{"id":20009,"date":"2023-07-26T22:15:42","date_gmt":"2023-07-27T05:15:42","guid":{"rendered":"https:\/\/essential.construction\/news\/moss-park-student-housing-development-grows-significantly\/"},"modified":"2023-07-26T22:15:43","modified_gmt":"2023-07-27T05:15:43","slug":"moss-park-student-housing-development-grows-significantly","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/moss-park-student-housing-development-grows-significantly\/","title":{"rendered":"Moss Park Student Housing Development Grows Significantly"},"content":{"rendered":"<p> <a href=\"https:\/\/essential.construction\/files\/membership-default-internal\/\" class=\"memberhide\"><img decoding=\"async\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/01\/20220718_175041000_iOS.jpg\" alt=\"-\"><\/a><br\/><br \/>\n<\/p>\n<div id=\"article_body\">\n<p>The <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/news\/2023\/07\/MPI Group\" target=\"_blank\">MPI Group<\/a>\u00a0has submitted to the current Toronto City Council meeting a revised plan for a redevelopment at\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/294-sherbourne.45652\" target=\"_blank\">294 Sherbourne Street<\/a>\u00a0on the east side of Downtown Toronto as\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/www.toronto.ca\/legdocs\/mmis\/2023\/cc\/bgrd\/backgroundfile-238195.pdf\" target=\"_blank\">a potential settlement<\/a>\u00a0in advance of an Ontario Land Tribunal hearing. The building, not far east of Toronto Metropolitan University and designed as a student residence, would now be significantly larger after community consultations highlighted a pressing need, and the developers purchased an additional lot.<\/p>\n<p><imgx alt=\"294 Sherbourne Street, MPI Group, superk\u00fcl\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-e4627ceb-e274-4be4-8ee6-9dc6ac2cbd7b\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/07\/53379\/53379-160554.jpeg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/07\/53379\/53379-160554.jpeg', true, ''); return false;\" title=\"Original size of the site, now with the next property to the north added, image from submission to City of Toronto\"\/><span class=\"image-description\">Original size of the site, now with the next property to the north added, image from submission to City of Toronto<\/span><\/p>\n<p>This development, situated at the southwest corner of Sherbourne Street and Glenholme Place, is approximately a kilometre&#8217;s walk to both College and Dundas stations on Yonge Line 1. In <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/news\/2021\/07\/mid-rise-student-residence-proposed-sherbourne-south-gerrard.45794\" target=\"_blank\">the initial proposal from July 2021<\/a>, the project anticipated a 10-storey building with 153 units, offering 178 student beds.<\/p>\n<p><imgx alt=\"294 Sherbourne Street, MPI Group, superk\u00fcl\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-0b9454a9-b8b9-4388-b2b1-d9a8eaf74752\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/07\/53379\/53379-160557.jpeg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/07\/53379\/53379-160557.jpeg', true, ''); return false;\" title=\"Looking northwest to the previous design by superk\u00fcl for MPI Group\"\/><span class=\"image-description\">Looking northwest to the previous design by superk\u00fcl for MPI Group<\/span><\/p>\n<p>The community consultation process led to a revision in June 2023, increasing the number of student beds to 423. The most recent plans, however, propose a shift to 185 units accommodating 392 beds. This includes 60 2-bedroom units (contributing 120 beds, or 31% of the total), 49 4-bedroom units (providing 196 beds, or 50% of the total), and 76 studio apartments (offering 76 beds, or 19% of the total).<\/p>\n<p><imgx alt=\"294 Sherbourne Street, Toronto, MPI Group, superk\u00fcl\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-aa8bd403-f3a3-441f-b1e0-4becc413dd86\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/07\/53379\/53379-160560.jpeg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/07\/53379\/53379-160560.jpeg', true, ''); return false;\" title=\"Looking west to 294 Sherbourne Street, designed by superk\u00fcl for MPI Group\"\/><span class=\"image-description\">Looking west to 294 Sherbourne Street, designed by superk\u00fcl for MPI Group<\/span><\/p>\n<p>The incorporation of the property at 300 Sherbourne Street expanded the site area to approximately 1,848m\u00b2. This increased area allows for a proposed building of 20 storeys and height of 65.45m, nearly double its original ask, and an increase in the development&#8217;s gross floor area (GFA) by 8,967m\u00b2, totalling 14,217m\u00b2.<\/p>\n<p><imgx alt=\"294 Sherbourne Street, Toronto, MPI Group, superk\u00fcl\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-9612ff5a-1908-420e-9229-4a86fceffc21\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/07\/53379\/53379-160556.jpeg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/07\/53379\/53379-160556.jpeg', true, ''); return false;\" title=\"Looking southeast to 294 Sherbourne Street, designed by superk\u00fcl for MPI Group\"\/><span class=\"image-description\">Looking southeast to 294 Sherbourne Street, designed by superk\u00fcl for MPI Group<\/span><\/p>\n<p>The larger floor plate requested in the settlement proposal letter accommodates more spacious units. Indoor and outdoor amenity areas have also expanded to 416m\u00b2 and 126m\u00b2 respectively, which includes an outdoor terrace atop the 3-storey podium. The revised plan also doubles visitor parking from two to four spaces and adds an additional 110 bicycle spaces.<\/p>\n<p><imgx alt=\"294 Sherbourne Street, Toronto, MPI Group, superk\u00fcl\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-1c206365-df46-4945-adb0-29a707823d1b\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/07\/53379\/53379-160555.jpeg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/07\/53379\/53379-160555.jpeg', true, ''); return false;\" title=\"An aerial view of the outdoor terrace, designed by superk\u00fcl for MPI Group\"\/><span class=\"image-description\">An aerial view of the outdoor terrace, designed by superk\u00fcl for MPI Group<\/span><\/p>\n<p>The design proposes three elevators, each servicing an average of 62 units or 131 beds.<\/p>\n<p><imgx alt=\"294 Sherbourne Street, Toronto, MPI Group, superk\u00fcl\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-20db7105-0042-4dde-81e5-92a26b2e2997\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/07\/53379\/53379-160559.jpeg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/07\/53379\/53379-160559.jpeg', true, ''); return false;\" title=\"Looking northwest to 294 Sherbourne Street, designed by superk\u00fcl for MPI Group\"\/><span class=\"image-description\">Looking northwest to 294 Sherbourne Street, designed by superk\u00fcl for MPI Group<\/span><\/p>\n<p>A significant development nearby aims to address the need for transitional housing; about 200m west, the <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/seaton-house-redevelopment.20386\" target=\"_blank\">Seaton House Redevelopment<\/a>\u00a0will offer a 100-bed men&#8217;s shelter, a 378-bed long-term home, 130 units of assisted living, and 21 affordable housing units.\u00a0<\/p>\n<p><imgx alt=\"294 Sherbourne Street, Toronto, Google Street View\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-cf657a95-f866-48d2-b132-80a87f62b9e2\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/07\/53379\/53379-160561.jpg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/07\/53379\/53379-160561.jpg', true, ''); return false;\" title=\"Looking west to the current site, image retrieved from Google Street View\"\/><span class=\"image-description\">Looking west to the current site, image retrieved from Google Street View<\/span><\/p>\n<p>With Council having approved an amended settlement offer for 294 Sherbourne Street yesterday, the Ontario Land Tribunal will be left to ratify the plans in September.<\/p>\n<p><imgx alt=\"294 Sherbourne Street, Toronto, MPI Group, superk\u00fcl\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-91208074-0e0c-4b24-ae17-e07da43173b0\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/07\/53379\/53379-160558.jpeg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/07\/53379\/53379-160558.jpeg', true, ''); return false;\" title=\"The entrance courtyard, designed by superk\u00fcl for MPI Group\"\/><span class=\"image-description\">The entrance courtyard, designed by superk\u00fcl for MPI Group<\/span><\/p>\n<p>UrbanToronto will continue to follow progress on this development, but in the meantime, you can learn more about it from our Database file, linked below. If you&#8217;d like, you can join in on the conversation in the associated Project Forum thread or leave a comment in the space provided on this page.<\/p>\n<p style=\"text-align: center;\">* * *<\/p>\n<p>UrbanToronto has a research service,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/Pro\/\" target=\"_blank\">UrbanToronto Pro<\/a>, that provides comprehensive data on construction projects in the Greater Toronto Area\u2014from proposal through to completion. We also offer\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/reports\/\" target=\"_blank\">Instant\u00a0Reports<\/a>, downloadable snapshots based on location, and a daily subscription newsletter,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\">New Development Insider<\/a>, that tracks projects from initial application.<\/p>\n<\/div>\n<p><script>\n!function(f,b,e,v,n,t,s){if(f.fbq)return;n=f.fbq=function(){n.callMethod?\nn.callMethod.apply(n,arguments):n.queue.push(arguments)};if(!f._fbq)f._fbq=n;\nn.push=n;n.loaded=!0;n.version='2.0';n.queue=[];t=b.createElement(e);t.async=!0;\nt.src=v;s=b.getElementsByTagName(e)[0];s.parentNode.insertBefore(t,s)}(window,\ndocument,'script','\/\/connect.facebook.net\/en_US\/fbevents.js');\nfbq('init', '1760257484204295');\nfbq('track', \"PageView\");<\/script><br \/>\n<br \/><script async src=\"https:\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js?client=ca-pub-5143531171910809\"\r\n     crossorigin=\"anonymous\"><\/script>\r\n<!-- News - Bottom -->\r\n<ins class=\"adsbygoogle\"\r\n     style=\"display:block\"\r\n     data-ad-client=\"ca-pub-5143531171910809\"\r\n     data-ad-slot=\"8320848692\"\r\n     data-ad-format=\"auto\"\r\n     data-full-width-responsive=\"true\"><\/ins>\r\n<script>\r\n     (adsbygoogle = window.adsbygoogle || []).push({});\r\n<\/script><br \/>\n<br \/><a href=\"https:\/\/urbantoronto.ca\/news\/2023\/07\/moss-park-student-housing-development-grows-significantly.53379\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The MPI Group\u00a0has submitted to the current Toronto City Council meeting a revised plan for a redevelopment at\u00a0294 Sherbourne Street\u00a0on &#8230; <a title=\"Moss Park Student Housing Development Grows Significantly\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/moss-park-student-housing-development-grows-significantly\/\" aria-label=\"Read more about Moss Park Student Housing Development Grows Significantly\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":20010,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1088],"tags":[],"class_list":["post-20009","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-urban-toronto","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/20009","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=20009"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/20009\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media\/20010"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=20009"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=20009"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=20009"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}