{"id":19428,"date":"2023-07-12T07:27:49","date_gmt":"2023-07-12T14:27:49","guid":{"rendered":"https:\/\/essential.construction\/news\/balfour-beatty-wins-36m-north-carolina-highway-project\/"},"modified":"2023-07-12T07:27:49","modified_gmt":"2023-07-12T14:27:49","slug":"balfour-beatty-wins-36m-north-carolina-highway-project","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/balfour-beatty-wins-36m-north-carolina-highway-project\/","title":{"rendered":"Balfour Beatty wins $36M North Carolina highway project"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div>\n<div class=\"ed-secondary-content-box ed-secondary-content-box--expandable\">\n<p><span><span><span><strong><span><span>Award: <\/span><\/span><\/strong><\/span><\/span><\/span><span><span><span><span><span><span>Junction reconstruction of state Route 87 and Route 11<\/span><\/span><\/span><\/span><\/span><\/span><br \/><span><span><span><strong><span><span>Value:<\/span><\/span><\/strong><\/span><\/span><\/span><span><span><span><span><span><span> $36 million<\/span><\/span><\/span><\/span><\/span><\/span><br \/><span><span><span><strong><span><span>Location: <\/span><\/span><\/strong><\/span><\/span><\/span><span><span><span><span><span><span>Near Sandyfield, North Carolina<\/span><\/span><\/span><\/span><\/span><\/span><br \/><span><span><span><strong><span><span>Client: <\/span><\/span><\/strong><\/span><\/span><\/span><span><span><span><span><span><span>North Carolina DOT<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<\/div>\n<p><span><span><span><span><span><span>Balfour Beatty won an approximately $36 million contract from the North Carolina DOT to reconstruct the junction of state Route 87 and Route 11, according to an announcement the company shared with Construction Dive.\u00a0<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>The project will take place near Sandyfield, which is northwest of Wilmington, in the state\u2019s southeast corner.\u00a0<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>Balfour Beatty will build a grade-separated interchange, which will carry Route 11 over Route 87 and improve safety and mobility in Columbus County by shifting traffic onto a newly constructed bridge, according to the release.<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>The contractor will also build on and off ramps to connect the two highways. The improvement project will feature widened four lanes.<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>\u201cThis highway is an important corridor in southeastern North Carolina and a popular route to area beaches,\u201d said Drew Cox, North Carolina DOT Division 6 engineer, in the release. \u201cThe new interchange will vastly improve the safety, traffic flow and operation of this junction.\u201d<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>This is at least the third project Balfour Beatty has won in North Carolina this year.\u00a0<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>In February, the company landed a <\/span><\/span><\/span><\/span><\/span><\/span><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructiondive.com\/news\/balfour-beatty-awarded-242m-us-70-project\/642288\/\" target=\"_blank\"><span><span><span><span><span><span><span><span>$242.35 million design-build contract<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/a><span><span><span><span><span><span> to improve the U.S. Highway 70 corridor, the future Interstate 42, between Raleigh and the Port of Morehead City to interstate standards. And in April, a JV led by Balfour Beatty won a <\/span><\/span><\/span><\/span><\/span><\/span><a rel=\"nofollow noopener\" href=\"https:\/\/www.constructiondive.com\/news\/balfour-beatty-led-jv-nabs-650m-north-carolina-airport-job\/646616\/\" target=\"_blank\"><span><span><span><span><span><span><span><span>$650 million contract<\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/span><\/a><span><span><span><span><span><span> for improvements to Raleigh-Durham International Airport.<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<p><span><span><span><span><span><span>Construction is expected to begin this summer with anticipated completion by the summer of 2026.<\/span><\/span><\/span><\/span><\/span><\/span><\/p>\n<\/p><\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructiondive.com\/news\/balfour-beatty-wins-36m-north-carolina-highway-project\/686263\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] Award: Junction reconstruction of state Route 87 and Route 11Value: $36 millionLocation: Near Sandyfield, North CarolinaClient: North Carolina DOT &#8230; <a title=\"Balfour Beatty wins $36M North Carolina highway project\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/balfour-beatty-wins-36m-north-carolina-highway-project\/\" aria-label=\"Read more about Balfour Beatty wins $36M North Carolina highway project\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":19429,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[457],"tags":[],"class_list":["post-19428","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction-dive","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/19428","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=19428"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/19428\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media\/19429"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=19428"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=19428"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=19428"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}