{"id":19612,"date":"2023-07-17T07:27:58","date_gmt":"2023-07-17T14:27:58","guid":{"rendered":"https:\/\/essential.construction\/news\/information-is-king-the-ever-increasing-role-of-the-i-in-bim-for-construction-projects-by-nick-scalone\/"},"modified":"2023-07-17T07:27:59","modified_gmt":"2023-07-17T14:27:59","slug":"information-is-king-the-ever-increasing-role-of-the-i-in-bim-for-construction-projects-by-nick-scalone","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/information-is-king-the-ever-increasing-role-of-the-i-in-bim-for-construction-projects-by-nick-scalone\/","title":{"rendered":"Information is king &#8211; The ever-increasing role of the \u2018I\u2019 in BIM for construction projects By Nick Scalone"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div itemprop=\"articleBody\">\n<p><span data-contrast=\"none\">T<\/span><span data-contrast=\"auto\">he \u2018I\u2019 in BIM has always had the potential to be important in construction projects. It\u2019s not a new concept and has been thrown around the industry since the 1970s. It wasn\u2019t commonly known until the US Army Corps of Engineers first introduced the term BIM in a 1992 report on the use of digital technology in the construction industry. This simple concept has grown exponentially more valuable than when it was first introduced and has more implications for projects than just a 3D model or design. Let\u2019s explore how \u2018information\u2019 has evolved, how it has changed the behavior of firms regarding digital delivery, and how this impacts the industry\u2019s ability to become more sustainable and energy efficient.\u202f<\/span><span data-ccp-props=\"{&quot;201341983&quot;:1,&quot;335559731&quot;:0,&quot;335559740&quot;:320}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Before we proceed with how and why the \u2018I\u2019 is used, let\u2019s ensure we\u2019re on the same page about what the \u2018I\u2019 even means. When the term was introduced, the primary focus was on the use of 3D modeling software with limited capabilities for integrating information beyond basic geometry. Recently, the International Organization for Standardization (ISO) defined Information as: <\/span><i><span data-contrast=\"auto\">\u201cReinterpretable representation of data in a formalized manner suitable for communication, interpretation, or processing.\u201d<\/span><\/i> <span data-contrast=\"auto\">(ISO 19650-1 :2018)\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:1,&quot;335559731&quot;:340,&quot;335559740&quot;:320}\">\u00a0<\/span><\/p>\n<p><b><span data-contrast=\"none\">Full lifecycle benefits<\/span><\/b><span data-ccp-props=\"{&quot;201341983&quot;:1,&quot;335559738&quot;:56,&quot;335559740&quot;:320}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The ISO definition is considerably different from what many of us assume. The original goal, which is still true today, is that the information is used to inform decision-making. Focusing on the key terms \u2018reinterpretable\u2019 and \u2018formalized,\u2019 will help guide the answer to the role information plays today.\u202f\u202f<\/span><span data-ccp-props=\"{&quot;201341983&quot;:1,&quot;335559731&quot;:0,&quot;335559740&quot;:320}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">I believe the \u2018I\u2019 in BIM has evolved over the years in two primary ways: the viable length of time the information is used and the expansion of its use cases and benefits.\u202f<\/span><span data-ccp-props=\"{&quot;201341983&quot;:1,&quot;335559731&quot;:340,&quot;335559740&quot;:320}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Instead of the information only benefiting one phase of a project at a time, it\u2019s now understood that it has full lifecycle benefits. Paul Teicholz demonstrated the importance of keeping consistent information in 2013 with his famous information loss curve, adapted here.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:1,&quot;335559731&quot;:340,&quot;335559740&quot;:320}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">What has changed is that the technology used to capture this information and where it is stored has greatly improved, minimizing its loss. It\u2019s also being used by non-traditional delivery team members like subcontractors, commissioning agents, and energy consultants.\u202f\u202f<\/span><span data-ccp-props=\"{&quot;201341983&quot;:1,&quot;335559731&quot;:340,&quot;335559740&quot;:320}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">These additional stakeholders lead us to the second evolution: expansion of use cases. With information becoming more centralized, reliable, and readily available, use cases like embodied carbon analysis, digital twins, and asset tracking are becoming the norm.\u202f\u202f<\/span><span data-ccp-props=\"{&quot;201341983&quot;:1,&quot;335559731&quot;:340,&quot;335559740&quot;:320}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">As previously mentioned, the term information has become not only important to project stakeholders, but international regulatory and standards bodies have inadvertently proven the \u2018I\u2019 is more important than the term \u2018BIM.\u2019 In the latest publication of ISO 19650, the term \u2018information\u2019 is mentioned over four hundred times without the context of BIM.\u202f<\/span><span data-ccp-props=\"{&quot;201341983&quot;:1,&quot;335559731&quot;:340,&quot;335559740&quot;:320}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">For entire project teams to really capture all the benefits of the \u2018I\u2019, there needs to be, and what has slowly happened, is a shift in the way all team members approach digital delivery. Creating silos of information and information hoarding are tell-tale signs of a firm\u2019s unwillingness to change its project delivery approach. On the flip side, those that are willing to improve project delivery not only for their team, but the entire delivery team are quickly adopting ISO workflows, and Common Data Environments (CDE) that are more agile in their approach. \u202f<\/span><span data-ccp-props=\"{&quot;201341983&quot;:1,&quot;335559731&quot;:340,&quot;335559740&quot;:320}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Additionally, building owners and operators are quickly trying to catch up with their digital lifecycle initiatives. We have numerous clients purchasing CDEs, getting certifications in ISO 19650, and writing RFPs, who are seeking guidance with these digital strategies.\u202f\u202f<\/span><span data-ccp-props=\"{&quot;201341983&quot;:1,&quot;335559731&quot;:340,&quot;335559740&quot;:320}\">\u00a0<\/span><\/p>\n<p><b><span data-contrast=\"none\">A proactive approach<\/span><\/b><span data-ccp-props=\"{&quot;201341983&quot;:1,&quot;335559738&quot;:56,&quot;335559740&quot;:320}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">One of the challenges still facing the industry is that the information is standardized, collected, and used by completely different teams, sometimes years apart. Any \u2018kink\u2019 in the chain causes tremendous amounts of rework or wasted efforts downstream. Sometimes, it\u2019s impossible to know what went wrong. These challenges are certainly being mitigated by CDEs, the rise of the Information Manager, and better contract language and standards provided by building owners.\u202f<\/span><span data-ccp-props=\"{&quot;201341983&quot;:1,&quot;335559731&quot;:0,&quot;335559740&quot;:320}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">As mentioned earlier, ensuring good information for the full lifecycle of a building will certainly impact our initiatives around embodied carbon, building performance, and energy efficiency. There are two ways we can approach these initiatives: reactively and proactively.\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:1,&quot;335559731&quot;:340,&quot;335559740&quot;:320}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Unfortunately, many initiatives are reactive responses to something that has already occurred. A good example is a large commercial real estate client in the<img decoding=\"async\" loading=\"lazy\" class=\"size-full wp-image-4086 alignright\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/07\/Microdesk-2.jpg\" alt=\"-\" width=\"500\" height=\"500\"> technology sector. They have some of the best and most visible sustainability goals, but they track their embodied carbon on the<\/span> <span data-contrast=\"auto\">project\u2019s Bill of Materials (BOM) <\/span><i><span data-contrast=\"auto\">after<\/span><\/i> <span data-contrast=\"auto\">the materials have been purchased and installed. While it\u2019s great they can understand how well they did, it doesn\u2019t allow them to make better sustainability decisions on the current project.\u202f\u202f<\/span><span data-ccp-props=\"{&quot;201341983&quot;:1,&quot;335559731&quot;:340,&quot;335559740&quot;:320}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The proactive approach to sustainability initiatives is certainly more difficult, but it\u2019s achievable with clear goals, great partners, and an ability to think bigger. Tools<\/span> <span data-contrast=\"auto\">are available to\u202fenable you to do embodied carbon tracking directly on BIMs during the middle of design, which will<\/span> <span data-contrast=\"auto\">allow for more informed decision-making before the design is finalized and it\u2019s too costly to change later in the project.\u202f<\/span><span data-ccp-props=\"{&quot;201341983&quot;:1,&quot;335559731&quot;:340,&quot;335559740&quot;:320}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">To summarize, the \u2018I\u2019 in BIM has evolved substantially, as with most industries over the past few decades. Its original intention was to make more informed decisions impacting cost, schedule, and quality, which is very true today. In her book \u2018Creating a Culture of Predictable Outcomes,\u2019 Barbara White Bryson says: \u201cTiming is everything when it comes to decisions in the design and construction industries.\u201d (Bryson 2021)<\/span><span data-contrast=\"none\">. <\/span><span data-contrast=\"auto\">Having access to better information when it\u2019s needed during the full lifecycle has put a renewed emphasis on its importance.\u202f<\/span><\/p>\n<p><i><span data-contrast=\"auto\">For a list of the sources used in this article, please contact the editor.\u00a0<\/span><\/i><span data-ccp-props=\"{&quot;201341983&quot;:1,&quot;335559731&quot;:0,&quot;335559740&quot;:320}\">\u00a0<\/span><\/p>\n<p><i><span data-contrast=\"auto\">Nick Scalone is Microdesk\u2019s Director of Program Management. Microdesk, a leading provider of BIM, Virtual Design &amp; Construction (VDC) and Enterprise Asset Management (EAM) services, is dedicated to assisting design, construction, and operations teams. It has a more than 30-year history of implementing innovative technologies and processes, sustainable design, and building methodologies. Its enhanced focus on digital transformation is another example of the company\u2019s legacy in bringing new tools to the AEC industry to promote efficiency, sustainability,\u202fand the ability to address macro-economic trends including urbanization.\u202f<\/span><\/i><span data-ccp-props=\"{&quot;201341983&quot;:1,&quot;335559731&quot;:0,&quot;335559737&quot;:226,&quot;335559740&quot;:320}\">\u00a0<\/span><\/p>\n<p><a rel=\"external noopener noreferrer nofollow\" href=\"http:\/\/www.microdesk.com\" data-wpel-link=\"external\" target=\"_blank\"><span data-contrast=\"none\">www.microdesk.com<\/span><span data-ccp-props=\"{&quot;201341983&quot;:2,&quot;335559685&quot;:0,&quot;335559737&quot;:227,&quot;335559740&quot;:280}\">\u00a0<\/span><\/a><\/p>\n<\/p><\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/construction-today.com\/news\/information-is-king-the-ever-increasing-role-of-the-i-in-bim-for-construction-projects-by-nick-scalone\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] The \u2018I\u2019 in BIM has always had the potential to be important in construction projects. It\u2019s not a new &#8230; <a title=\"Information is king &#8211; The ever-increasing role of the \u2018I\u2019 in BIM for construction projects By Nick Scalone\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/information-is-king-the-ever-increasing-role-of-the-i-in-bim-for-construction-projects-by-nick-scalone\/\" aria-label=\"Read more about Information is king &#8211; The ever-increasing role of the \u2018I\u2019 in BIM for construction projects By Nick Scalone\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":19613,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1066,1129,1147],"tags":[298,1126,288,1130],"class_list":["post-19612","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-all-posts","category-construction-today","category-north-america","tag-construction","tag-industry-news","tag-news","tag-north-america","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/19612","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=19612"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/19612\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media\/19613"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=19612"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=19612"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=19612"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}