{"id":19255,"date":"2023-07-08T01:14:30","date_gmt":"2023-07-08T08:14:30","guid":{"rendered":"https:\/\/essential.construction\/news\/ontario-power-generation-and-province-plan-3-more-small-modular-reactors\/"},"modified":"2023-07-08T01:14:31","modified_gmt":"2023-07-08T08:14:31","slug":"ontario-power-generation-and-province-plan-3-more-small-modular-reactors","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/ontario-power-generation-and-province-plan-3-more-small-modular-reactors\/","title":{"rendered":"Ontario Power Generation and province plan 3 more small modular reactors"},"content":{"rendered":"<p> <a href=\"https:\/\/essential.construction\/files\/membership-default-internal\/\" class=\"memberhide\"><img decoding=\"async\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/01\/20220718_175041000_iOS.jpg\" alt=\"-\"><\/a><br\/><br \/>\n<\/p>\n<div>\n<p>CLARINGTON, ONT. \u2014 Ontario Power Generation and the province are planning three more small modular reactors (SMR) at the site of the Darlington nuclear power plant.<\/p>\n<p>One SMR is already being built there, with\u00a0construction\u00a0of the first unit set to be complete by 2028.<\/p>\n<p>OPG president Ken Hartwick says the planned fleet of SMRs would produce 1,200 megawatts of electricity, enough to power the equivalent of 1.2 million homes by the mid-2030s.<\/p>\n<p>That is around when rising electricity demand is projected to surpass supply by about 5,000 megawatts and Energy Minister Todd Smith has made a number of recent announcements aimed at closing that gap, including a new, large-scale nuclear plant at Bruce Power on Lake Huron.<\/p>\n<p>Smith says it is part of Ontario\u2019s plan to meet electricity demand with emissions-free power, though some critics have warned about relying on SMRs as a relatively untested power source. Small modular reactors use similar technology to traditional nuclear power plants, but they are much smaller.<\/p>\n<p style=\"text-align: center;\"><span class=\"ui-provider fz b c d e f g h i j k l m n o p q r s t u v w x y z ab ac ae af ag ah ai aj ak\" dir=\"ltr\"><strong>\u00a9 2023 The Canadian Press<\/strong><\/span><\/p>\n<\/p><\/div>\n<p><script async src=\"https:\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js?client=ca-pub-5143531171910809\"\r\n     crossorigin=\"anonymous\"><\/script>\r\n<!-- News - Bottom -->\r\n<ins class=\"adsbygoogle\"\r\n     style=\"display:block\"\r\n     data-ad-client=\"ca-pub-5143531171910809\"\r\n     data-ad-slot=\"8320848692\"\r\n     data-ad-format=\"auto\"\r\n     data-full-width-responsive=\"true\"><\/ins>\r\n<script>\r\n     (adsbygoogle = window.adsbygoogle || []).push({});\r\n<\/script><br \/>\n<br \/><a href=\"https:\/\/canada.constructconnect.com\/dcn\/news\/infrastructure\/2023\/07\/ontario-power-generation-and-province-plan-3-more-small-modular-reactors\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>CLARINGTON, ONT. \u2014 Ontario Power Generation and the province are planning three more small modular reactors (SMR) at the site &#8230; <a title=\"Ontario Power Generation and province plan 3 more small modular reactors\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/ontario-power-generation-and-province-plan-3-more-small-modular-reactors\/\" aria-label=\"Read more about Ontario Power Generation and province plan 3 more small modular reactors\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":19256,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1037],"tags":[357,295],"class_list":["post-19255","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-daily-commercial-news","tag-blog","tag-technology","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/19255","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=19255"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/19255\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media\/19256"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=19255"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=19255"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=19255"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}