_gmt":"2023-06-26T07:48:35","guid":{"rendered":"https:\/\/essential.construction\/news\/steel-framework-for-2-sided-halo-board-in-place-at-la-clippers-new-arena\/"},"modified":"2023-06-26T00:48:36","modified_gmt":"2023-06-26T07:48:36","slug":"steel-framework-for-2-sided-halo-board-in-place-at-la-clippers-new-arena","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/steel-framework-for-2-sided-halo-board-in-place-at-la-clippers-new-arena\/","title":{"rendered":"Steel framework for 2 sided halo board in place at LA Clippers&#8217; new arena"},"content":{"rendered":"<p> <a href=\"https:\/\/essential.construction\/files\/membership-default-internal\/\" class=\"memberhide\"><img decoding=\"async\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/01\/20220718_175041000_iOS.jpg\" alt=\"-\"><\/a><br\/><br \/>\n<\/p>\n<div>\n<p>INGLEWOOD, CA. \u2013 The Los Angeles Clippers\u2019 new arena is on schedule to open next year, with the steel framework for its two-sided halo board now in place above the 18,000 seats.<\/p>\n<p>The Clippers will play their final season at Crypto.com Arena in downtown Los Angeles before moving into the Intuit Dome in nearby Inglewood for the 2024-25 NBA season.<\/p>\n<p>The team showed off the arena\u2019s progress to media on Thursday, hours before the NBA draft.<\/p>\n<p>The building\u2019s roof was designed to accommodate the halo board\u2019s 44,000 square feet of LED lights.<\/p>\n<p>Construction\u00a0workers bent over, stretching on the dirt main floor before their shift began.<\/p>\n<p>The concrete for the upper bowl seats is in place, including The Wall area, which includes a 51-row section inspired by European soccer stadiums that puts fans in loud proximity to the action on the court.<\/p>\n<p>The Clippers\u2019 locker room has been framed out. It\u2019s adjacent to two practice courts that feature natural light pouring in from large windows. Outside is a garden area that includes a lap pool available to the team.<\/p>\n<p style=\"text-align: center;\"><strong>\u00a92023 THE ASSOCIATED PRESS<\/strong><\/p>\n<\/p><\/div>\n<p><script async src=\"https:\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js?client=ca-pub-5143531171910809\"\r\n     crossorigin=\"anonymous\"><\/script>\r\n<!-- News - Bottom -->\r\n<ins class=\"adsbygoogle\"\r\n     style=\"display:block\"\r\n     data-ad-client=\"ca-pub-5143531171910809\"\r\n     data-ad-slot=\"8320848692\"\r\n     data-ad-format=\"auto\"\r\n     data-full-width-responsive=\"true\"><\/ins>\r\n<script>\r\n     (adsbygoogle = window.adsbygoogle || []).push({});\r\n<\/script><br \/>\n<br \/><a href=\"https:\/\/canada.constructconnect.com\/dcn\/news\/usa\/2023\/06\/steel-framework-for-2-sided-halo-board-in-place-at-la-clippers-new-arena\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>INGLEWOOD, CA. \u2013 The Los Angeles Clippers\u2019 new arena is on schedule to open next year, with the steel framework &#8230; <a title=\"Steel framework for 2 sided halo board in place at LA Clippers&#8217; new arena\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/steel-framework-for-2-sided-halo-board-in-place-at-la-clippers-new-arena\/\" aria-label=\"Read more about Steel framework for 2 sided halo board in place at LA Clippers&#8217; new arena\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":18638,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1037],"tags":[357,295],"class_list":["post-18637","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-daily-commercial-news","tag-blog","tag-technology","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/18637","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=18637"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/18637\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media\/18638"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=18637"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=18637"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=18637"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}