{"id":19913,"date":"2023-07-24T14:05:04","date_gmt":"2023-07-24T21:05:04","guid":{"rendered":"https:\/\/essential.construction\/news\/flooding-in-nova-scotia-washes-out-cn-rail-track-disrupting-train-traffic\/"},"modified":"2023-07-24T14:05:05","modified_gmt":"2023-07-24T21:05:05","slug":"flooding-in-nova-scotia-washes-out-cn-rail-track-disrupting-train-traffic","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/flooding-in-nova-scotia-washes-out-cn-rail-track-disrupting-train-traffic\/","title":{"rendered":"Flooding in Nova Scotia washes out CN Rail track, disrupting train traffic"},"content":{"rendered":"<p> <a href=\"https:\/\/essential.construction\/files\/membership-default-internal\/\" class=\"memberhide\"><img decoding=\"async\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/01\/20220718_175041000_iOS.jpg\" alt=\"-\"><\/a><br\/><br \/>\n<\/p>\n<div>\n<p>MONTREAL \u2014 Canadian National Railway Co. says a major washout has halted traffic along part of its main line in Nova Scotia after torrential rain and flooding struck the province over the weekend.<\/p>\n<p>A washed-out culvert left a stretch of track sagging unsupported over a massive ditch some 90 kilometres north of Halifax on the key rail connection for freight and passengers between the city and the rest of the country.<\/p>\n<p>Via Rail has also issued a travel warning, with no bookings available until Friday between Halifax and Moncton, N.B., after three months\u2019 worth of rain deluged Nova Scotia in 24 hours.<\/p>\n<p>CN says crews have restored other damaged infrastructure around the province, but some repairs will be delayed until the floodwaters recede.<\/p>\n<p>The provincewide state of emergency declared by Nova Scotia on Saturday is set to remain in effect until Aug. 5.<\/p>\n<p>Yesterday, federal Emergency Preparedness Minister Bill Blair approved a request from the province for continued assistance.<\/p>\n<p style=\"text-align: center;\"><span class=\"ui-provider fz b c d e f g h i j k l m n o p q r s t u v w x y z ab ac ae af ag ah ai aj ak\" dir=\"ltr\"><strong>\u00a9 2023 The Canadian Press<\/strong><\/span><\/p>\n<\/p><\/div>\n<p><script async src=\"https:\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js?client=ca-pub-5143531171910809\"\r\n     crossorigin=\"anonymous\"><\/script>\r\n<!-- News - Bottom -->\r\n<ins class=\"adsbygoogle\"\r\n     style=\"display:block\"\r\n     data-ad-client=\"ca-pub-5143531171910809\"\r\n     data-ad-slot=\"8320848692\"\r\n     data-ad-format=\"auto\"\r\n     data-full-width-responsive=\"true\"><\/ins>\r\n<script>\r\n     (adsbygoogle = window.adsbygoogle || []).push({});\r\n<\/script><br \/>\n<br \/><a href=\"https:\/\/canada.constructconnect.com\/dcn\/news\/infrastructure\/2023\/07\/flooding-in-nova-scotia-washes-out-cn-rail-track-disrupting-train-traffic\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>MONTREAL \u2014 Canadian National Railway Co. says a major washout has halted traffic along part of its main line in &#8230; <a title=\"Flooding in Nova Scotia washes out CN Rail track, disrupting train traffic\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/flooding-in-nova-scotia-washes-out-cn-rail-track-disrupting-train-traffic\/\" aria-label=\"Read more about Flooding in Nova Scotia washes out CN Rail track, disrupting train traffic\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":19914,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1037],"tags":[357,295],"class_list":["post-19913","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-daily-commercial-news","tag-blog","tag-technology","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/19913","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=19913"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/19913\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media\/19914"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=19913"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=19913"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=19913"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}