{"id":20114,"date":"2023-07-29T10:23:01","date_gmt":"2023-07-29T17:23:01","guid":{"rendered":"https:\/\/essential.construction\/news\/westbend-residences-advances-with-shoring-operations\/"},"modified":"2023-07-29T10:23:03","modified_gmt":"2023-07-29T17:23:03","slug":"westbend-residences-advances-with-shoring-operations","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/westbend-residences-advances-with-shoring-operations\/","title":{"rendered":"Westbend Residences Advances with Shoring Operations"},"content":{"rendered":"<p> <a href=\"https:\/\/essential.construction\/files\/membership-default-internal\/\" class=\"memberhide\"><img decoding=\"async\" src=\"https:\/\/essential.construction\/news\/wp-content\/uploads\/sites\/15\/2023\/01\/20220718_175041000_iOS.jpg\" alt=\"-\"><\/a><br\/><br \/>\n<\/p>\n<div id=\"article_body\">\n<p>Since <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/news\/2023\/05\/excavation-underway-level-out-sloping-site-westbend-residences.52608\" target=\"_blank\">the last update<\/a> on <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/projects\/westbend-residences.42437\" target=\"_blank\">Westbend Residences<\/a>, <a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/mattamy-homes.14920\" target=\"_blank\">Mattamy Homes<\/a>&#8216; mid-rise condominium development under construction just east of High Park, significant progress has been made in shoring. The site, once home to a low-rise commercial building, has seen the transformation from demolition to early construction \u2014 and now, the shoring and excavation process is adding another layer to the story of this development.<\/p>\n<p>Designed by\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/database\/companies\/bdp-quadrangle.8043\" target=\"_blank\">BDP Quadrangle<\/a>, the 12-storey building will eventually stand 44.08m and be home to 174 residential units at the northwest corner of Bloor Street West and Indian Road. The mixed-use site will also feature three new retail units to the West Bend neighbourhood.<\/p>\n<p><imgx alt=\"Westbend Residences, Toronto, Mattamy Homes, BDP Quadrangle\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-4dc00d16-0461-4da4-a8f4-31e6eca1c9c3\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/07\/53404\/53404-160643.jpeg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/07\/53404\/53404-160643.jpeg', true, ''); return false;\" title=\"Looking northwest to Westbend Residences, image courtesy of Mattamy Homes\"\/><span class=\"image-description\">Looking northwest to Westbend Residences, image courtesy of Mattamy Homes<\/span><\/p>\n<p>Looking back to late June, a flurry of activity has taken place as the crew has moved from shoring work on the Bloor Street side to the north side of the site. The work on the site is dominated by a towering blue shoring rig.\u00a0Its drilling arm is busily creating boreholes for the north-side retaining wall. On the east side, a red shoring machine\u00a0is standing by. In the foreground on the west side of the site, thin steel piles await their turn to be driven into the ground, adding to the robustness of the shoring wall.<\/p>\n<p><imgx alt=\"Westbend Residences, Toronto, Mattamy Homes, BDP Quadrangle\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-cc5c4ce8-c65e-4890-8967-8041d6614bc5\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/07\/53404\/53404-160646.jpeg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/07\/53404\/53404-160646.jpeg', true, ''); return false;\" title=\"Looking north to shoring work in June, image by UrbanToronto Forum contributor SubHuman\"\/><span class=\"image-description\">Looking north to shoring work in June, image by UrbanToronto Forum contributor SubHuman<\/span><\/p>\n<p>A month later, a unique perspective from a subway train passing the site offers a glimpse into the ongoing excavation. From this vantage point, we can clearly see that the excavation has reached one level below ground. The red shoring machine and a truck are positioned in the southeast corner of the site.\u00a0A white construction trailer on the west side and construction materials scattered across the site give a clear indication of the hive of activity of the construction site.<\/p>\n<p><imgx alt=\"Westbend Residences, Toronto, Mattamy Homes, BDP Quadrangle\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-1a588e5e-4e3a-45a1-91e3-0e25d9dd464e\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/07\/53404\/53404-160645.jpeg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/07\/53404\/53404-160645.jpeg', true, ''); return false;\" title=\"Looking south to ongoing shoring and excavation at Westbend Residences, image by Craig White\"\/><span class=\"image-description\">Looking south to ongoing shoring and excavation at Westbend Residences, image by Craig White<\/span><\/p>\n<p>A closer look at the red shoring machine in the southeast corner gives us more insight into the ongoing work. Partially obscured by bags of construction materials, a compact orange excavator machine is also visible, hinting at the multi-layered nature of the construction process. Wooden walls delineate the excavation perimeter around the site, ensuring the safety of the site and barring pedestrian access.<\/p>\n<p><imgx alt=\"Westbend Residences, Toronto, Mattamy Homes, BDP Quadrangle\" class=\"image-display_default\" data-entity-type=\"file\" data-entity-uuid=\"insert-display_default-3b0b6081-48d3-4ecc-bde0-596294c91cce\" data-insert-attach=\"{\" id=\"\" data-insert-class=\"image-display_default\" data-insert-type=\"image\" src=\"https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/07\/53404\/53404-160644.jpeg\" onclick=\"photo('https:\/\/cdn.skyrisecities.com\/sites\/default\/files\/images\/articles\/2023\/07\/53404\/53404-160644.jpeg', true, ''); return false;\" title=\"Looking southeast for a closer look at the shoring machine, image by Craig White\"\/><span class=\"image-description\">Looking southeast for a closer look at the shoring machine, image by Craig White<\/span><\/p>\n<p>As the shoring process continues to unfold, future stages of the shoring project will include further excavation to make way for the building&#8217;s underground levels. The project also entails drilling for boreholes to install a sustainable geothermal heating and cooling system,\u00a0with piping that will reach approximately 275m below ground.<\/p>\n<p>UrbanToronto will continue to follow progress on this development, but in the meantime, you can learn more about it from our Database file, linked below. If you&#8217;d like, you can join in on the conversation in the associated Project Forum thread or leave a comment in the space provided on this page.<\/p>\n<p style=\"text-align: center;\">* * *<\/p>\n<p>UrbanToronto has a research service,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/Pro\/\" target=\"_blank\">UrbanToronto Pro<\/a>, that provides comprehensive data on construction projects in the Greater Toronto Area\u2014from proposal through to completion. We also offer\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/reports\/\" target=\"_blank\">Instant\u00a0Reports<\/a>, downloadable snapshots based on location, and a daily subscription newsletter,\u00a0<a rel=\"nofollow noopener\" href=\"https:\/\/urbantoronto.ca\/NDI\/\" target=\"_blank\">New Development Insider<\/a>, that tracks projects from initial application.<\/p>\n<\/div>\n<p><script>\n!function(f,b,e,v,n,t,s){if(f.fbq)return;n=f.fbq=function(){n.callMethod?\nn.callMethod.apply(n,arguments):n.queue.push(arguments)};if(!f._fbq)f._fbq=n;\nn.push=n;n.loaded=!0;n.version='2.0';n.queue=[];t=b.createElement(e);t.async=!0;\nt.src=v;s=b.getElementsByTagName(e)[0];s.parentNode.insertBefore(t,s)}(window,\ndocument,'script','\/\/connect.facebook.net\/en_US\/fbevents.js');\nfbq('init', '1760257484204295');\nfbq('track', \"PageView\");<\/script><br \/>\n<br \/><script async src=\"https:\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js?client=ca-pub-5143531171910809\"\r\n     crossorigin=\"anonymous\"><\/script>\r\n<!-- News - Bottom -->\r\n<ins class=\"adsbygoogle\"\r\n     style=\"display:block\"\r\n     data-ad-client=\"ca-pub-5143531171910809\"\r\n     data-ad-slot=\"8320848692\"\r\n     data-ad-format=\"auto\"\r\n     data-full-width-responsive=\"true\"><\/ins>\r\n<script>\r\n     (adsbygoogle = window.adsbygoogle || []).push({});\r\n<\/script><br \/>\n<br \/><a href=\"https:\/\/urbantoronto.ca\/news\/2023\/07\/westbend-residences-advances-shoring-operations.53404\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Since the last update on Westbend Residences, Mattamy Homes&#8216; mid-rise condominium development under construction just east of High Park, significant &#8230; <a title=\"Westbend Residences Advances with Shoring Operations\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/westbend-residences-advances-with-shoring-operations\/\" aria-label=\"Read more about Westbend Residences Advances with Shoring Operations\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":20115,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1088],"tags":[],"class_list":["post-20114","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-urban-toronto","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/20114","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=20114"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/20114\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media\/20115"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=20114"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=20114"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=20114"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}