{"id":20148,"date":"2023-07-30T14:28:18","date_gmt":"2023-07-30T21:28:18","guid":{"rendered":"https:\/\/essential.construction\/news\/300m-man-city-stadium-extension-approved\/"},"modified":"2023-07-30T14:28:19","modified_gmt":"2023-07-30T21:28:19","slug":"300m-man-city-stadium-extension-approved","status":"publish","type":"post","link":"https:\/\/essential.construction\/news\/300m-man-city-stadium-extension-approved\/","title":{"rendered":"\u00a3300m Man City stadium extension approved"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div>\n<p>It is anticipated that main construction works will commence on-site in November, with John Sisk widely expected to be named main contractor shortly.<\/p>\n<p>The project will boost the ground\u2019s capacity from 54,000 to 60,000 while creating a \u201cbest-in-class fan experience and year-round entertainment and leisure destination.\u201d<\/p>\n<p>Plans include several connected all-weather facilities integrated into the stadium centred around an expanded North Stand with one larger, single upper tier above the existing lower tier.<\/p>\n<p>This will be completed and open during the 2025\/26 football season.<\/p>\n<p>Above the upper tier, a sky bar with views overlooking the pitch will be built alongside a stadium roof walk experience.<\/p>\n<p>A covered City Square fan zone, with capacity for 3,000 people and a wide variety of food and drink outlets, a new club shop, museum and a 400-bed hotel are also proposed.<\/p>\n<p>The hotel, workspace and public realm works, including City Square, would subsequently complete by late 2026.<\/p>\n<\/p><\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.constructionenquirer.com\/2023\/07\/27\/300m-man-city-stadium-extension-approved\/\" rel=\"nofollow noopener\" target=\"_blank\">This article was originally posted at Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] It is anticipated that main construction works will commence on-site in November, with John Sisk widely expected to be &#8230; <a title=\"\u00a3300m Man City stadium extension approved\" class=\"read-more\" href=\"https:\/\/essential.construction\/news\/300m-man-city-stadium-extension-approved\/\" aria-label=\"Read more about \u00a3300m Man City stadium extension approved\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1089],"tags":[],"class_list":["post-20148","post","type-post","status-publish","format-standard","hentry","category-construction-enquirer","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/20148","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/comments?post=20148"}],"version-history":[{"count":0,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/posts\/20148\/revisions"}],"wp:attachment":[{"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/media?parent=20148"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/categories?post=20148"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/essential.construction\/news\/wp-json\/wp\/v2\/tags?post=20148"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}