{"id":19815,"date":"2023-07-21T13:09:56","date_gmt":"2023-07-21T20:09:56","guid":{"rendered":"https:\/\/essential.construction\/news\/studying-a-possible-rail-link-from-yyc-to-downtown-calgary\/"},"modified":"2023-07-21T13:09:57","modified_gmt":"2023-07-21T20:09:57","slug":"studying-a-possible-rail-link-from-yyc-to-downtown-calgary","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/studying-a-possible-rail-link-from-yyc-to-downtown-calgary\/","title":{"rendered":"Studying a possible rail link from YYC to downtown Calgary"},"content":{"rendered":"<p> <a href=\"https:\/\/essential.construction\/files\/membership-default-internal\/\" class=\"memberhide\"><img decoding=\"async\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/01\/20220718_175041000_iOS.jpg\" alt=\"-\"><\/a><br\/><br \/>\n<\/p>\n<div>\n<p>Calgary may gain a train from its airport to the city\u2019s downtown. The provincial government is partnering with the City of Calgary to study the optimal rail alignment between downtown Calgary and the Calgary International Airport.<\/p>\n<p>The government says the partnership will help ensure the province is on track to deliver on a future of world-class transportation infrastructure, adding that a new rail line would connect more people to Calgary\u2019s downtown and revolutionize Alberta\u2019s infrastructure for business and the tourism industry.<\/p>\n<p>The Calgary Airport Rail Connection Study will include a ridership review, development and evaluation of different alignment scenarios and will identify the optimal connection from downtown to airport.<\/p>\n<p>\u201cAs Calgary continues to grow, it\u2019s vital to have a road map to build out a transit network that increases capacity and supports transportation needs now and into the future,\u201d stated Devin Dreeshen, Minister of Transportation and Economic Corridors. \u201cThis project is an important step forward in providing direction on affordable transit infrastructure that will best serve Calgary while respecting taxpayer investment.\u201d<\/p>\n<p>As part of the province\u2019s 2023 budget, $3 million was allocated to the City of Calgary to lead the Calgary Airport Rail Connection Study. As such, an engineering consultant will be recruited to assist with the technical study, which will also include engagement with Canada Infrastructure Bank, the Calgary International Airport, Canadian Pacific Kansas City and various private rail developers who are developing private project plans to connect downtown with the airport and the surrounding region.<\/p>\n<p>\u201cIt\u2019s important for us to take a comprehensive look at all factors in this technically and physically constrained corridor to establish an optimal functional alignment that will best serve Calgarians, visitors and employees of the airport and surrounding lands,\u201d explained Michael Thompson, general manager of infrastructure services at the City of Calgary. \u201cThe study will consider existing rail plans, past City of Calgary transit studies and other opportunities to help guide future transit planning.\u201d<\/p>\n<p>A request for proposals is currently in market for an engineering consultant to assist with the study. Once a consultant has been selected through the competitive process, the study is expected to begin in October with a target delivery date for the survey being August of 2024.<\/p>\n<p>Recommendations from the study will ultimately be provided to Calgary city council to help guide the city\u2019s short to long-term transportation and land use planning.<\/p>\n<p>\u00a0<\/p>\n<p>www.alberta.ca<\/p>\n<\/p><\/div>\n<p><script>(function(d, s, id) {\n\t  var js, fjs = d.getElementsByTagName(s)[0];\n\t  if (d.getElementById(id)) return;\n\t  js = d.createElement(s); js.id = id;\n\t  js.src = \"\/\/connect.facebook.net\/en_US\/sdk.js#xfbml=1&appId=761779333850340&version=v2.0\";\n\t  fjs.parentNode.insertBefore(js, fjs);\n\t}(document, 'script', 'facebook-jssdk'));<\/script><br \/>\n<br \/><script async src=\"https:\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js?client=ca-pub-5143531171910809\"\r\n     crossorigin=\"anonymous\"><\/script>\r\n<!-- News - Bottom -->\r\n<ins class=\"adsbygoogle\"\r\n     style=\"display:block\"\r\n     data-ad-client=\"ca-pub-5143531171910809\"\r\n     data-ad-slot=\"8320848692\"\r\n     data-ad-format=\"auto\"\r\n     data-full-width-responsive=\"true\"><\/ins>\r\n<script>\r\n     (adsbygoogle = window.adsbygoogle || []).push({});\r\n<\/script><br \/>\n<br \/><a href=\"https:\/\/www.on-sitemag.com\/construction\/studying-a-possible-rail-link-from-yyc-to-downtown-calgary\/1003979906\/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=studying-a-possible-rail-link-from-yyc-to-downtown-calgary\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Calgary may gain a train from its airport to the city\u2019s downtown. The provincial government is partnering with the City &#8230; <a title=\"Studying a possible rail link from YYC to downtown Calgary\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/studying-a-possible-rail-link-from-yyc-to-downtown-calgary\/\" aria-label=\"Read more about Studying a possible rail link from YYC to downtown Calgary\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":19816,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1085],"tags":[],"class_list":["post-19815","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-onsite-magazine","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/19815","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=19815"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/19815\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media\/19816"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=19815"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=19815"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=19815"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}